1 Effect of staging on module connection and support arrangement Yury Ivanyushenkov RAL.

Slides:



Advertisements
Similar presentations
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
Advertisements

Emittance definition and MICE staging U. Bravar Univ. of Oxford 1 Apr Topics: a) Figure of merit for MICE b) Performance of MICE stages.
MICE Top-Level Project Schedule Step IV Step V Step VI Revision date: 17 th June,
On MICE Coordinate System Yury Ivanyushenkov RAL.
1 26 Nov 2010 SOLID ABSORBERS Solid absorbers will provide first cooling demonstration –This is important for a number of reasons! Can use only solids.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
OPTICS UPDATE Ulisse Bravar University of Oxford 3 August 2004.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE Collaboration meeting at LBNL: 9 ~13 th Feb, 2005 Force reaction analysis Stephanie Yang Feb 10 th, 2005.
18 June 2004AFC meeting1 MICE  functions and so on Work in progress…. Observation by Ulisse Bravar at CERN meeting that beam not matched in baseline (Proposal.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Magnetic forces James Rochford Elwyn Baynham AFC working group meeting RAL 23 April 2004.
M.apollonioCM17 -CERN- (22/2 - 25/2 2007)1 Single Particle Amplitude M. Apollonio – University of Oxford.
MICE analysis meeting - (6/4/2006) 1 Update on MICE – step III M. Apollonio – University of Oxford.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 Quench Protection and the Power Supplies for the MICE Focusing and Coupling Magnets Michael A Green Lawrence Berkley Laboratory 10 February 2005.
1 OPTICS OF STAGE III Ulisse Bravar University of Oxford 6 October 2004.
1 Losses in the Cooling Channel Malcolm Ellis PID Meeting 1 st March 2005.
MICE CM - Fermilab, Chicago - (11/06/2006) 1 A (short) history of MICE – step III M. Apollonio – University of Oxford.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
1. Optical matching in MICE Ulisse Bravar University of Oxford 2 June 2004 Constraints Software MICE proposal mismatch MICE Note 49 (September 2004, Bob.
24 Nov 2009PC Analysis PC Schedule 2009 Tuesdays fortnightly Proposed dates: 13 October  27 October  CM25 4 – 6 November  24 November 8 December.
30 June 2004MICE VC1 MICE  functions Since last VC report: –New Mike Green configurations for decreased spacing between focus and matching coils of 400mm,
MICE Project Board Alain Blondel 1 MICE running Preamble ISIS running Step I Step(s) IV Step V (and VI)
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
M.apollonioam M. Apollonio University of Oxford update on STEP III.
CMPB Alain Blondel 14 April STATUS OF MICE.
04/01/2006MICE Analysis Meeting1 MICE phase III M. Apollonio, J. Cobb (Univ. of Oxford)
MICE AFC Group phone conference on 27 January 2005 AFC module progress By Wing Lau, Oxford.
1 Emittance Exchange in MICE ● How would one measure emittance exchange? ● Build a cell of a cooling ring? ● Expensive ● Manpower-consuming ● Nice to demonstrate.
M.apollonio/j.cobbMICE UK meeting- RAL - (9/1/2007) 1 Single Particle Amplitude M. Apollonio – University of Oxford.
1 STEP III MICE Analysis Workshop RAL – 4/9/2008 m. apollonio, IC.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
MICE magnetic measurements: AFC considerations Alain Blondel see a previous discussion for reference in CM35 (Feb 2013 slides by V. Blackmore, A. Blondel.
1 Forces Yury Ivanyushenkov RAL. 2 Goal: find maximal (static and dynamical) possible forces in MICE magnetic system. Method: calculation of axial magnetic.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
1 Search for Worst-Case Forces MICE Video Conference, September 8, 2004 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department,
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Re-tuning MICE June 1 st 2010 Tim Carlisle. Intro At the moment MICE coil currents optimized for: central Pz = 0 RF No LH2 want to rematch M1 & M2 in.
Nufact02, London, July 1-6, 2002K.Hanke Muon Phase Rotation and Cooling: Simulation Work at CERN new 88 MHz front-end update on cooling experiment simulations.
1 OPTICS OF MICE STEP V.0 Ulisse Bravar University of New Hampshire 26 June 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
(one of the) Request from MPB
CM Nov 2009 DOES MICE NEED STEP III ? Somewhat hard to understand MICE Schedule… –If the gods are (un)kind it’s possible that SS1, SS2 & FC1 are.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Impact of Magnet Performance on the Physics Program of MICE
Controls & Monitoring in MICE
Presentation transcript:

1 Effect of staging on module connection and support arrangement Yury Ivanyushenkov RAL

2 Beam Tracker module #1 AFC module #1 RF module #1 AFC module #2 AFC module #3 RF module #2 Tracker module #2 MICE Cooling Channel

3

4

5  - STEP I: spring 2006 STEP II: summer 2006 STEP III: winter 2007 STEP IV: spring 2007 STEP V: fall 2007 STEP VI: 2008 MICE Stages by Alain Blondel

6  - STEP I STEP II STEP II.V Insert absorber (solid) between the two halves and measure Pt & E distribution and emittance growth STEP II.VI Split tracker in two parts and measure against each other (systematics) Establish beam match andwether we have all knobsnecessary to drawEmittance vs transmissioncurve. Measure emittance These are mostly questions for beam design and matching to and within solenoid. MICE Additional Stages by Alain

7 STEP V STEP V.0 Shorter, less expensive, no coupling coil, (very limited optics flexibility) does this work in flip, RFoFo, non flip modes? These are mostly optics questions MICE Additional Stages by Alain

8 Module–to–Module Interface Matrix Tracker #1 AFC #1RF #1AFC #2RF #2AFC #3Tracker #2 Stage 1 Stage 2yes Stage 2.5yes Stage 2.6yes Stage 3yes Stage 4yes Stage 5.0yes Stage 5yes Stage 6yes Notation: means interface

9 Module–to–Module Interface Requirements Tracker #1 interfaces with : AFC #1 OR Tracker #2 AFC #1 interfaces with : Tracker #1 AND Tracker #2 OR Tracker #1 AND RF #2 RF #1 interfaces with : AFC #1 AND AFC #2 AFC #2 interfaces with : RF #1 AND Tracker #2 OR RF #1 AND RF #2 RF #2 interfaces with : AFC #1 AND AFC #3 AFC #3 interfaces with : RF #2 AND Tracker #2 Tracker #2 interfaces with : Tracker #1 OR AFC #1 OR AFC #2 OR AFC #3

10 AFC Module Interface Requirements AFC #1Tracker #2 AFC #1 RF #1Tracker #1 AFC #1: AFC #2 Tracker #2 RF #1 AFC #2 RF #2RF #1 AFC #2: AFC #3 Tracker #2 RF #2AFC #3: Stage 4 Stages 5 and 6 Stage 5 Stage 6 Gate valve Gate valve Gate valve Tracker #1 Gate valve Gate valve

11 “Universal” AFC Module Tracker #1 Universal AFC module Tracker #2 RF #1 or RF #2 Gate valve Gate valve

12 Maximal Forces on Modules in Stage 6 ModuleMax force, MN Case Central focus pair module0All Coupling coil module from centre; towards centre Flip mode, Case 2 Non-Flip mode, Case 2 Edge focus pair module from centre; towards centre Flip mode, Case 3 Non-Flip mode, Case 2 Tracker solenoid module towards centre Non-Flip mode, Case 2

13 “Universal” AFC Module : Forces in Stage 6 Universal AFC module Beam Cooling channel centre MN (in Flip mode, Case 3) MN (in Non-Flip mode, Case 2)

14 Next steps Q: Do we want a “universal” AFC module ?