PRELIMINARY DESIGN REVIEW P09321 – AUTOMATED MEDICINE DISPENSER Date 01-16-2009 Time 11-12:30 Room 78-2230 ‏ Michael Boquard (CE) ‏ Felix Feliz (ME) ‏

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

P09321 D ETAILED D ESIGN R EVIEW M ECHANICAL S YSTEMS Felix Feliz Matthew Jones Michael Boquard Rebecca Jaiven Justin Zagorski Shuaib Mansoori 1.
Justin Akerman (CE) Chris Hoerbelt (ME) Hersh Anand (EE) Anthony Poli (ME) Greg Mucks (ME) Jon Notaro (EE) Eric Tripp (EE) Customer: Stan Rickel.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
P11213: Modular Student Attachment to the Land Vehicle for Education Jared Wolff, Andrew Komendat, Oyetunde Jolaoye, Dylan Rider.
P09321 A UTOMATED M EDICINE D ISPENSER Justin Zagorski (IE) – Project Lead Rebecca Jaiven (EE) – Lead Engineer Michael Boquard (CE) Matthew Jones (ME)
P11310: Parabolic Dish Autopoint Solution Project Family Team Leader: Trae Rogers (ME) Project Engineer: Pat Ryan (EE) Kyle Norlin (ME) Chris Reed (CE)
MSD-I Project Review Modular Motion Tracking Sensors 1.
Multidisciplinary Engineering Senior Design Project 6508 Controls Lab Interface Improvement Preliminary Design Review 11/11/05 Team Members: Michael Abbott,
Team Name Conceptual Design Review University/Institution Team Members Date.
P09321 DETAILED DESIGN REVIEW ELECTRICAL/SOFTWARE/ FIRMWARE SYSTEMS Felix Feliz Matthew Jones Michael Boquard Rebecca Jaiven Justin Zagorski Shuaib Mansoori.
P09004 Eye Tracking. Engineering Analysis Reviewing manuals for Single Board Computer Looking at various mounting methods for cameras Preliminary.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
Automatic Home Medication Dispenser Project # P07009 Team Guide - Dr. Daniel Phillips Project Sponsor - Dr. Michel Berg Team Members Alan StrandburgChris.
R I T Team Members: Nandini Vemuri → Team Lead, System Testing, Motor Expert Jason Jack → GUI Design, Microcontroller Expert, Website Administrator John.
P08456: LED Light for an Underwater ROV Jeremy Schiele- ME, Project Manager Jonathan Lent- ME, Housing Design Justin VanSlyke- ME, Mounting Design & Testing.
P /20093 Composites Autoclave Brandon Allen (EE) Matt Brady (ME) Brian Cario (ME) Matt DiFrancesco (ME) John Mink (EE) ‏ Chris DeMinco.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 3:30Introductions 3:35Project Description 3:45Customer Needs 4:00Risk.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
SD Dec Team Members Client / Advisor Acknowledgements Victor Villagomez Cpr E Joe Grady E E Dr. Gary Tuttle Leland Harker Prakalp Sudhakar E E James.
Automated Feeding Solutions for Dog Owners Preliminary Design Review October 19, 2007 Project Automated Dog Feeder Project Advisor Dr. Hongwei Wu The Canine.
MSD P07302Design Review1 Motor Controller Subsystem MSD P07302 Project Sponsor: KGCOE Project Members: D. ShenoyProject Manager S. TallauSoftware Design.
Team Members: Nahiyan Ali Shrabantee Chatterjee Vaibhav Kumar Alex Weigel Tao Zeng Advisor: Dr. Mani Mina Client: Senior Design Dr. Gregory Smith.
P09321 A UTOMATED M EDICINE D ISPENSER Justin Zagorski (IE) – Project Lead Rebecca Jaiven (EE) – Lead Engineer Michael Boquard (CE) Matthew Jones (ME)
Learning with a Purpose: Learning Management Systems Patti Holub, Director District Initiatives and Special Projects Miguel Guhlin, Director Instructional.
MD-EXPERT Designed with doctors for doctors. One solution for multiple platforms
Solution Overview for NIPDEC- CDAP July 15, 2005.
MD-EXPERT Medical Practice Management System. Product Overview Primary markets Family Practice Internal medicine General Practitioner Small to mid-size.
File-Mate 1500 Design Review 1 November 19, 2013 KEVEN ABBOTT, ARCHITECT TYLER CROUSE, SPONSOR LIASON KIANA DELVENTHAL, TEAM LEADER, RECORDER LIAM WESTBY,
The Future of gps technology
PRELIMINARY DESIGN REVIEW P09321 – AUTOMATED MEDICINE DISPENSER DATE ( ) ‏ Michael Boquard (CE) ‏ Felix Feliz (ME) ‏ Rebecca Jaiven (EE) (Lead.
Assignment 2 Project: Sea Urchin Sporting Goods Team Members: Gwn Hannay, Debbie Carlton, Susan Dalgleish Daniel Barnes, David Cooper.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Robotic Sensor Network: Wireless Sensor Platform for Autonomous Topology Formation Project: Sponsored By: Advisor: Dr. S. Jay Yang, CEManager: Steven.
ECE 4901 Computer and Electrical Engineering Design I John Chandy
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
Hospital Pharmacy. 2 Introduction Hospital pharmacy: most challenging area to work Some pharmacies open 24 hours a day, 7 days a week Technicians: flexibility.
Microsoft Management Seminar Series SMS 2003 Change Management.
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
P07108: METEOR Instrumentation Recovery System. Team Bash Nanayakkara – Project Manager (ISE) Scott Defisher – Fuselage Design (ME) Mike Kochanski – Software.
Proposal for an Open Source Flash Failure Analysis Platform (FLAP) By Michael Tomer, Cory Shirts, SzeHsiang Harper, Jake Johns
Project Final Presentation Joe Featherall.
ECpE Student Database Team 21 Adviser: Tien Nguyen ECpE and Tony Moore.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
EDGE™ Final Project Plan Presentation P08043 – Mass Spectrometry Sample Preparation.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
The MedDispenser Improving Medication Compliance for the Elderly Group: Ashley Hammann Darnita Mims Connie Saelzler Annie Suarez Advisor: Richard Fries,
Timothy Kritzler and Joseph Mintun Sponsor: Martin Engineering, Illinois Advisors: Dr. Malinowski and Dr. Ahn Bradley University Electrical and Computer.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Project Planning: Scope and the Work Breakdown Structure
P07307: Controls for Dynamic Suspension
P07203 Dynamometry Laboratory Infrastructure
MOOG EMA Installation MSD1 - P12251
HEMODYNAMIC SIMULATOR II P09026
Software Development Process
Automated Medication Dispenser
Heart Pump and the Circulatory System P17080
P07122: Autonomous Quadcopter
Health Make-a-thon Proposal: Programmable Pillbox
Presentation transcript:

PRELIMINARY DESIGN REVIEW P09321 – AUTOMATED MEDICINE DISPENSER Date Time 11-12:30 Room ‏ Michael Boquard (CE) ‏ Felix Feliz (ME) ‏ Rebecca Jaiven (EE) (Lead Engineer) ‏ Matthew Jones (ME) ‏ Shuaib Mansoori (EE) ‏ Justin Zagorski (IE) (Team Leader) ‏ 1

OVERVIEW 1. Intro 1. Project Description 2. Roles and Responsibilities 2. Customer Requirements & Engineering Specifications 3. Summary of Concept Selection 4. Electrical System Summary 5. Software System Summary 6. Preliminary System Integration 7. Risks & Issues 8. Schedule 2

INTRO – PROJECT DESCRIPTION o Produce a robust prototype that dispenses medication on a time-based schedule to patients in a secure and accountable environment. o Allow to dispense a week’s supply of up to 6 different pills for two patients accessed twice daily. o Reliable and compact electro-mechanical dispensing system that can be controlled by a common laptop. 3

INTRO – PROJECT DESCRIPTION 4 User inputs finger print information Laptop communicates information to the dispenser Dispenser produces medicine

INTRO - SCOPE Start with a working prototype. ~5 years outdated Modify to meet customer needs and specifications. Deliver functioning prototype by end of MSDII. 5

INTRO – Target End User One who takes medication on a regular basis, is technologically capable*, and desires to have their medication in a safe and secure environment. * a technology capable person is familiar with basic computer functions and/or has the willingness to learn. 6

ROLES & RESPONSIBILITIES Justin Zagorski (IE) Team Leader Rebecca Jaiven (EE) Lead Engineer Michael Boquard (CE) ‏ Felix Feliz (ME) ‏ Matthew Jones (ME) ‏ Shuiab Mansoori (EE) D. Phillips (EE) ‏ E. Hanzlik (ME) ‏ John Veenstra GUI & Interfacing Design & Manufacturing Electrical Components & Circuitry Faculty Guide Faculty Advisor Sponsor 7

OVERVIEW 1. Intro 1. Project Description 2. Roles and Responsibilities 2. Customer Requirements & Engineering Specifications 3. Summary of Concept Selection 4. Electrical System Summary 5. Software System Summary 6. Preliminary System Integration 7. Risks & Issues 8. Schedule 8

Critical Customer Needs and Engineering Specifications Customer Needs 1. Laptop Interface ° Security™ a. Ensure accountability for delivery and distribution of medication. 3. Properly and Reliably Dispense Medication a. Dispenses medication for two people, twice a day for a week, for six different medications each distribution. 4. Portable Engineering Specs 1. Biometric Access a. CN of security/laptop 2. Software properly access appropriate location and no mechanical failures a. CN properly and reliably dispenses medicine 3. Different levels of user access a. CN security 4. Size/weight limits a. CN portability 9 Appendix B: House of Quality

Pareto Chart - Specifications 10

OVERVIEW 1. Intro 1. Project Description 2. Roles and Responsibilities 2. Customer Requirements & Engineering Specifications 3. Summary of Concept Selection 4. Electrical System Summary 5. Software System Summary 6. Preliminary System Integration 7. Risks & Issues 8. Schedule 11

Top 3 Designs 12 Datum123 Size Security Scalability Simplicity Reliability Ease of Use Return Area Packaging 0 01 + -  0678 Scale: 0 is neutral 1 is positive -1 is negative Appendix C: Full PUGH Chart

Selected Design – Concept Empty Return Collapsible Legs Hinges Collapsible Ramp FeaturesSpecification met Collapsible LegsMobility Collapsible RampMobility Return SlotPassive Security Sheet aluminum body Light weight Small FootprintMobility 13

Selected Design - Modeling 14 Unfolded Collapsed *Collapsed dimensions: 11”x11”x6” Front views Rear views Unfolded Collapsed *Collapsed dimensions: 11”x11”x6” Front views Rear views

OVERVIEW 1. Intro 1. Project Description 2. Roles and Responsibilities 2. Customer Requirements & Engineering Specifications 3. Summary of Concept Selection 4. Electrical System Summary 5. Software System Summary 6. Preliminary System Integration 7. Risks & Issues 8. Schedule 15

Existing Electrical System Schematic in Appendix B 16 Appendix D: Schematics

Proposed Electrical System 17

System Level Changes - Electrical 18 ExistingChangeReason 3.3V RegulatorRemove Not necessary to power components Mux/ DemuxRemoveReplace with FPGA System ROMUpdateOld Technology Non-standard connectorChangeTo USB 2.0 for standardization Memory Card ConnectorRemoveReplace with Laptop MicrocontrollerRemoveReplace with Laptop FPGAUpdateOld Technology

OVERVIEW 1. Intro 1. Project Description 2. Roles and Responsibilities 2. Customer Requirements & Engineering Specifications 3. Summary of Concept Selection 4. Electrical System Summary 5. Software System Summary 6. Preliminary System Integration 7. Risks & Issues 8. Schedule 19

Firmware Data Flow 20

Firmware Data Flow 21

Firmware Finite State Machine (FSM) 22

Levels of User Access 23 o User 1 – Patient o User 2 – Refiller o User 3 – Delivery o User 4 – Administration The prescription is changed by the Doctor who informs that pharmacist who changes the pills placed into the cartridge.

User 1

User 2 Appendix G: Detailed Refill Process

User 3 Delivery

User 4

OVERVIEW 1. Intro 1. Project Description 2. Roles and Responsibilities 2. Customer Requirements & Engineering Specifications 3. Summary of Concept Selection 4. Electrical System Summary 5. Software System Summary 6. Preliminary System Integration 7. Risks & Issues 8. Schedule 28

Preliminary System Integration o Electrical-Software Software controls TTL signal that sends signal high o Mechanical- Electrical Electrical will mount on prototype on designated space Electrical will power Nitinol drivers 29

Preliminary System Integration 30

OVERVIEW 1. Intro 1. Project Description 2. Roles and Responsibilities 2. Customer Requirements & Engineering Specifications 3. Summary of Concept Selection 4. Electrical System Summary 5. Software System Summary 6. Preliminary System Integration 7. Risks & Issues 8. Schedule 31

RISKS 5 – Life Threatening 4 - Nonfunctional Prototype 3 – Fixable Glitch 2- Outside of Design Control 1 – Not critical to functionality RiskLevelHow to Mitigate False positive/negative on biometric scanner5Use best possible scanner within budget Incorrect medication fill5Individual held accountable - datalogging, pick list Dispensing from incorrect location5Double-check programming, circuitry Hardware compatibility (USB drivers)4Test on multiple computers, make sure drivers are up to date Unauthorized access4Fingerprint access, any access is logged Power Outage4 Advise customer to supply UPS Dropping / Impact3Ensure case design is robust Biometric scanner malfunction3Users will have a backup PIN OS compatibility3Test on multiple computers, include necessary software Firmware patches3Ensure updates can be made easily using OS Incomplete or Incorrect Documentation3Evaluate and organize Mechanical Jam3Careful selection of hinges/validation testing User forgets to take medication2Alarm/indicator on unit Pill breakage2Pad cartridge caps Return slot full2Properly sized return area Water damage1Alert users with warning label Excessive Weight1Re-evaluate Concept Selection 32

ISSUES (Most important to least) ‏ 1. Time 2. Scope Creep 3. Availability of machine shop/electrical components/Nitinol fibers & latches 4. OS updates 5. Team schedules conflicting 6. Available computers/people for testing 7. Ramp packaging space (hinge thickness) ‏ 8. Cartridge loaded and delivered in different time zones 33

OVERVIEW 1. Intro 1. Project Description 2. Roles and Responsibilities 2. Customer Requirements & Engineering Specifications 3. Summary of Concept Selection 4. Electrical System Summary 5. Software System Summary 6. Preliminary System Integration 7. Risks & Issues 8. Schedule 34

MSDI Timeline 35 Appendix H: MS Project Links

MSDII Timeline 36

BACK UP SLIDES (Appendix, extra info, etc..) 37

Appendix Appendix A – One Page Project Summary Appendix B – House of Quality Appendix C – PUGH Chart Appendix D – Schematics 38

Appendix Appendix E – FEA Ansys Analysis Appendix F – Material Selection Matrix Appendix G – Refill Process Detailed Appendix H – MS Project Link 39