Launch Vehicles Technical Committee Report - 17th Annual Small Payload Rideshare Symposium Keith Karuntzos - United Launch Alliance Warren Frick - Orbital.

Slides:



Advertisements
Similar presentations
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
Advertisements

The Space Logistics Company
What is a U Class Payload?
Secondary Payloads Overview
Ares V RFI Point of Departure Information Package
This workforce solution was funded by a grant awarded under Workforce Innovation in Regional Economic Development (WIRED) as implemented by the U.S. Department.
GSFC/Wallops Flight Facility 1 Small Satellite Opportunities at Wallops Flight Facility Dr. John Campbell Director, Wallops Flight Facility.
Mission Design Requirements First priority is to deliver takeoff mass to aircraft team. Deliver 5kg item to ISS 24 hour launch lead time Vehicle must be.
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
Architecture Team Industry Day Briefing 17 January, 2002.
Secondary Payload Adapters and Interfaces
1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
1 Atlas Truss Adapter & Launch Vehicle Details (all I can find in the Atlas Mission Planner’s Guide and Standard Interface Spec) David Robinson/543 7/18/08.
Rocket Power Introduction to Rockets and Missiles Scott Schoneman.
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
Rocket Power – Part 2 Introduction to Rockets and Missiles Scott Schoneman 4 Nov 03.
Right-Sized Nanosatellites: Finding the Sweet Spot between 3U/6U and ESPA June 9, 2015 Clint Apland (240)
Spacecraft Launch Vehicles
Launch Opportunities for Standardized Payloads kg The 17th Annual Small Payload Rideshare Symposium June 9-11, 2015 Johns Hopkins University Applied.
Illinois Space Society Tech Team USLI FRR Presentation.
Rideshare Spectrum of Capabilities
LSU 06/23/04COSPAR 2004, HASP Presentation1 The High Altitude Student Platform (HASP) for Student-Built Payloads T.G. Guzik and J.P. Wefel Dept. of Physics.
Tony Monteiro, AA2TX VP, Engineering AMSAT Forum Dayton Hamvention 2011 AMSAT FOX.
Maximizing ISS Utilization for Small Satellite Deployments and External Hardware/Sensor Testing Photo credit: NASA.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
GSFC 5 Space Technology “Tomorrow’s Technology Today” ST5 PDR June 19-20, 2001 Launch Vehicle Services Section 18.0 Clyde Woodall Launch Vehicle Manager.
17 th Annual Small Payload Rideshare Symposium The Johns Hopkins University Applied Physics Laboratory, Laurel, MD June 9, 2015
September 20th TJ Faculty Presentation 2006
1 Commercial Crew Program The Next Step in U.S. Space Transportation Brent W. Jett October 11, 2012 Commercial Crew Program - Same Crew…New Ride.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Space Systems Laboratory University of Maryland test.col.pp4 HERA: Hubble End-of-life Robotic Augmentation – A Robotic Alternative for SM-4 David L. Akin.
AAE 450- Propulsion LV Stephen Hanna Critical Design Review 02/27/01.
Copyright © 2008 United Launch Alliance, LLC. All rights reserved. Images Courtesy of Lockheed Martin and The Boeing Company O22P1-478 SPACE Transportation.
LAUNCH VEHICLE DOWNSELECT A Wide Variety of Launch Systems Are Available Today Initial Downselect Constraint Based Upon UMRM Requirements Primary Payload.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
LRO/LCROSS Launch Preview How Where When Presentation for NASA Solar System Ambassadors and Museum Alliance March 20, 2009 Brooke Hsu, LRO E/PO Lead Brian.
Commercial Space Commercial Space Industries Launchers Cargo vehicles Crew vehicles Space tourism Communications and operations satellites Exploration.
Copyright © 2015 United Launch Alliance, LLC. All Rights Reserved. ULA Rideshare Overview June 9, 2015 Chris Andrews Director, Strategic Planning & Business.
Structural Practices Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Structural Design Practices Payload interfaces to launch vehicles.
Unit 6 Lesson 1 Explanation. In 2004, President Bush set the following goal for the NASA constellation program, “this vision… is a sustainable and affordable.
NASA Expendable Launch Services Current Use of EELV
© 2014 Orbital Sciences Corporation. All Rights Reserved. SPRSA Excess Capacity Panel Carol P. Welsch Orbital Sciences Corporation June 10, Welsch.
New Opportunities for Space Grant CubeSats National Council of Space Grant Directors Meeting, Oct
1 Launch Vehicle Presentation to the Heliophysics Community Workshop Bill Wrobel May 19, 2008.
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
New Opportunities for Space Grant CubeSats WRSGM Jackson, WY, Sept
”Gamma-Ray Imager” - a mission idea for the next ESA call Niels Lund - for the GRI consortium.
Mission data MissionTotal mission duration [d]Crew size [-] Total mission Δv [m/s] from LEO (including mid-course corrections) Lunar flyby Low lunar.
ACE Science Workshop March 10 th, 2009 Armin T. Ellis, Deborah Vane, Mark Rokey Jet Propulsion Laboratory.
NanoRacks, LLC Michael D. Johnson (832) Page No. 1 NanoRacks, LLC Cube Lab Cube Lab Ops TIM – Cube Lab Introduction 11/19/2009 Michael D. Johnson.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Flight Hardware. Flight Profile - STS Flight Profile - SLS Earth Mars 34,600,000 mi International Space Station 220 mi Near-Earth Asteroid ~3,100,000.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
Chamber of Commerce Huntsville / Madison County Small Spacecraft Subcommittee Rich White, Chair (w): (c):
PROJECT PROPOSAL.
Propellant Depot Bernard Kutter United Launch Alliance
Derivation of the FSOA in Ariane 6 Specifications
Vice President, Business Development
Video ULA.
Team A Propulsion 1/16/01.
GOLD-2 – Anticipating Customer Needs
Presentation transcript:

Launch Vehicles Technical Committee Report - 17th Annual Small Payload Rideshare Symposium Keith Karuntzos - United Launch Alliance Warren Frick - Orbital ATK June Rideshare Symposium 2015

Launch Vehicle Technical Committee Descriptions Large Launch Vehicles Technical Committee –This committee will review the status of the current and pending large launch vehicles within the United States. The focus should include both the supply side issues as well as the demand side issues. The compatibility with secondary adapters should be evaluated and the potential availability of secondary opportunities should be discussed; issues of access to secondary capability, scheduling, and manifesting should be identified. Issues, concerns, suggestions, and options should be noted, discussed, and summarized based on the collective views of the committee membership. Foreign Launch Vehicles Technical Committee –This committee will review the status of the current and pending launch vehicles available outside the United States. The focus should include both the advantages and disadvantages of using foreign launchers. The types of secondary adapters or payload interfaces should be evaluated and the potential availability of secondary opportunities should be discussed; issues of access to secondary capability, scheduling, and manifesting should be identified as well as U.S. policies, restrictions, and processes required to take advantage of foreign launch opportunities. Issues, concerns, suggestions, and options should be noted, discussed, and summarized based on the collective views of the committee membership. Small Launch Vehicles Technical Committee –This committee will review the status of the current and pending small launch vehicles within the United States. The focus should include both the supply side issues as well as the demand side issues. Performance, capability, strengths, limitations, availability, affordability should be reviewed. Shortfalls in projected capability and possible increases in demand should be documented; suggestions, concerns, options, and issues should be noted, discussed, and summarized based on the collective views of the committee membership. June 20152Rideshare Symposium 2015

Launch Vehicle Committees Consolidation Recommendation Recommend that the three launch vehicle committees be combined into one committee to support all launch vehicles that provide rideshare offerings Suggested "Launch Vehicle Technical Committee" description –This committee will review the status of the current and pending launch vehicles across the world. The focus should include both the supply side issues as well as the demand side issues. The types of and compatibility with secondary adapters or payload interfaces should be evaluated; the potential availability of secondary opportunities should be discussed; and the issues of access to secondary capability, scheduling, and manifesting should be identified. Issues, concerns, suggestions, and options should be noted, discussed, and summarized based on the collective views of the committee membership. June 20153Rideshare Symposium 2015

Launch Vehicle Rideshare Capability Survey Report The following pages document the rideshare capabilities currently available or in development to support the launch of small payloads This Launch Vehicle Rideshare Capability Report will be an on- going work, to be updated on an annual basis by the launch service providers The report will be available for download from either the SPRSA website or other TBD location later this summer The initial release focuses on larger launch vehicles; we need the community's help in documenting capabilities for all other launch service providers –Please contact Keith Karuntzos at ULA to provide new/updated information June 20154Rideshare Symposium 2015

Large Launch Vehicles Currently Providing Rideshare Capabilities Arianespace –Ariane V, Ariane VI, Soyuz, Vega Lockheed Martin –Athena Orbital ATK –Antares; Minotaur I, IV, V, VI; Minotaur-C, Pegasus XL SpaceX –Falcon 9 United Launch Alliance –Atlas V, Delta II, Delta IV, Vulcan June 20155Rideshare Symposium 2015

Small Launch Vehicles Currently Providing Rideshare Capabilities List TBD June 20156Rideshare Symposium 2015

Delta II P-POD DescriptionA set of three Cubesat P-POD dispensers attached to the Delta II second-stage mini- skirt. VehicleDelta II Capacity3 P-PODs (9 Cubesats) InterfaceP-POD Dispenser Mass1.33 kg (2.9 lb) per 1U Cubesat Volume10 cm 3 (4 in 3 ) per 1U Cubesat StatusOperational; first launch on NASA NPP Sheet Metal Adapter Plate P-POD Mini-skirt Delta II Second- Stage Guidance Section June 20157Rideshare Symposium 2015

C-Adapter Platform (CAP) Payload Volume C-Adapter Platform (CAP) C-Adapter Platform (CAP) DescriptionA cantilevered platform attached to the side of a C-adapter to accommodate secondary payloads. The CAP was originally designed to accommodate batteries that are part of the Atlas V GSO extended-mission kit hardware. VehicleAtlas V, Delta IV Capacity4 CAPs per C-adapter Interface8-in Clampband Mass45 kg (100 lb) Volume23 cm x 31 cm x 33 cm (9 in x 12 in x 13 in) StatusQualified for GSO battery C-29 Adapter June 20158Rideshare Symposium 2015

Aft Bulkhead Carrier (ABC) ABC Payload Volume Aft Bulkhead Carrier (ABC) Atlas V Centaur Second Stage Aft Bulkhead Carrier (ABC) DescriptionAn interface located at the aft-end of the Atlas V Centaur second-stage. A second ABC mission, GEMSat, launched in Dec 2013, and two additional missions are currently on contract for launch by ULA. VehicleAtlas V Capacity1 ABC per Atlas V Interface15-in Bolted Interface Mass80 kg (176 lb) Volume51 cm x 51 cm x 86 cm (20 in x 20 in x 34 in) StatusOperational; first launch on NROL-36 (OUTSat - NPSCuL box with 8 P-PODs) Users Guide aunch_Vehicles/ABC_Users_Guide_2014. pdf June 20159Rideshare Symposium 2015

eXternal Payload Carrier (XPC) XPC Cover XPC Payload Atlas V Common Core Booster Solid Rocket Booster XPC DescriptionAn inert solid rocket booster to hold small payloads for injection into a hypersonic suborbital trajectory. The XPC can accommodate one large payload, or a number of smaller payloads, and all are jettisonable during the sub-orbital trajectory of the first-stage. VehicleAtlas V Capacity1 XPC per launch InterfaceVariable Mass1,810 kg (4,000 lb) Volume21.2 m 3 (750 ft 3 ) StatusConcept Development DeveloperSpecial Aerospace Services (SAS) (Tim Bulk, June Rideshare Symposium 2015

Dual Spacecraft System, 4-m (DSS-4) Centaur Forward Adapter (CFA) DSS canister with 3 plugs shown Atlas V 4-m Extra Extended Payload Fairing (XEPF) DSS-4 DescriptionA modular dual-manifest launch capability for 4-m fairings, using Centaur Forward Assembly hardware. The DSS-4 will have the same on-orbit concept of operations as the Delta II DPAF, delivering the two payloads to the same or similar orbits (Performance-limited). VehicleAtlas V, Delta IV (4-m fairings) Capacity1 DSS-4 per launch, 2 payloads Interface62-in Bolted MassUpper Payload: 2,270 kg (5,000 lb) Lower Payload: 9,000 kg (19,800 lb) VolumeUpper Payload: 365-cm-dia. x 658 cm (144-in-dia. x 259 in) Lower Payload: 254-cm-dia. x 445 cm (100-in-dia. x 175 in) (3-plug) StatusCDR Aft Payload (Notional) Forward Payload (Notional) June Rideshare Symposium 2015

Dual Spacecraft System, 5-m (DSS-5) Payload Separation Ring (2 Places) DSS-5 Aft Payload (Notional) Forward Payload (Notional) DSS-5 DescriptionA dual-manifest launch capability for 5-m fairings, using newly designed composite structure. The DSS-5 is expected to be first used in support of the GPS III program, with a first-flight of a GPS III dual manifest mission in 2017/2018. VehicleAtlas V, Delta IV (5-m fairings) Capacity1 DSS-5 per launch, 2 payloads Interface62-in Bolted MassForward Payload: 5,440 kg (12,000 lb) Aft Payload: 9,000 kg (19,800 lb) VolumeForward Payload: 457-cm-dia. x 762 cm (180-in-dia. x 300 in) Aft Payload: 375-cm-dia. x 487 cm (148-in-dia. x 192 in) (Standard DSS-5) StatusIn development; CDR June Rideshare Symposium 2015

EELV Secondary Payload Adapter (ESPA) 15-inch bolted interface (Six places) Payload envelope (x 6) ESPA Atlas V Centaur Second-Stage Forward Adapter EELV Secondary Payload Adapter (ESPA) DescriptionAn adapter located between the second- stage and the primary payload, which can accommodate up to six secondary payloads. ESPA hardware will be used to launch ANGELS on AFSPC-4 in 2014, and additional missions are being evaluated. VehicleAtlas V, Delta IV, Falcon 9 Capacity6 payloads per ESPA Interface15-in Bolted Interface Mass181 kg (400 lb) Volume61 cm x 71 cm x 96 cm (24 in x 28 in x 38 in) StatusOperational. First launch on STP-1 June Rideshare Symposium 2015

Separating ESPA DescriptionA separating rideshare payload that uses the ESPA ring as the structural bus of the satellite. A separating ESPA can use various separation ring hardware solutions from a number of vendors to separate from the ULA launch vehicle. VehicleAtlas V, Delta IV, Falcon 9 CapacityVariable Interface62-in Bolted Interface Mass1,360 kg (3,000 lb) Volume350-cm dia. x 61 cm (138-in dia. x 24 in) StatusOperational. First launch on LRO/LCROSS LCROSS ESPA 62-in Separation Rings ESPA June Rideshare Symposium 2015

AQUILA DescriptionA flat deck and cylindrical spacers, located between the forward-end of the second stage and the primary payload, providing volume for rideshare payloads inside the AQUILA system. AQUILA modular adapters are rated to support a primary payload mass up to 6,350 kg (14,000 lb). VehicleAtlas V, Delta IV CapacityMultiple payloads per AQUILA InterfaceMission-unique bolted Mass1,000 kg (2,200 lb) Volume142-cm dia. (56-in dia.) x 152 cm (60 in) StatusIn development. CDR , Qualification tests complete Images courtesy of ALS AQUILA (Tall configuration shown with ESPA) Atlas V 4-m Large Payload Fairing (LPF) Primary Payload Volume 8.1 m x 3.8-m dia. (320 in x 148-in dia.) A-Deck June Rideshare Symposium 2015

38” Dual Payload Attach Fitting (DPAF) Payload Separation Ring (2 Places) 38” DPAF Aft Payload (Notional) Forward Payload (Notional) 38-inch Dual Payload Attach Fitting (DPAF) DescriptionA dual-manifest launch capability for 50 inch or larger fairings. The 38-inch DPAF is meant to fly a small-class satellite with an ESPA class satellite. VehiclePegasus, Minotaur I (50" & 61" fairings) Capacity1 38-in DPAF per launch, 2 payloads Interface38-in Bolted MassForward Payload: Max performance of LV Aft Payload: Remaining performance VolumeForward Payload: TBD-cm-dia. x TBD cm (TBD-in-dia. x TBD in) Aft Payload: TBD-cm-dia. x TBD cm (TBD-in-dia. x TBD in) StatusOperational. First launch on SAC-B/HETE June Rideshare Symposium 2015

50” Dual Payload Attach Fitting (DPAF) 50-inch Dual Payload Attach Fitting (DPAF) DescriptionA dual-manifest launch capability for 61 inch or larger fairings. The 50-inch DPAF is meant to fly a Pegasus-class payload with a sub-Minotaur-C class payload. VehicleMinotaur-C (63" and 92" fairings), Minotaur 1 (61" fairing), Minotaur IV, VI Capacity1 50-in DPAF per launch, 2 payloads Interface38-in Bolted MassForward Payload: Max performance of LV Aft Payload/DPAF: Remaining performance VolumeForward Payload: TBD-cm-dia. x TBD cm (TBD-in-dia. x TBD in) Aft Payload: TBD-cm-dia. x TBD cm (TBD-in-dia. x TBD in) StatusOperational. First launch on KOMPSAT/ACRIMSat June Rideshare Symposium 2015 Payload Separation Ring (2 Places) D D 50” DPAF Aft Payload (Notional) Forward Payload (Notional) Payload Separation Ring (2 Places)

63” Dual Payload Attach Fitting (DPAF) Payload Separation Ring (2 Places) 63” DPAF Aft Payload (Notional) Forward Payload (Notional) 63-inch Dual Payload Attach Fitting (DPAF) DescriptionA dual-manifest launch capability for 92-in or larger fairings. The 63-in DPAF is meant to fly a Minotaur-1 Class Payload with a sub Minotaur-C/IV Class Payload. VehicleMinotaur-C with 92” fairing, Minotaur IV, VI, Antares Capacity1 63-in DPAF per launch, 2 payloads Interface38-in Bolted MassForward Payload: Max performance of LV Aft Payload/DPAF: Remaining performance VolumeForward Payload: TBD-cm-dia. x TBD cm (TBD-in-dia. x TBD in) Aft Payload: TBD-cm-dia. x TBD cm (TBD-in-dia. x TBD in) StatusOperational, first launch on GFO/ORBCOMM June Rideshare Symposium 2015

Multiple Payload Adapter Fitting (MPAF) Minotaur Fourth- Stage Multiple Payload Adapter Fitting (MPAP) DescriptionA multiple-manifest launch capability for 92- in or larger fairing vehicles. Eight payload capacity – including 4 ESPA-class payloads. The MPAF hardware can support four ESPA-sized payloads and up to four smaller payloads. VehicleMinotaur-C with 92-in fairing, Minotaur IV, VI, Antares Capacity1 MPAF per launch, up to 8 payloads Interface38-in Bolted MassESPA Class: 181 kg (400 lb) Smaller Payloads: Up to 60 kg (130 lb) VolumeESPA Class: 61 cm x 71 cm x 96 cm (24 in x 28 in x 38 in) Smaller Payloads: TBD-cm-dia. x TBD cm (TBD-in-dia. x TBD in) StatusOperational. First launch on STP- S27 Aft Payloads (2 to 4 Places) Forward Payload(s) Up to Four ESPA-Class June Rideshare Symposium 2015

Minotaur-C P-POD DescriptionA Cubesat P-POD dispenser attached to the Minotaur-C fourth Stage aft structure VehicleMinotaur-C Capacity1 P-PODs (3 Cubesats) InterfaceP-POD Dispenser Mass1.33 kg (2.9 lb) per 1U Cubesat Volume10 cm 3 (4 in 3 ) per 1U Cubesat StatusOperational. First launch on Glory Adapter Plate P-POD Minotaur-C Avionics Section June Rideshare Symposium 2015

Minotaur I Fourth Stage Motor Minotaur P-POD Minotaur-I P-POD DescriptionCubesat P-POD dispensers attached to the Minotaur I and IV fourth Stage motor VehicleMinotaur I with 61” Fairing, Minotaur IV Capacity 1 to 4 P-PODs (up to 12 Cubesats) InterfaceP-POD Dispenser Mass1.33 kg (2.9 lb) per 1U Cubesat Volume10 cm 3 (4 in 3 ) per 1U Cubesat StatusOperational; first launch on MightySat II.1 P-POD June Rideshare Symposium 2015

Pegasus P-POD Description2-U Cubesat P-POD dispenser attached to the Pegasus Avionics Section VehiclePegasus XL Capacity 2x2U CubeSat Dispensors(4 Cubesats) InterfaceP-POD Dispenser Mass1.33 kg (2.9 lb) per 1U Cubesat Volume10 cm 3 (4 in 3 ) per 1U Cubesat StatusIn Development. P-POD Pegasus Avionics Section June Rideshare Symposium 2015

Antares Ride Share June Rideshare Symposium 2015 Antares Ride Share DescriptionLarge toroidal volume VehicleAntares (all models) Capacity Variable InterfaceRail Mount MassUp to 500 kg (1,100 lb) VolumeLocation Dependent StatusIn Development Antares Second Stage

Ariane Structure for Auxiliary Payloads (ASAP 5) DescriptionThe ASAP 5 is a circular platform externally mounted to the forward end of the Ariane 5 upper stage. It can accommodate anywhere from 4 micro payloads to 8 mini payloads, depending on the configuration used. VehicleAriane 5 Capacity1 ASAP5 InterfaceMicro payload mm (11.7-in) Mini payload: 937-mm (37-in) clampband MassMicro payload kg (265 lb) Mini payload kg (660 lb) VolumeMicro payload m (23.6 in) cubed Mini payload m (59 in) cubed StatusOperational. First launch on SPOT 2 Separation System ASAP 5 Platform (8 Microsat Configuration) June Rideshare Symposium 2015 ASAP 5 Platform (2 Minisat/6 Microsat Configuration)

Athena IC, IIC, IIS Athena TBD DescriptionTBD VehicleAthena IC, IIC, IIS CapacityTBD InterfaceTBD MassTBD Volume10 cm 3 (4 in 3 ) per 1U Cubesat StatusIn Development P-PODs Up to 7 Sub-ESPA Class Payloads Orbit Adjust Module June Rideshare Symposium 2015

Athena IIC Athena TBD DescriptionTBD VehicleAthena IIC CapacityTBD InterfaceTBD Mass1.33 kg (2.9 lb) per 1U Cubesat Volume10 cm 3 (4 in 3 ) per 1U Cubesat StatusIn Development 3 ESPA-Class Payloads June Rideshare Symposium 2015 Orbit Adjust Module P-PODs

Falcon 9 TBD DescriptionTBD VehicleFalcon 9 CapacityTBD InterfaceTBD MassTBD VolumeTBD StatusTBD June Rideshare Symposium 2015

Launch Vehicle Points of Contact COMPANYVEHICLESNAME ArianespaceAriane, Soyuz, Vega Lockheed MartinAthenaGregory Orbital ATKAntares, Pegasus, MinotaurWarren SpaceXFalconCurt ULAAtlas, Delta, VulcanKeith Moog CSA Eng.ESPAJoe ALSAQUILAJack June Rideshare Symposium 2015

June 2015Rideshare Symposium