Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.

Slides:



Advertisements
Similar presentations
Air and Water Chiller Basic Class
Advertisements

Presenter: Ryan Stoner Partner: Deyzi Ixtabalan Arizona State Univeristy.
Mechatronics Final Project Alfonso Cozzo Vinay K.M Xin Wan.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier Cooling Loop 20 September 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Degradation 28.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
Timeline on the laser setup Show a conceptual design on the metal box, 2 iterations Check design, i.e. all details fit the actual physical constraints,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 3 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.
Reflow Oven System Ryan Kennedy ELT2720 Project 2008.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
7/17/02Reyco Henning -- TRD Box S Component Testing 1 TRD Box S Solenoid Valve Testing AMS TRD Meeting, CERN, July 2002 U. Becker, G. Carosi, R. Henning,
Experts in Chem-Feed and Water Treatment An Overview of Possibilities Dulcometer Disinfection Controller ( DDC )
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
Component Environmental Test Chamber Jeff Hughes 1, Peter Adam 1, Thong Vo 2 and Phong Ngo 2 1. Department of Mechanical and Material Engineering, 2. Department.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Panja Luukka1 Silicon beam telescope (SiBT) and MCz detectors: status and plans for 2008 Erkki Anttila, Sandor Czellar, Jaakko Härkönen, Matti.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Interactively change status, schedules, setpoints and strategies
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Thermal Control System. The Three Mechanisms of Heat Transfer Conduction - The transfer of heat through a solid –Interface Heat Exchangers –Cold plates.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Fish Tank Project Introduction ME 121Portland State University Mechanical and Materials Engineering.
Testing the Enclosure Original Plan: Intrinsic safety and wireless communication New Plan: Sensor circuitry and relay together, and totally enclosed EE.
FPix DCS Subgroup Report
Phase 2 Outer Tracker Module analysis
Digital and Analog communication Network - EK Engineering (India)
ROD assembly and test in US
DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL
UCSB Testing Status Anthony Affolder
On behalf of the US TOB testing group
US Module Testing Progress Report
US Module Testing Progress Report
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group

Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Designed Pitch Adaptor Antenna à In Machine Shop Assembly of Cold Box with all Sensors First System Test using full modified CERN Code à Temperature Sensor Test à Humidity Sensor Test

Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Pitch Adapter Antenna

Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress à

Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 1st Cold Box System Test

Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Complete T/E Element Cabling à Assembly of Relay Control Board T/E Element Testing à CERN Code à Chiller Water à Room Temp to - 20 deg C Fabricate Flow Control Panel (see photo) à 19” Panel in HEP Shop (Chris) à Lance to start assembly soon

Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel

Slide 8UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel

Slide 9UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel Note following components à Digital I/O board à Solid State Relays à Solenoid valves à Flow sensor

Slide 10UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Peltier Relay Board