Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC 18 & 19 April 2015 At 450 GeV with bumps, no increased MUFO activity. Beam screen 15R8 warming up to 80 K, ongoing for the day 09:00: Orbit studies.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
SECTOR TEST PREPARATION W. Bartmann, C. Bracco, J. Uythoven LIBD Meeting, 10-Feb-2015.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
Injection test? Mike Lamont For initial discussion.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
31/10/2011LHC 8:30 meeting 1 Overview LHC Operation Week 43 Machine Coordinators: Barbara Holzer & Jan Uythoven.
New ALICE Beam Pipe: Injection Protection C. Bracco on Behalf of ABT/BTP Acknowledgment: M. Giovannozzi.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
R. Assmann - LTC Two Beam Operation R.W. Aßmann with W. Venturini and V. Kain LTC Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Aperture measurements during LHC commissioning 2017
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
SPS extraction, transfer lines, injection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Thursday morning – optics correction
Alice solenoid – orbit distortion
LHC Injection and Dump Protection
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Saturday 2/4/ :00-09:00 Problems with SPS:
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Thursday :00: Physics fill from the night shift
Tuesday 9th November 10:02 Fill beams dumped
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Planning for the week MO M P
Wednesday Ramp single nominal bunches for loss maps
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
RAMP FOR COLLIMATOR SETUP
Another Immortal Fill….
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Report Friday Very efficient last 24h!

08:00-13:30: TDI and LBDS studies: a)Ring injection protection set up for beam2 (+- 6.8sigma for TDI, TCLIA, TCLIB plus TDI angle). Protection verified with injection failure tests with beam. Over-injection mode tested: requires some BLM interlocks disabled for this mode. b)b) Dumpline trajectories verified for beam 1 and beam 2. Dump failure tests with beam. c)c) IR6 aperture scans with bumps for both beams. No sign of abnormal aperture limits.

13:30-15:00: Beam instrumentation checks. a)Q/Q' and coupling measurements. b)Tune stability issue H plane: tune walks around at level.

15:00-23:00: IR aperture checks. a)CMS aperture scan is OK. b)ALICE aperture scan is OK. c)In ATLAS the V plane is OK (respectively similar to the other experiments). The H plane is 'different' from all other IRs. ATLAS dumped with the BCM on both beams, while the machine BLMs never gave any significant signal (in the V plane the BLMs gave the usual signals): both beam1 and beam2. Went to relatively large amplitudes, even though less than in other IRs. Be careful not to draw hasty conclusions.

CMS (vertical)

ATLAS (vertical)

ALICE (horizontal)

00:00-07:30: Separation bumps and crossing angle. a)All bumps switched on individually. No problems (polarity etc). Non-closure and dispersion verified. b)Luminosity scan knobs tested successfully. c)Finally at 06:25 all separation bumps and crossing angles (nominal injection values) switched on and both beams injected with NO major losses. IP8 losses not related to IR setup (stayed unchanged). No sign of problems with cross-talk from MCBX’s (nested IP correctors). d)Orbit saved and bumps removed.

Access: IR6 LBDS IR4 Wire Scanner IR4 undulator Cryo intervention ROD.A45.B2 (replace card)