March 23, 2009H.J. Krebs1 BaBar D&D Schedule & Budget Overview H. James Krebs March 23, 2009.

Slides:



Advertisements
Similar presentations
CATIA V4 Software Deployment Project Proposal
Advertisements

Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
What is a project? Project Management Institute definition
October 21, 2003H.J. Krebs1 LST Mechanical Design Review West Coast Team Mechanical Engineering and Design Manpower & Organization H. James Krebs October.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
May 5, 2004H.J. Krebs LST Installation Readiness Review 2004 IR-2 Installation Schedule H.J. Krebs May 5, 2004.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
Software Engineering Institute Capability Maturity Model (CMM)
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
Project UF Practical management of projects Randy Graff, PhD.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
August 6, 2007Bill Wisniewski1 D&D Task Force: PEPII team: S.DeBarger, S.Ecklund, A.Hill, D.Kharakh, M.Zurawel BaBar team: H.J.Krebs, S.Pierson, W.Wisniewski.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Project management Lecture 10. Topics covered Management activities Project planning Project scheduling Risk management.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
11/15/02H.J. Krebs IFR Improvement Phase II (Barrel) Mechanical Engineering Issues H. James Krebs November 15, 2002.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
July 7, 2008Bill Wisniewski1 Identify the assets Look at reuse potential Preserve the assets Minimal maintenance state Settle ownership Plan & execute.
1 Chapter 3: Project Management Chapter 22 & 23 in Software Engineering Book.
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
B Factory D&D Review: March 23, 2009 Page 1 B Factory D&D: Strategy Overview S. Kahn Director, PPA.
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
Oct 17, 2001SALT PFIS Preliminary Design Review Management, Schedule, & Budget 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Management,
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Resource Loaded Schedule and Budget Profile
Integration meeting F.Raffaelli
Archiving and Document Transfer Utilities
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Bill Wisniewski SuperB Frascati Meeting September 30, 2010
LST Mechanical Design Review
Management Breakout: MREFC Budget Summary Victor L
Project management Lecture 9
Magnet, Support and Infrastructure
Presentation transcript:

March 23, 2009H.J. Krebs1 BaBar D&D Schedule & Budget Overview H. James Krebs March 23, 2009

H.J. Krebs2 Outline of Presentation Basis of estimates – both cost and schedule Overview of Project Schedule Overview of Cost Estimate Final comments

March 23, 2009H.J. Krebs3 BaBar Detector ‘Ideal’

March 23, 2009H.J. Krebs4 BaBar Detector

March 23, 2009H.J. Krebs5 BaBar Detector Disassembly BaBar completed the IFR upgrade in Fall This upgrade took place over three campaigns: IFR Forward Endcap Resistive Plate Chambers in 2002, 1 st third of IFR Barrel Limited Streamer Tubes in 2004, balance of IFR Barrel sextants with LSTs in –Barrel upgrade required uncabling of forward end of SVT and forward end of EMC, load transfer of EMC, removal of most of the corner blocks fore and aft, removal of flux bars, releasing some of the cryostat restraints, pulling forward doors to walls. –Experience gained in these campaigns plus experience from the initial detector assembly provide excellent input for planning the detector disassembly schedule and estimating the required manpower (both labor and engineering), as well as M&S.

March 23, 2009H.J. Krebs6 Project Schedule A Detailed BaBar D&D Project Schedule is provided on the web site (March 1, 2009) 51 months duration Project start date July 1, 2008 Five Project Phases (Subprojects) –Project Management –Engineering and Tooling Refurbishment –Peripherals Disassembly –Core Disassembly –DIRC/EMC System Disassembly May not be needed if major components are reused in a Super B Factory Statused and updated weekly Assumptions –The sequence, estimated time durations and personnel assignments are based on experience from the original 1997 to 1999 installation and the three IFR Upgrade campaigns that occurred in 2002, 2004, and 2006 –The disassembly sequence is approximately a reversal of the original installation –Reuse of the original installation tooling for the disassembly process –Use of personnel knowledgeable in the assembly of BaBar –Retrieval of subject matter experts as needed

March 23, 2009H.J. Krebs7 Project Schedule (Cont’d) Assumptions (Cont’d) –Major components are removed in two designated locations Collision area – the present location of BaBar Main disassembly area – 12.3 meters east of present location –Requires detector roll-out –Dismantling tasks performed sequentially Tooling refurbishment performed in parallel at IR-12 and B750 Can be optimized with additional work crews Experienced supervision may not exist for multiple crews –Ownership issues associated with detector components and/or systems with potential reuse are settled no later than end of calendar year 2009 –Includes an educated fudge factor in the task durations associated with the new Work Planning and Control Program

March 23, 2009H.J. Krebs8 Project Schedule (Cont’d) Potential Schedule Risks: –Issues associated with the metals suspension Controlled storage Materials tracking database –There are components that cannot be removed in a reverse process Barrel IFR brass absorber plates –Unanticipated events Extended illnesses of key individuals Non-SLAC related injuries Lab closures Power outages Striking bargaining unit workforce (Existing contract ends September ’09) –There is little design documentation that exists of the original installation Rely heavily on institutional knowledge of key personnel –Unanticipated and changing SLAC and/or DOE requirements –Ownership issues and the decision to build the Italian SuperB may not be settled as scheduled (December ’09) –Indoor controlled storage space may not be available –Effects of Continuing Resolution and/or lower-than-expected budget profile The pre-disassembly phase is nearing completion: –Planning –Preliminary engineering –Tooling refurbishment –Minor peripherals disassembly, removal and cleanup from outside of the shield wall

March 23, 2009H.J. Krebs9

March 23, 2009H.J. Krebs10

March 23, 2009H.J. Krebs11 Core Detector Disassembly Flow Chart and Performance Measurement Milestones

March 23, 2009H.J. Krebs12 Cost Estimating Cost estimate spreadsheet is posted on the web site Costs include Direct plus Indirect Contingency is managed by the Project Manager Labor Rates –EDIA Project Manager$22.92K/mo Deputy Project Manager$22.92K/mo Physicist$20.83K/mo Safety Officer$16.67K/mo Senior Engineer$20.83K/mo Designer$16.67K/mo S&E Associate$16.67K/mo –Labor Sr. Tech/Rigger/Electrician$14.17K/mo

March 23, 2009H.J. Krebs13 Cost Estimating Costs are estimated at outline level 3 –1.4 DETECTOR CORE DISASSEMBLY FWD EAST END DOOR –EDIA »Safety Officer.1 man mo.=$1.67K »Senior Engineer2 man mo.=$41.67K »S&E Associate2 man mo.=$33.33K –Labor »Sr. Tech/Rigger6 man mo.=$85.00K –M&S=$5.00K –Total 1.4.6=$208.3K

March 23, 2009H.J. Krebs14 PhaseED&I ($K)M&S ($K)Labor ($K)Cont ($K)Total ($K) Project Management FY08350 FY FY FY FY Engineering and Tooling Refurbishment FY FY FY FY Peripherals Disassembly FY FY FY FY Core Disassembly FY FY FY FY DIRC/EMC System Disassembly FY FY

March 23, 2009H.J. Krebs15 Budget Breakdown Breakdown by Project Phase –Project Planning & Management$3580K –Engineering and Tooling Refurbishment$4449K –Peripherals Disassembly$1223K –Core Disassembly$3515K –DIRC/EMC System Disassembly$2354K Breakdown by Fiscal Year –FY2008$400K –FY2009$3966K –FY2010$4595K –FY2011$4009K –FY2012$2151K Project Total$15,121K –EDIA$6341K –M&S$1308K –Labor$4215K –Contingency$3257K(27.4%)

March 23, 2009H.J. Krebs16 Final Comments We have developed a detailed project schedule with performance measurement milestones to help us track progress and costs –Performance measurement milestones are based on Core Detector Disassembly Cost estimates include direct + indirect costs Cost estimates do NOT include: – Costs associated with disposal of materials Removed materials are assumed to be placed in controlled storage for future disposition –Costs associated with shipping materials off-site Configuration changes are not expected. However, such an occurrence will be settled thru concurrence of David MacFarlane, Bill Wisniewski, and Jim Krebs We are seeing a level of requirements (documentation, training, equipment certification, external review & oversight, etc.) on this project that we have not previously experienced. If this continues, or increases, it may challenge our contingency estimates and adversely affect our project schedule.