M. Bonesini 10-02-06 DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)

Slides:



Advertisements
Similar presentations
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Advertisements

MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Mice VC Nov 2005Jean-Sébastien GraulichSlide 1 The ADC Problem in MICE o Reminder: Spill, Readout and Digitization o Acquisition Rate vs dead time o Conventional.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 DDAQ Hardware Architecture o General Architecture o Tracker Baseline o TOF Baseline & Options o EmCal Baseline.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - 3/10/061 M. Bonesini INFN Milano Some results from BTF testbeam on TOF.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
MICE Pid & trigger detectors MICE CM15, FNAL Jun 11, 2006 V. Palladino, Univ & INFN Napoli for the small PID team Bonesini, Chimenti, Cremaldi, Graulich,
VME readout fro TOF MICE Tracker Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
M. Bonesini - 08/06/06 Fermilab1 M. Bonesini INFN Milano MICE TOFes construction & planning.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
M. Bonesini - MICE Collaboration Meeting 9/10/061 M. Bonesini INFN Milano TOF status (mainly TOF0/1)
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Report on FEE for PID o Reminder o TOF o EMCAL o Summary Jean-Sebastien Graulich, Geneva.
TOF Front End electronics
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
M. Bonesini - MICE CM CERN 24/2/071 M. Bonesini INFN Milano Updates on TOF project.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
Mott DAQ Speed December 18, How to speedup DAQ I.Reject low-energy electrons before reaching DAQ: 1.Increase E-detector hardware threshold 2.Vetoing.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
B.Satyanarayana. B.Satyanarayana INO Weekly meeting June 8, Rise time: 2 to 3ns Pulse height: mV.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
Testing of Latch-TDC Da-Shung Su Jia-Ye Chen, Hsi-Hung Yao, Su-Yin Wang, Ting-Hua Chang, Wen-Chen Chang 2011/07/13.
1 New TOT design for the LAV F.E. electronics M. Raggi, P. Valente G. Corradi, D. Tagnani LNF electronic service TDAQ Working Group 29/05/2009.
M. Bonesini - 22/10/05 RAL1 M. Bonesini INFN Milano MICE TOF stations construction & planning.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
M. Bonesini - MICE PID review 12/10/061 M. Bonesini INFN Milano TOF upstream PID review (TOF0/1)
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
Proposal of a digital-analog RPC front-end for synchronous density particle measure for DHCAL application R.Cardarelli and R.Santonico INFN and University.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
Page Detector and Electronics R&D for picosecond resolution, single photon detection and imaging J.S. MilnesPhotek Ltd T.M. ConneelyUniversity.
 13 Readout Electronics A First Look 28-Jan-2004.
Organization for Micro-Electronics desiGn and Applications HGCAL Front-End Electronics Christophe de LA TAILLE, Marcello MANNELLI sept 2015.
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Progress of GEM R&D in Lanzhou Univerity
Front-end Electronic for a neutrino telescope : a new ASIC SCOTT
Beam detectors performance during the Au+Au runs in HADES
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Jean-Sebastien Graulich, Geneva
Alternative FEE electronics for FIT.
Update of time measurement results with the USB WaveCatcher board & Electronics for the DIRC-like TOF prototype at SLAC D.Breton , L.Burmistov,
Hellenic Open University
A First Look J. Pilcher 12-Mar-2004
Conceptual design of TOF and beam test results
Particle ID Diagnostics in the MICE Beamline
for BESIII MDC electronics Huayi Sheng
Presentation transcript:

M. Bonesini DAQ Meeting1 M. Bonesini INFN Milano Some Considerations for MICE TOF Stations FE electronics (mainly TOF0)

M. Bonesini DAQ Meeting2 Outline  rate considerations mainly for TOF0  readout electronics 1. Cables 2. Discriminators 3. FE schemes: TDC only or TDC+QADC  BTF testbeam plans  Conclusions

M. Bonesini DAQ Meeting3 Rates (Singles per ms) target insertion reduced to get 600 good mu+/sec (AUG05) LAHETGeant4MARSAverage TOF TOF Tracker Tracker TOF Good μ + (Ev/sec)

M. Bonesini DAQ Meeting4 TOF0 AUG05 beamline:news from 21/10/05 from T. Roberts 6pi beam

M. Bonesini DAQ Meeting5 1pi beamline design from D. Adams

M. Bonesini DAQ Meeting6 What does it means for a single TOF channel ? From D. Adams & T. Roberts we can expect a rate ~.5 MHz/ch at TOF0, ~.25 MHz/ch at TOF1, ~.2 MHz at TOF2 PMTs must sustain high rate, eg high average anode current. Fine for TOF0 with R active divider FE + DAQ must cope with rate: ie conversion time ~1-2  s, ~1000 events buffering

M. Bonesini DAQ Meeting7 Cables/Splitters output PMT signal on RG213 cables with BNC connectors (~50 cm RG274 cable from PMT, patch panel, RG213 ~35 m long) 1. RG213 differential variation with temperature 30 ppm/C as measured in HARP (3 times less than conventional RG58 cables) 2. Available cables 40 m long: problem if we need much shorter ones (we have to cut/reconnectorize them) or longer ones (extra cost ~10KE) Depending on discriminator choice (CF vs L.E. or ALICE integrator solution) splitter can be needed active splitter (recuperated from Harp: ~100 ch) maybe a choice splitter L.E. discrim TDC QDC PMT signal

M. Bonesini DAQ Meeting8 Discriminator choice Choice between: 1. CF discrimininator : no need of time-walk correction no QDC line/splitter needed, but  t is usually worse 2. L.E. discriminator:  t is usually better, but a QDC is needed 3. ALICE NINO chip: it includes a discriminator + an integrator to make possible TOT correction (slightly equivalent to p.h. correction). According to ALICE coll. solution 3 is equivalent to 2 Problem: while solutions 1-2 are commercial ones (CAEN or …); solution 3 needs some R&D

M. Bonesini DAQ Meeting9 ALICE NINO Chip (info from JS ) Measure the Charge with Time Over Threshold Principle Advantage: Easy Cabling and Charge Measurement (not linear though) Good Precision for Time Walk Correction NINO = ASIC developed by CERN/MIC for Alice TOF Discriminator with ToT “proportional” to the Charge (at low amplitude): provides 50 ps resolution (IEE TNS Vol 51-5 (2004) ) Drawback : Requires Board development ! Cost: board production + development ~ 20 K PMTNINO TDC Trigger Logic Width ~Charge Rising edge + Trailing edge Time Measurement

M. Bonesini DAQ Meeting10 TDC choice Standard CAEN V775 TDC (HARP like) are not viable due to long conversion time (2.x  s) and small memory buffer (32 evts) We plan to use CAEN V1290 multi-hit TDC: continuos operating mode, leading/trailing edge operations, 1000 evts buffer memory Problems: V1290 is not an easy object to handle. 1 module just delivered in Milano, we plan to use it at BTF and compare performances with V792+V775

M. Bonesini DAQ Meeting11 The BTF testbeam Testbeam 10+2 days requested for beginning of June We will try to have our DAQ based on CAEN V2718 (not use default BTF one, Labview based) We can test TOF resolutions, not rate effects Energy range MeV e - /e + Max rep rate50 Hz Pulse duration 10 ns Current/pulse particles

M. Bonesini DAQ Meeting12 What we plan to test in BTF, as regards TOF FEE reference solution (HARP-like): Harp splitter+V775 TDC + V792 QADC + L.E. discriminator MICE baseline-1 solution: V1290 TDC + CF discriminator (Mb-1) MICE baseline-2 solution: Harp splitter + V1290 TDC + QADC + L.E. discriminator. For the time being QADC will be V792, waiting for new CAEN QADC based on V1724, to be delivered end of this year (Mb-2) If available: V1290 TDC + ALICE NINO chip (discriminator+integrator)

M. Bonesini DAQ Meeting13 Some considerations for TOFFE MICE baseline-1 solution is easy and if works minimize manpower (our more delicate issue) we can try to adopt Mb-1 to proceed later to Mb-2 (still reduce manpower) ALICE NINO solution requires real work: I will suggest to consider it only if Mb-1 or Mb- 2 will not work Real delicate point: choice of CF discriminator

M. Bonesini DAQ Meeting14 What are the discriminators on the market? L.E. discriminators CF discriminator Not many: in my mind some models from CAEN + CF8000 from Ortec

M. Bonesini DAQ Meeting15 Conclusions up to now we are in schedule but manpower is very thin and we have to avoid non-commercial solutions, if possible BTF testbeam will be asses many points