1 JD.Berst, U. Goerlach, CMS TRK APR 2003 Status of Hybrid Qualification and Tender Final Technical Specifications –Hybrid types –Quality control, intermediate.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
FE Hybrid status Last preproduction Status Test summary Modifications since November design revue.
VFC-HD Andrea, Christos, Manoel, Tom, William.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CLBv2 Planning: Production of 6 prototypes -> December st Pre-serie 50 units -> April 2014 (following with the current planning) (Need to purchase.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Etam Noah, CERN15 th September 2004Qualification of the CMS Digital Optohybrid Outline: CMS optical digital control links DOH components DOH history and.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Road to SiD Test beam at LNF (Frascati) BTF 23 – 30 June. MarchAprilMay June July 22 June DEAD LINE June: Assembly of electronics parts over the PCB (APV25.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, 2015 (updated on Jan. 23) 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
Results of short module and qualification strategy
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Tracker Outer Barrel Silicon
UCSB Testing Status Anthony Affolder
SKADS Controller’s Meeting Timeline Annual Financial Report
Results from module testing
Recent TOB Developments
Vienna Module Production
Quality Control – Assurance
Hybrid Status/Deliveries
FNAL Hybrid Testing Status
US Module Testing Progress Report
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
MULTISPORTS CENTRE PRESENTATION
FNAL Hybrid Testing Status
US Module Testing Progress Report
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

1 JD.Berst, U. Goerlach, CMS TRK APR 2003 Status of Hybrid Qualification and Tender Final Technical Specifications –Hybrid types –Quality control, intermediate tests and inspections –Some results on FE-Hybrids w.r.t. these criteria Visual inspections Bonding … Delivery Profile of Pre-Production Delivery Profile of Tender

2 JD.Berst, U. Goerlach, CMS TRK APR 2003 FE-Hybrids Types Latest modifications in April 2003 Lamination onto ceramic stiffener is a very critical operation 12 different types of combinations (the opposite of what was originally intended!!) –TIB, TOB, TEC –4 or 6 APV –Connector up and down –r  and stereo ceramic (5) 1 TEC, 2 TOB, 2 TIB APV25, positioning and bonding Thermal cycle (simple, no bias) Final acceptance test FHIT

3 JD.Berst, U. Goerlach, CMS TRK APR 2003 Quality Control IPC-A-600F and IPC-A-610C, class 3 Lamination: –detailed procedure, although recent failure is not understood. –Crucial visual inspection of lamination after all processing steps Cleaning: has improved after some iterations APV positioning and bonding is crucial (cost driving?) element –Certainly at limit of industrial standards –Detailed specs for precision placement and bonding Dicing of APV-wafer is included as an option (1), ask for separated costing Trace-ability of APVs at Wafer level Trace-ability of individual APVs: Option (2) Short temperature cycle is an option (3) FHIT final functionality test (100%) and record for DB

4 JD.Berst, U. Goerlach, CMS TRK APR 2003 Positioning of APVs

5 JD.Berst, U. Goerlach, CMS TRK APR 2003 Positioning of APVs TOB, Hybrid SA, 1st series, 55 measured Kapton on ceramic Overall shrink: 27 µm % should be in this area

6 JD.Berst, U. Goerlach, CMS TRK APR 2003 Positioning of APVs TOB, Hybrid SA, 2nd series, 45 measured Kapton on ceramic Overall shrink: 31 µm % should be in this area

7 JD.Berst, U. Goerlach, CMS TRK APR 2003 Positioning of APVs TIB, Hopp, series of 40 measured Overall shrink FR4: 15 µm APV0-5APV0-4APV0-1 95% should be in this area

8 JD.Berst, U. Goerlach, CMS TRK APR 2003 Bonding Strength GS-Hopp, TIB Hybrid_SA, TOB

9 JD.Berst, U. Goerlach, CMS TRK APR 2003 Pre-Production I « M900 » 300 TOB ordered (ceramic) –16+80 delivered December > CERN –31 FNAL –5 UCSB –2 KA –40 CERN 29 with PA (25 bonded), 5 active thermal cycle –100 delivered end Jan 2003, –bad lamination –Can only be used for system tests –20 TOB made in Feb/March, OK given end March –80 to be done, in production –Lamination complete –50 finished, 45 ok with FHIT, now in Strasbourg –26 will be ready today –FHIT remained at factory 200 TIB and 200 TEC ordered in Jan 2003 Problem not understood!

10 JD.Berst, U. Goerlach, CMS TRK APR 2003 Pre-Production II « Large volume order by CERN » –4370 TEC/TIB/TOB ordered, – considered as single production –With new designs never prototyped! –Qualification batch: 3 lots of ca. 100 in production Lamination of TEC about to start after electrical test Also bad circuits will be laminated for tests Evaluation sample, delivery ca. May 6: –10 TOB: 5x 4-APV_rphi_down, 5x 6-APV_rphi_up –10 TIB: 5x 4-APV_rphi_down, 5x 6-APV_stereo_up –10 TEC: 5x 6-APV_down, 5x 4-APV_up 3x 90 TOB, TIB, TEC delivery (2 weeks) not before May 20 –Production batches Start May 6(?), circuits tested mid June Lamination starts June 20, pcs/ week, finnish end July Assembly and test: could start June 23, 600/week Delivery to CERN starts July 7, finish beginning of Sept

11 JD.Berst, U. Goerlach, CMS TRK APR 2003 Tendering Status Technical specifications are « frozen » Documents for French administration: –Translation of Technical Specification into French CCPT, Cahier des Clauses Techniques Particulières CCAP, Cahier des Clauses Administratives Particulières RDC, Règlement de la Consultation Journal officiel des communautés européennes –All submitted on Monday, 07/04 to in2p3 Official Start of Tendering 15 th of April 2003 –All documents are/will be available on the ftp site: ftp://lepsi.in2p3.fr/pub/berst/CMS_HYBRIDS_AO /TIB; /TOB; /TEC; –“Appel d’offre ouvert” –Open for 52 days (end 17 June 17:00) Opening of letters in week 25 (16/06) Place Contract before 14 th of July

12 JD.Berst, U. Goerlach, CMS TRK APR 2003 Production Delivery Profile