1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Etienne CARLIER AB/BT/EC
N. Voumard, AB-BT-EC LBDS Audit, CERN LBDS Trigger Signal Distribution Trigger Synchronization Unit (TSU) Trigger Fan Out (TFO) Power Trigger Unit.
LHC Beam Dumping system
TS2-SPS & TS1-LHC. TS2-SPS (On Monday 15th of June for 24hrs) SPS – HW: Replacement of HV Switch PFN 7 MKP (Impact 65420) SW: « Smooth » upgrade in accordance.
Failure mode impact studies and LV system commissioning tests
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013.
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
LHC Beam Dumping System Status and Readiness for LHC Run II Evian Workshop 2-4 June 2014 Nicolas Magnin – TE/ABT/EC On behalf of TE/ABT team. Thanks to.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
LBDS overview on system analysis and design upgrades during LS1 Roberto Filippini, Etienne Carlier, Nicolas Magnin, Jan Uythoven CERN Workshop Machine.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
LBDS Audit Follow-up Jan Uythoven Thanks to: Etienne Carlier and Brennan Goddard 1.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
LBDS KICKERS MPP workshop - Annecy Nicolas Magnin TE-ABT-EC.
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Kicker generator and controls installation in ECA5? Etienne CARLIER
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
1 Reliability and Availability of the Large Hadron Collider (LHC) MachineProtection System Jan Uythoven CERN, Geneva, Switzerland Thanks to R. Schmidt,
MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.
MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
1 ABTEF - 16/05/2014 Maintenance of safety-critical systems : LBDS - MKD / MKB on LHC.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
18 July Reminder Dilution kicker system MKB is staged (2H, 2V) –Limits extracted intensity at 7 TeV to 50% of nominal –For 25ns spacing, this is.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Commissioning / Reliability Runs / Dry runs 1 Jan Uythoven, LIBD meeting on LBDS Reliability Run 04/02/2014 Nov – Dec 2013 Commissioning individual MKDs.
LBDS MKD tracking related problems. Outline tracking problems: Exchange of MKD compensation/principal PS Same BETS limit for all generators.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
ATS Seminar 13 June 2013: MPP workshop 2013, Annecy Ses.2: Injection, Extraction & Beam Dump Ses.3: Beam Diagnostics Jan Uythoven Thanks to the authors.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
Session 8: What we will do for beam preparation in 2009 G. Arduini, R. Giachino 1Session 8 – Summary - GA24/02/2009.
LBDS Kicker Procedures 11/ Nov LHC interventionActivityStatusEDMS # MKD SwitchRemplacement d’un interrupteur MKD HT + ‘check list’ Wait
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Dependability Requirements of the LBDS and their Design Implications
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
The LHC Beam Dumping System
Fast retrigger path What threshold level we need for the fast trigger path?
LHC beam dump 7.56 TeV operation
LHC Beam Dumping System Reliability Run Summary
MKD/MKB Review Meeting Scope and Definition
Jan Uythoven For discussion
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC Risk Review: Kicker Magnet Reliability
Overview of LBDS related tasks
Monday 6th August & night
Beam Dumping System and Abort Gap
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Jan Uythoven For the LBDS Team
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Saturday 10:00: Cryo Pt8 back, starting the pre-cycle.
Presentation transcript:

1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015

The Events 26/04/15 08:23:  LBDS dilution kicker MKBH erratic trigger at 6.5 TeV  Caused synchronous beam dump, as it should 27/04/15 09:00:  Second erratic on the same MKBH kicker magnet at 6.5 TeV  Also synchronous dump 27/04/15 11:39  LHC stopped for MKBH switch replacement  18:10 access finished 28/04/15 01:41  System operational again 2 J. Uythoven MPP meeting, 8/5/2015

MKB in XPOC 3 J. Uythoven MPP meeting, 8/5/2015 Nominal trigger time

Pulse delays at 6.5 TeV these days 4 J. Uythoven MPP meeting, 8/5/2015 MKBH MKD erratics Local

Small amplitude Dump actually triggered by BETS surveillance of MKB. Slow reaction time of order of 1 ms, resulting in small amplitude of MKB where erratic took place  So limited impact when in anti-phase with another MKB 5 J. Uythoven MPP meeting, 8/5/2015

Switch Exchange Procedure  If two MKB erratics < 4 weeks: exchange the switch For extraction kicker MKD this is after one single erratic, as for the MKD this is an asynchronous dump  Controls tests  HV tests  Energy scan (check XPOC, IPOC limits, energy tracking etc.)  Run at 7.1 TeV for 4 hours in local If this would not have been successful, then complete generator would have been changed. Diagnostics of the switch  Noticed in the tunnel that switch was rather dirty: dust etc. Like noticed for the MKD switches  Back in the laboratory switch HV tested, initially very high spark rate, conditioned away to normal rate  Will be dismounted in the coming week 6 J. Uythoven MPP meeting, 8/5/2015