DESY PRC May 10, 20071 Status of OLYMPUS -Project DESY PRC MAY 5, 2009 OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the.

Slides:



Advertisements
Similar presentations
Guenther Rosner FAIR - UK DL, 11/10/06 1 Collaboration Universität Basel, IHEP Beijing, [University of Birmingham] Ruhr- Universität Bochum,
Advertisements

ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
B. KetzerGEM-TPC GEM-TPC Meeting Bernhard Ketzer Technische Universität München 14 February 2008 Telephone Conference.
Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
DESY PRC May 10, Beyond the One Photon Approximation in Lepton Scattering: A Definitive Experiment at DESY for J. Arrington (Argonne) D. Hasell,
Luminosity Monitor MWPCs. Status and plans. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Luminosity Monitor MWPC status report A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Status at DORIS Hall Bolted connections of Al- frame made conductive for grounding reasons. Power cable connections rerouted at the top connections. Magentic.
DCal Meeting
Luminosity Monitor Hampton University, Hampton, VA Jefferson Laboratory, Newport News, VA USA OLYMPUS Collaboration Meeting, DESY, July 17-18,
Richard Milner April 22, Internal Target Experiment at DORIS Proposal of a new experiment at DORIS using the available MIT-BLAST detector and.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
OLYMPUS U.Schneekloth/R.Beck PRC closed session
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Richard MilnerDESY April 6, OLYMPUS Overview Motivation for the experiment Progress to date on the experiment The path forward.
Research Support Services UCH Facility Use Approval Workflow Management Update Jennifer Holcomb.
1 SciBar for Booster Neutrinos T. Nakaya (Kyoto) March 30, 2005.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
Time with Office of Sponsored Programs January 5, 2010 Topic: Responsible Conduct of Research Training.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
Apr 18, 2006 Kaushik De 1 Recent ATLAS Achievements at UTA  Tier 2 up and running  Increased activities at CERN  Kaushik – 1 year sabbatical  3 research.
1 Referee Report Olympus Elke Aschenauer Desy PRC, April 2011.
The EU-US Science & Technology Agreement: An NSF Perspective David E. Schindel, Head National Science Foundation Europe Office American Embassy, Paris.
Astroparticle Physics at DESY IceCube CTA Recommendations.
K. Barish Kenneth N. Barish …………… 19 August, 2004 MRI Roadmap  NSF Major Research Instrumentation Program (MRI) guidelines  Submission procedure  How.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Tracking Group Overview Bruce Schumm SLAC Linear Collider Workshop January
METROPOLITAN TRANSPORTATION COMMISSION Key Steps to Delivering Project 1.Lead agency submits final project scope, budget and schedule to MTC 2.MTC.
Status of Cooperation between JINR and German Research Centres A.N. Sissakian A.N. Sissakian 5th Workshop on the Scientific Cooperation between German.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
Status of QUACO project
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
COMPASS FRC – November 29, COMPASS FRC Novembre 29, 2013 COMPASS – phase II MoU Technical Coordinator Preparations for 2014 run Publications.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Exploring QCD with Antiprotons PANDA at FAIR M. Hoek on behalf of the PANDA Collaboration IOP Nuclear and Particle Physics Divisional Conference 4-7 April.
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
News from DESY. Joachim Mnich Plenary ECFA CERN, November 2011.
1- Handling The Olympus GEMs at MIT-BATES between June 6th-August 8th Manufacturing The GEMs at HU-GEM LAB since Sep 2010 OZGUR ATES HAMPTON UNIVERSITY.
Plan Of Work UGA Extension Program & Staff Development.
Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.
Organization and Goals for the Workshop
Electromagnetic Calorimeter Development at NCCU
MICE Project in the US: Completion of Efforts
THE GRANT-MAKING PROCESS
Baby-MIND for T2K collaboration
Francesco Forti University and INFN, Pisa
NSF GOALI (Grant Opportunities for Academic Liaison with Industry)
CVR Postdoc Award An opportunity for CVR postdocs to secure a small grant to support the pursuit of an independent project. It also offers a valuable.
THE GRANT-MAKING PROCESS
Workforce / Students / Tasks
TDIS mTPC update Nilanga Liyanage and Kondo Gnanvo UVa
Detector Proto-Technical board Sep 30, 2010
Instructional Planning Council October 5, 2018
Presentation transcript:

DESY PRC May 10, Status of OLYMPUS -Project DESY PRC MAY 5, 2009 OLYMPUS-Proposal conditionally approved by PRC October 2008: 1.) details of the OLYMPUS installation and running have to be worked out 2.) necessary funding becomes available Status on 1.) Detail plan for OLYMPUS installation and running has been worked out, presented and approved at the OLYMPUS- collaboration meeting April, 2009 Responsibilities: BLAST-detector: MIT, University of Colorado, Arizona State University Target: MIT, INFN Ferrara, Universität Erlangen-Nürnberg New Intersection point: DESY, MIT, St. Petersburg NPI New Luminosity Monitor: Hampton University, INFN Bari, INFN Rome Trigger, DAQ: Universität Bonn, Universität Mainz Electronics: Universität Bonn, MIT, Universität Mainz Tracking detectors: MIT, INFN Rome, Universität Mainz Particle Identification: University of Glasgow, Arizona State University Timing Scintillators: University of New Hampshire

DESY PRC May 10, 20072Richard MilnerDESY April 6, OLYMPUS proposal conditionally approved by PRC in October 2008 Requests submitted to funding agencies: December 2008 (Germany) and January 2009 (US) Remove ARGUS experiment in Summer 2009 Ship BLAST/OLYMPUS detector and OLYMPUS target in summer/fall 2010 Modify DORIS beamline and install OLYMPUS target in DORIS in winter 2010/11 shutdown. Install complete OLYMPUS experiment in summer 2011 Commission in fall 2011 Take data in 2012 Timeline DESY PRC MAY 5, 2009

DESY PRC May 10, Status of OLYMPUS -Project DESY PRC MAY 5, 2009 Status on 2.) Necessary Funding German groups submitted grant request to the BMBF, December 2008 American groups submitted grant request to NSF and DOE January 2009 Funding Requests: Transportation BLAST-detector: 500,-k$ only American Groups DOE Target: 450,- k$ only American Groups NSF,DOE Luminosity Monitor: 120,- k$ only American Groups NSF,DOE Trigger, DAQ: 235,- kEuro Bonn, Erlangen, Mainz BMBF Postdoc, PhD-Students 480,. kEuro Bonn, Erlangen, Mainz BMBF New Intersection Region: 280,- kEuro only European groups DORIS Modifications: 487,- kEuro all groups OLYMPUS Operation Costs: 585,- kEuro all groups DORIS Operation Costs: 450,- kEuro direct request to BMBF or DESY

DESY PRC May 10, Manpower OLYMPUS -Project DESY PRC MAY 5, 2009 Institute (Faculty) Scientist PhD-Student Engineer Requested (FTE) (FTE) Bonn: R. Beck, F. Klein, 2 * (0.5 FTE) 1 2 * (0.25 FTE) 1 Postdoc H. Schmieden Mainz: A. Denig, F. Maas 3* (0.30 FTE) 1 2* (0.25 FTE) 1 Postdoc D. von Harrach Erlangen: E. Steffens 1* (0.30 FTE) 1 Postdoc American Groups: Milner, Matthews, Redwine 3 * FTE 2* (0.5 FTE) 2 Postdocs Alarcon, Kohl, Crawford, 3 PhD-students Calarco, Kinney Glasgow: Rosner, Kaiser 1 * (0.5 FTE) 1* (0.5 FTE) will request 250k€ Petersburg: Belostotski 2* FTE 1* FTE will apply in 2010

DESY PRC May 10, Institute (Faculty) Scientist PhD-Student Engineer Requested (FTE) (FTE) Italy groups De Leo, Nappi 2 * FTE 1 * (0.25 FTE) Ferretti Dalpiaz Lenisa, Cisbani, Frullani, Garibaldi DESY: F. Brinker, U. Schneekloth, Y. Holler, 1 * FTE (W. Hain) 2 * (0.5 FTE) Manpower OLYMPUS -Project DESY PRC MAY 5, 2009

DESY PRC May 10, 20076