D Walters Undulator System June 17, 2008 1 Undulator System Components Status Dean Walters.

Slides:



Advertisements
Similar presentations
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
Advertisements

Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Bob Lill LCLS week January 22-24, 2008 LCLS Cavity BPM Production Status.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Air Operated Valve Calibration NMV21
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
Vacuum system.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 RFBPM Windows Joining Effort Undulator System W. Toter, D. Bromberek, F. Depaola,
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
LCWS11 WG4 Fully featured accelerating structure engineering design
Beam Finder Wire Assembly Undulator System
LCLS Extruded Vacuum Chamber Status
Additional Upstream Coil Shielding
Cryomodule Assembly Plan
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
Beam Finder Wire (BFW) Status
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
SNS PPU Cryomodule Space Frame
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

D Walters Undulator System June 17, Undulator System Components Status Dean Walters

D Walters Undulator System June 17, Undulator System Components Status Components Vacuum Components Chamber Quad Spool Bellows EVAC Flanges Diagnostics RFBPM Beam Finder Wire Beam Loss Monitor

D Walters Undulator System June 17, Vacuum Chamber End bi-metal flange welding From: E Trakhtenberg G Weimerslage

D Walters Undulator System June 17, Vacuum Chamber Graphical Display of Surface finish Data Very Desirable Acceptable Should be Avoided From: E Trakhtenberg G Weimerslage The average of all vacuum chambers is mrad in Z′ and mrad in X′, the rms of Z’ is 15.5 mrad and X’ is 36.9 mrad. Selecting the best 33 chambers yields an rms for Z’ of 13.9 mrad and X’ of 34.2 mrad. Extrusions 7, 10, 16, 28 and 35 were sacrificed to verify surface finish in the middle of the extrusions

D Walters Undulator System June 17, Quad Spool Design Flexible mini-bellows Surface finish measurements of the central tube show a roughness of Sq=.18 µm Issue with aluminum plating covering the seal face of the EVAC flange, the vendor has addressed this during the course of the production run. Fifteen units have now been shipped The production run is due to be complete by the end of June

D Walters Undulator System June 17, Bellows Module Initially the supplier had problems with the welding of the SST adapter to the flange. The supplier solved the problem by using the micro-TIG welding process. All (35) units have assembled, baked, packaged, and shipped to SLAC. The last group went to SLAC on 6 June 2008

D Walters Undulator System June 17, EVAC Flange System Flange Permeability Flanges from the manufacturer have been found to have a high (1.21) magnetic permeability. Testing has shown that while the permeability is high it will not interfere with devices in the beamline. Flange Sealing Experience SLAC has started to assemble girders and has had to make vacuum seals using EVAC Flanges. Their initial results have been good and bad. One thing that has been seen is that the pits in the copper gaskets are thought to be a source of leaks. ANL is now inspecting all gaskets for pits before sending to SLAC. SLAC is experiencing what ANL went through before consistent results were achieved. Through testing at ANL it was found that lubrication of the chain clamp is important, ANL is using Dicronite lubricate on all chains in the Undulator Vacuum System.

D Walters Undulator System June 17, BFW Assembly Mounted on Adjustable Support Adjustable Mounting Support (Modified since) Vacuum Pump Connector (2.75” Conflat Flange) Card Position Monitor (Limit switches) Air Supply Shut Off Valve Pneumatic Solenoid Valve Precision Screw Electrical Connectors for Wire Signals Vacuum Chamber Connection Flange (NW-50 CeFix w/Clamp) Beam Port Pneumatic Cylinder Alignment Fiducials Frame Compression Spring Positioner Potentiometer Housing Assembly model courtesy: J. Bailey, ANL

D Walters Undulator System June 17, Moving Slide Assembly (Solid Body) Cylinder Bore Fixed to Frame Kinematic Stop Bottom Plate Secured to Slide Block Kinematic Stop Top Plate Fixed to Frame (Adjustable using precision Screws) Electrical Connector and Feedthrough Secured to Slide Rod Top of Return Spring Fixed to Frame Slide Block Secured to Slide Rod Card Mount Block Secured to Slide Rod Assembly model courtesy: J. Bailey, ANL

D Walters Undulator System June 17, Revised Design Precision Screw Spring Loaded Positioner Locking Screw with Lock Washer Clearance between slide rod and frame Top Kinematic Plate attached to Frame Frame Precision Screws Assembly model courtesy: J. Bailey, ANL

D Walters Undulator System June 17, Beam Finder Wire Repeatability Testing

D Walters Undulator System June 17, “Keyence” Displacement Sensors (Typ.) Repeatability Test Arrangement BFW Repeatability Test Arrangement and Results Physics Requirements: 65 Micron Horizontal & 30 Micron Vertical (RMS)

D Walters Undulator System June 17, Production of the BFW

D Walters Undulator System June 17, Vacuum Conditioning

D Walters Undulator System June 17, Beam Finder Wire Status and Schedule

D Walters Undulator System June 17, RFBPM Production Altair End Caps Production End Caps are in spec electrically and mechanically Problems with polishing resolved Production ramping up with 10 sets first received 4/22/08 Measuremen t LCLS BPM End Caps #1 LCLS BPM End Caps #2 RMS (nm) Sa (nm) PV (nm) RMS (nm) Sa (nm) PV (nm) Average

D Walters Undulator System June 17, K1K2 Au-Ge Au-Sn Au-GE Au-Sn H 2 Sn-Ag-Cu K1 K2 Order of Joining Single Piece Transitions K2K1 Au-Cu Au-Ge Au-Sn Au-Ge Au-Sn H 2 Sn-Ag-Cu Au-Sn H 2 Sn-Ag-Cu This allows windows to be jointed, tested, and selected before joining to the cavity body. Strongest Design Solder Joint Considerations

D Walters Undulator System June 17, Joining Window to Transition Use of a Moly ring limits the expansion of the copper which then limits the compression of the glass window.

D Walters Undulator System June 17, Brazing Fixture This is the body mounted in the fixture for joining the Transitions to the Body

D Walters Undulator System June 17, RFBPM Windows QC Results

D Walters Undulator System June 17, Monitoring Windows Quality

D Walters Undulator System June 17, Repair of Soldered Assembly

D Walters Undulator System June 17, BPM Window Statistics Transition and window soldered with Georo filler material Sub Assemblies are Vacuum checked before brazed to body In the last run of windows being brazed to transitions there were 11 of 13 defect free parts made. Transitions are soldered with Orotin to the bodies

D Walters Undulator System June 17, RFBPM Status and Schedule

D Walters Undulator System June 17, Beam Loss Monitor Beam Line Detector: Detailed and Assembly Drawings: (engineering review and tolerancing). Detector Head. Detector BFW Mounting Bracket. Undulator Motion Tracking Adapter.

D Walters Undulator System June 17, Conclusions Except for the Beam Loss Monitor all other components are in production Items that have completed production Vacuum Chamber Vacuum Chamber Support Beam Finder Wire Support BPM Support Bellows Module : Final Unit 6/6/08 Items still in the process of production BPM cavity - (36% complete) : Final Unit 7/31/08 Beam Finder Wire - (45% complete) : Final Unit 7/8/08 Quad Spool - (45% complete) : Final Unit 6/24/08 Long Break Spool and its support : Final Unit 6/18/08