Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Chapter 3 Managing the Information Systems Project
INFO 638Lecture #81 Software Project Management Cycle plan and build INFO 638 Glenn Booker.
5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global.
Dynamic Systems Development Method (DSDM)
Progress Report TDP-CART 15m Offset Antenna Collaboration National Research Council Herzberg Institute of Astrophysics Dominion Radio Astrophysical Observatory.
Goals of DVA-1 Meeting Overall goal: build an SKA antenna with SKA feeds/receivers, verify performance and fabrication/costs for the next stages of the.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Project Plan Development
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Planning. SDLC Planning Analysis Design Implementation.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
Transition from SKADS to PrepSKA Richard Schilizzi Lisbon, 3 October 2008.
PLANNING AND SCHEDULING
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Object-oriented Analysis and Design Stages in a Software Project Requirements Writing Analysis Design Implementation System Integration and Testing Maintenance.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
DVP Testing Neil Roddis Apr 15, SPDO Why is test and verification so important for SKA dishes? Capital cost: design for low cost of a few thousand.
Information System Project Management Lecture three Chapter one
1 CS 501 Spring 2004 CS 501: Software Engineering Lecture 2 Software Processes.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Dish Verification Antenna – 1 Project NRC - Herzberg Gary Hovey 18 November 2013.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Managing programs that promote personal effectiveness.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Information Technology for Management Chapter 13: Project Management and SDLC Prepared by.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Team-Based Development ISYS321 Managing the Information Systems Project.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Introduction to Project Management Darren Trofimczuk.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
6 May 2009Lynn Baker AWG Meeting LA1 TDP Antenna and Feed Plan Lynn Baker Antenna Working Group Meeting Los Angeles, CA May 6, 2009.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Rob Connatser NSS Instrument Work Packages and XLPM.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Chapter 11 Project Management.
Camera PDR/CD1 Planning 19 September 2008
Managing the Information Systems Project
Chapter 6: Database Project Management
Project Management Lifecycle Phases
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
Time Scheduling and Project management
Presentation transcript:

Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 2 of 20 Contents Reflector Project Scope Project Phases and Milestones Key Objectives, Outcomes and Issues by Phase Conclusions

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 3 of 20 DVA-1 Reflector Project Scope What are the DVA-1 Goals Pertaining to the Reflector? Performance Requirement –Reflecting surface that meets maintains it shape over specified operating conditions (wind, temp, gravity). Cost Requirement –Demonstrate its affordable and has superior cost/performance. –Prototype can be built with available budget and meet performance requirement. Schedule Requirement –Built within the timeframe of PrepSKA? –Built within the timeframe agreed upon in advance? –Built roughly within the timeframe agreed upon?

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 4 of 20 Scope Issues Budget, resources and schedule are limited. Requirements are in conflict and need to be prioritized. What are we designing for? –Schedule? Which schedule? SKA, Hard or soft deadline? –Cost? –Performance?

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 5 of 20 Proposed Reflector Scope Requirements Requirements in Priority 1.Performance: Must meet SKA performance specifications 2.Cost: Must be within DVA-1 budget and demonstrate SKA cost/performance 3.Schedule: Must be adapted to fit performance and cost requirements.

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 6 of 20 Proposed Responsibilities and Tasks What does the reflector work include? Reflector performance and cost key drivers. Reflector performance and schedule dependent strongly (mainly/mostly) on back-up structure and feed. Propose reflector consists of: Surface, backup structure, feed & sub-reflector support. These need to be considered together as an integrated whole. Reflector Interfaces: indexer/receiver box, sub-reflector and turret frame.

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 7 of 20 Key Reflector Requirements/Specifications Performance –Reflector shape and feed/sub-reflector support specs –Dynamic tolerances specs as function wind, gravity and temperature. –Mount interface specs. Cost –Available budget –Available infrastructure –Available resources and definition of project scope Schedule –Clear goals and deliverables with achievable deadlines These need clarity to make progress

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 8 of 20 Proposed Reflector Project Phases Four Phase Project –Concept Design Phase -> Concept Design Review –Preliminary Design Phase -> Preliminary Design Review –Detailed Design Phase -> Critical Design Review –Fabrication Phase -> Fabrication Acceptance –Test Phase -> Project Complete Clear specifications, objectives and deliverables for each phase are needed to ensure performance, cost and schedule requirements.

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 9 of 20 Reflector Concept Design Phase Objective: Define project based on feasible design concepts. Duration: 2-3 months once requirements/specifications set. Outcomes –Concept design Based mainly on estimation, calculation and simulation Feasible design that meets overall performance, cost and schedule requirements Risk items identified –Baseline project plan including: Initial WBS, costs and schedule Risks: technical, cost, schedule Plan to address risks

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 10 of 20 Key Concept Design Issues Need to define surface shape specifications –What diameter: 12m or 15m? At CoDR? Now?? –What antenna pattern? What is optimized? Aeff Aeff/Tsys Near and far sidelobe response Symmetry, stability, uniformity –Need to understand calibration, imaging and computing impact Select or defer backup structure approach to prelim design? To what extent are PAFs considered? Need clarity on design goals: Performance, budget, schedule? Need clarity on available budget and constraints. CoDR can’t be done without these issues resolved.

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 11 of 20 Reflector Preliminary Design Phase Objectives –Sketched out design in non-risk areas –Detailed design/studies in riskier areas Duration: 2-3 months once CoDR complete Outcomes needed –Preliminary design Materials selected and their performance known Risk items addressed Based on calculation, simulation and measurement Technical risk low –Updated project plan Schedule and cost risk quantified Detailed design plan well defined Fabrication and test plan well understood.

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 12 of 20 Reflector Preliminary Design Activities Material studies/testing Finalize composite materials Select/refine backing structure Refine feed support Possibly, procure mold(s) as soon as surface defined.

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 13 of 20 Reflector Detailed Design Phase Goal: Fully specify design, as well as, fabrication and test plans Time needed: 4-6 months once PDR complete. Outcomes needed –Fully specified design. –Risks low: Costs, schedule well determined. –Detailed fabrication and acceptance plan(s) Activities, WBS, deliverables, costs and schedule –Detailed test plan

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 14 of 20 Detailed Design Issues This is mainly a fill in the blanks phase. To what extend do we validate dynamics (wind, temp, resonance)? Schedule vs cost risk How much design margin is carried? –Material cost vs performance and schedule risk Can molds be ordered before CDR? Schedule vs cost risk

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 15 of 20 Reflector Fabrication Phase Objectives: fabricate/assemble reflector, back-up structure, feed/sub support. Duration: 6-9 months (not including setup/procurement) Outcomes –Sub-assembly fabrication and acceptance complete Reflector surface Backup structure Feed/sub support –Assembly complete and ready for test on mount

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 16 of 20 Fabrication Phase: Issues Lead time for procurement of materials Lead time for preparing site for fabrication What facilities on-site can be used? Site regulation and procedure issues Schedule and cost overheads due to the location Costs magnified if project delayed Clean-up costs

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 17 of 20 Reflector Test Phase Objectives: Determine reflector assembly performance Duration: 2-4 months Outcomes Reflector metrology tests –Over gravity, temp, wind Simulated antenna pattern response Measured antenna pattern and holography measurements

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 18 of 20 Reflector Test Phase Issues Separating dynamic reflector performance from the mount. Testing over temperature extremes difficult Testing over wind conditions/requirements difficult Schedule and cost overheads due to the location

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 19 of 20 Timeline Q2Q3Q4Q1Q2Q3Q4Q1Q2 Concept Design Preliminary Design Detailed Design Fabrication Reflector Testing Buy Molds

DVA-1 Meeting Washington 15 April 2010 DVA-1 Reflector Development Timeline G. Hovey 20 of 20 Conclusions Reflector project reasonably complex. Need to better define scope and responsibilities Number of requirements/issues need to be address/resolved. Project plan, design phases and reviews needed These would inform key decisions.