C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton.

Slides:



Advertisements
Similar presentations
IGCSE ICT Control Systems.
Advertisements

Application samples All rights reserved, property and © CAD Computer GmbH & Co. KG 2009.
Read Digital input Turn on sensor board Convert to Temperature & Humidity Wake Up CC430 Sleep CC430 Timing diagram ① P.2.4
1 iHome Automation System Home Automation System Team: Million Dollar Contingency Regiment Adam Doehling Chris Manning Ryan Patterson.
easyEmission - 1st Steps & Overview
Getting Started Product Description Setting Parameters How does it work Wiring Diagram.
The physical parts of Computer
The PHENIX/EMCal(PbSc)/BB/TOF Laser User Instructions Sean Stoll (rev. 12/8/03)
Daya Bay RPC Gas Safety System FDR, June 19, Daya Bay RPC Gas Safety System Design Changguo Lu, Kirk McDonald Princeton University (June 19/20,
PC Applications Course LabVIEW: Laboratory Virtual Instrument Engineering Workbench Graphical Programming Easy to use Faster Development Time.
C. Lu, K.T. McDonald RPC Gas System Final Design Review April 11, Daya Bay Reactor Antineutrino Experiment Resistive Plate Chamber Gas System Final.
Daya Bay RPC Gas System: Safety Subsystem Changguo Lu, Princeton University (Jan. 12, 2008)
E.H. #1 RPC Gas System Commissioning  “Leaky” modules’ study 1 Changguo Lu, Princeton University Qingmin Zhang, IHEP Shih-Kai Lin, University of Houston.
Computerized Train Control System by: Shawn Lord Christian Thompson Advisor: Dr. Schertz.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
1 April 7, 2009 C. Lu Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
The Perfect Shower Team – Clean Mikal Tirfe Sandra Wiese Negar Ehsan Tony Carosa Tim Plummer.
Chapter 2 Computer Imaging Systems. Content Computer Imaging Systems.
Team LIT Scott Butler Kristin Haeusler Michael Hatt Brock Smith.
Laboratory 5: Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report / Presentation Closing.
C. Lu, RPC System Installation Workshop, 6/11/2009, CUHK 1 1 RPC gas system installation (step by step plan) (CUHK, 6/11/2009) Changguo Lu, Kirk McDonald.
Coordinate Based Tracking System
Daya Bay RPC Gas System Installation at EH#1 Lu Changguo 1Daya Bay Muon SYstem Installation Workshop, Daya Bay, 10/18/2010 Our original gas system installation.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
C. Lu, K.T. McDonald RPC Gas System Final Design Review April 11, 2008 Daya Bay RPC gas system fire safety issue Slides from Gas System FDR + a few more.
C. Lu, RPC Gas Slow Control Workshop, 6/10/2009, CUHK 1 1 RPC gas system slow control (CUHK, 6/10/2009) Changguo Lu Princeton University.
The Tracker Dry Gas system was initially designed as a standalone unit meant to be operated through manual and pneumatically driven valves. The selection.
System Components Hardware overview for Apollo ACS.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
NetVuze Precision Network Meter standalone, easy to use, networked with data logging.
C. Lu, K.T. McDonald RPC Flammable Gas Monitor April 15, RPC Flammable Gas Monitor Based on Gas Chromatography Changguo Lu, Kirk T. McDonald Princeton.
2-3 note. 2 Peripheral Devices “Peripheral devices” are hardware plugged into ports or connected to a computer wirelessly. These devices can be for input,
An Overview of Using Computers
High Speed Data Converter University
Introduction to Robo Pro
Grob Systems, Inc., the customer, requires an industrial computer system that will have a function of acquiring raw data, processing the data, presenting.
Alex Apel Stephen Rashid Justin Robinson. Overview System Architecture PC Software Design Block Diagram GUI Design Digital Hardware Design Description.
Power Plant Construction and QA/QC Section 5.4 – Key Systems and Components Engineering Technology Division.
Forging new generations of engineers
Hardware vs Software Hardware: A physical part of the computer which you can touch. Software: A set of instructions which is run to perform tasks on your.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
EH#1 RPC Gas System Repair Report - Zhijian Zhang; Y. Lei; Qiang Xiao & Changguo Lu 11/5/2013.
Overview What is Arduino? What is it used for? How to get started Demonstration Questions are welcome at any time.
UNION COLLEGE WEATHER STATION Brian Kruppenbacker Jeffrey D’Alessandro Advisor: Professor Traver.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
Digital Cable Tuner[Model :TDMK-G5XXD] User’s Manual (TUA TDA10021H) May 2004 Evaluation kit TDMK-G5XXD.
Asttraining.com Scan Procedures for Ford EEC-V OBD II Systems.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
1 Daya Bay RPC Gas Safety System - Gas Cabinet Test Report Changguo Lu, Kirk McDonald Princeton University (October 11, 2009)
World Leaders in Combustion Management Solutions Remote Monitoring & Data Logging C.E.M.S I/O Modules DTI Autoflame Training,
FLASH Collaboration Meeting: July 2003 Spectrograph Status Etc.
I & C.
RPC Operation Jilei, Qingmin, Changguo, Ningzhe 2013/4/3.
Vanderbilt University Toshiba IR Test Apparatus Project Final Design Review Ahmad Nazri Fadzal Zamir Izam Nurfazlina Kamaruddin Wan Othman.
Control System for a four component Gas Mixing Unit Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata
Hall B Gas System Controls Physics Detector Support Group.
SCADA for Remote Industrial Plant
Haiwell PLC Modules Introduce
How SCADA Systems Work?.
fischertechnik® RoboPro Software for Gateway To Technology® RoboPro
Robert Gomez-Reino Garrido
August 23, 2000 R.N. Dubois Dow Chemical
WHAT IS WINDOWS MULTIPOINT SERVER 2012?
RF Local Protection System
Quality Control Infrastructure
Presentation transcript:

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 1 1 Some thoughts on RPC gas system slow control (Dongguan, 7/15/2008) Changguo Lu Princeton University

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 2 2 Overview Brief description of the Daya Bay Experiment RPC gas system; Signals exchanged between gas system and slow control system: Gas system running parameters; Warning sign; Emergency response; Main building blocks of the slow control screen (just for your reference); On-line operation instruction.

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 3 3 RPC Gas System The RPC gas system has five major components: 1.The gas storage bottles, including the bottle changeover system 2.The gas mixing and fire/detector safety monitoring system 3.The gas distribution system 4.The RPCs 5.The gas exhaust system, including the output bubbler system. 2. and 5. will interact with slow control system.

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 4 4 Location of the Gas System in the Daya Bay Near Hall (#1) Gas cylinders, ODH & HAD sensors Gas mixing system Host PC for the digital bubbler system Gas distribution /digital bubbler system crates (total 7) on RPC support frame. USB cable

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 5 5 Block Diagram of Gas Control and Fire Safety Systems

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 6 6 Logic Diagram of the System Status Crate Fire safety interlock function: If the Emergency Shutoff button is pushed, all four gases will be shut off simultaneously.

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 7 7 Logic Diagram of the Gas Flowmeter Crate The gas flowmeter crate displays the gas flow rate from seven mass flow meters: one for each of the four gases, one for each of the three water-vapor- control branches.

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 8 8 Logic Diagram of the Gas Pressure Crate The gas pressure crate displays the gas pressure at the upper stream of the flow controller for each gas.

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 9 9 Digital Bubbler Microprocessor ADC can reconstruct the bubble shape, the digital bubbler system can count the pulse rate and store the data file in a database.

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 10 Digital Bubbler – Graphics User Interface (Far Hall) 12 bubbler boards, 16 channels/each, display all sub-branches for the Far Hall gas system. Click on any one of the histograms will pop-up a larger histogram window. Bubbling channel Non-bubbling channel On the host PC, the following GUI will be displayed:

RPC Gas System Signals for the Slow Control System The RPC gas system will send signals to the slow control system for on-line monitor and emergency control. Gas flow rate for all four components, the total flow rate, and dry/wet branch flow rates for the gas mixture – Analog signal 0 – 10V and a warning signal on/off. Gas pressure upstream of the mass flow controllers - Analog signal 0 – 10V and a warning signal on/off. Gas mixture humidity – Analog signal 0 – 10V. Ventilation air flow rate – warning signal on/off. HAD sensors – warning signal on/off. Gas cylinder storage room/mixing room temperature/air pressure. (a stand-alone Weather Station device in the gas room). Gas cylinder weights – Warning signal from digital scales (analog signal also available). Emergency shutoff status. RPC HV interlock status, through slow control it should be able to control RPC HV on/standby/off. Gas bubbling rate for every sub-branch – Database file.

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 12 RPC Gas System Signals for the Slow Control System (cont’d)

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 13 What the main building blocks on the GUI may look like All meters and indicators on screen are passive but this Emergency Shutoff Block. If this red light is on, it means the hardware shutoff button has been pushed manually. If for some reason the shift taker needs to push this software button, a warning sign must appear to remind the user the consequence of this action, upon receipt of the confirmation the relevant hardware action takes place.

C. Lu, RPC Gas Slow Control Workshop, 7/15/2008, Dongguan, China 14 On-line operation instruction Gas system has many manual knobs and buttons can be touched, unexpected modification of the setting might cause a lot of confusing to the diagnostic in case of the system warning, it also can interrupt the entire experiment because the gas mix in the RPC system needs long time to be re-stabilized. When the warning sign shows up on the on-line monitoring screen it may cause some panic reaction, thus the on-line instruction to deal with the specific warning could be very helpful. We’ll provide these instructions later, so when slow control group design the system, please make such options available.