LCG at Nagoya site 2007/4/19 K.Inami, M.Kaga. 2 Status Upgraded to gLite3 From LCG2.7 Strange trouble in SE Re-install Certificates (user and host) have.

Slides:



Advertisements
Similar presentations
NDU Software Upgrade Software upgrades for the NDU are accomplished through a network connection. Software upgrades for the NDU are accomplished through.
Advertisements

ALICE G RID SERVICES IP V 6 READINESS
Certification Training for Technicians Part 6 – Trouble shooting Page
1 Resolving Host Selector Issues. 2 Table of Contents Page 3 - 6: User unable to connect to an account. Page 7: Host Selector crashing. Page 8 - 9: Saving.
ITE PC v4.0 Chapter 1 1 Operating Systems Computer Networks– 2.
0-1 Team ?? Status Report (1 of 3) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team 1: Auraria.
Hands-On Microsoft Windows Server Connecting Through Terminal Services Terminal server – Enables clients to run services and software applications.
Installing software on personal computer
Printer Installation Ben Wu A&S IT 09/18/2007. Outline  Preparation  Local Printer Installation  Network Printer Installation  Printer Sharing  Other.
Hands-On Microsoft Windows Server 2008 Chapter 8 Managing Windows Server 2008 Network Services.
1 INDIACMS-TIFR TIER-2 Grid Status Report IndiaCMS Meeting, Sep 27-28, 2007 Delhi University, India.
1 Deployment of an LCG Infrastructure in Australia How-To Setup the LCG Grid Middleware – A beginner's perspective Marco La Rosa
1. 2 Move to PKG (SCME) Prepare the new SCME IP phone package and Upload package to SCME System by SCME Admin. CONFIGURATION  Phone Setting  File Upload.
Zhiling Chen (IPP-ETHZ) Doktorandenseminar June, 4 th, 2009.
IRODS performance test and SRB system at KEK Yoshimi KEK Building data grids with iRODS 27 May 2008.
 For Oracle Based Products  Windows XP Professional-SP3 / Window7-SP1 (32 Bit)  Min. Dual Processor or above  RAM 2GB or above  Internet explorer.
BINP/GCF Status Report BINP LCG Site Registration Oct 2009
1 Introduction to the tutorial for site managers Antonio Fuentes Red.es/RedIRIS EGEE/EUMedGrid/EELA Tutorial for Managers Sevilla,
Introduction to network management. INTRODUCTION ● Course Overview ● Course Objectives.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
Site Report from KEK, Japan JP-KEK-CRC-01 and JP-KEK-CRC-02 Go Iwai, KEK/CRC Grid Operations Workshop – 2007 Kungliga Tekniska högskolan, Stockholm, Sweden.
Klaster obliczeniowy WLCG – cz.I Alice::WTU::LCG - skład: VOBOX  alicluster.if.pw.edu.plVM: saturn.if.pw.edu.pl CREAM-CE  aligrid.if.pw.edu.pl VM: saturn.if.pw.edu.pl.
Support in setting up a non-grid Atlas Tier 3 Doug Benjamin Duke University.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks C. Loomis (CNRS/LAL) M.-E. Bégin (SixSq.
March 15, 19991Matt Bishop Recommendations for One- Time Instructional Technology Funds Usage Instructional Technology Infrastructure Subcommittee, Academic.
1 DMG900 + EXP1015 (GSM-GPRS) DMG900 + EXP1015 Sending SMS: to modify REM variables status and required plant information Receiving SMS: plant status,
BDII Server Installation and Configuration Manuel Rubio del Solar Extremadura Advanced Research Center (CETA-CIEMAT) 11th EELA Tutorial for Users Sevilla,
Linux Exercise. Download and Install the latest CentOS version and latest Ubuntu/Fedora OS. Configure a unique Host Name and a permanent IP Address for.
Networks Computer Technology Day 17. Network  Two or more computers and other devices (printers or scanners) that are connected, for the purpose of sharing.
Firewall Configurations Responses from the ETF (the names have been changed to protect the innocent..)
KISTI & Belle experiment Eunil Won Korea University On behalf of the Belle Collaboration.
Derek Ross E-Science Department DCache Deployment at Tier1A UK HEP Sysman April 2005.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
Installing a Network Printer. Network printers work much like any other printer except the data flow is through a network. This means the printer must.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
EGEE is a project funded by the European Union under contract IST VO box: Experiment requirements and LCG prototype Operations.
VO Box Issues Summary of concerns expressed following publication of Jeff’s slides Ian Bird GDB, Bologna, 12 Oct 2005 (not necessarily the opinion of)
High Availability Technologies for Tier2 Services June 16 th 2006 Tim Bell CERN IT/FIO/TSI.
Last update 29/01/ :01 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD CERN VOMS server deployment LCG Grid Deployment Board
Status of the Production ALICE TF MEETING 11/02/2010.
Materials for Report about Computing Jiří Chudoba x.y.2006 Institute of Physics, Prague.
1Maria Dimou- cern-it-gd LCG November 2007 GDB October 2007 VOM(R)S Workshop report Grid Deployment Board.
FTP Client API FTP in embedded devices Implementing an FTP Client FTP Command APIs Other FTP Client APIs.
Status of Tokyo LCG tier-2 center for atlas / H. Sakamoto / ISGC07 Status of Tokyo LCG Tier 2 Center for ATLAS Hiroshi Sakamoto International Center for.
TP: Grid site installation BEINGRID site installation.
Gennaro Tortone, Sergio Fantinel – Bologna, LCG-EDT Monitoring Service DataTAG WP4 Monitoring Group DataTAG WP4 meeting Bologna –
Data transfers and storage Kilian Schwarz GSI. GSI – current storage capacities vobox LCG RB/CE GSI batchfarm: ALICE cluster (67 nodes/480 cores for batch.
INRNE's participation in LCG Elena Puncheva Preslav Konstantinov IT Department.
SAM Status Update Piotr Nyczyk LCG Management Board CERN, 5 June 2007.
/alexwaston14/fix-pc-error u/0/b/ /pages/Fix-PC- Error/
CACI Proprietary Information | Date 1 Sybase Open Client 15.5 ESD#6 Name: Semarria Rosemond Title: Systems Analyst, Lead Date: December 8, 2011.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
If we don’t subnet and use as our subnet mask then we use all of our IP addresses on one network. This is not an efficient use of our Class.
CompTIA Network+ Certification Exam
Kilian Schwarz ALICE Computing Meeting GSI, October 7, 2009
Tor Good + Evil.
Affinity Depending on the application and client requirements of your Network Load Balancing cluster, you can be required to select an Affinity setting.
Overview of the Belle II computing
Belle II Physics Analysis Center at TIFR
VceTests VCE Test Dumps
Installation First Server
CompTIA Network+ Certification Exam
Networking for Home and Small Businesses – Chapter 2
Networking for Home and Small Businesses – Chapter 2
System & Network Administration (MCSA & RHCSA)
Networking for Home and Small Businesses – Chapter 2
Networking for Home and Small Businesses – Chapter 2
Networking for Home and Small Businesses – Chapter 2
COMPUTER NETWORKS AND THE INTERNET Chapter 6
Presentation transcript:

LCG at Nagoya site 2007/4/19 K.Inami, M.Kaga

2 Status Upgraded to gLite3 From LCG2.7 Strange trouble in SE Re-install Certificates (user and host) have been expired. Obtained again Problem in CE-WN connection Installing Belle software Prepared VOBOX for Exp. DB NFS server in local-net of WNs

3 Plan Establish Belle MC production env. Install software Test the data handling Copy from/to KEK Test for the large data samples Prepare more disks How to construct the network, IP address etc. Load test Want to share the Belle data (exp./MC) with KEK and Nagoya Entry to WLCG