Project Manager: Stewart WadsworthFaculty Guide: Dr. SahinProject Number: P09207 Ground Scouts Robotics P09207 Week 3 Update Final Specifications Functional.

Slides:



Advertisements
Similar presentations
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Advertisements

Autonomous Sensor and Control Platform Rover Tae Lee Josh Reitsema Scott Zhong Mike Chao Mark Winter.
P10029: Control Enhancements for Air Muscle Biomimetic Hand Customer: Dr. Lamkin-Kennard Faculty Guide: Ed Hanzlik Team Members: Zach Wessner, Jaci Tylkowski,
P10029: Control Enhancements for Air Muscle Biomimetic Hand October 16, 2009 Customer: Dr. Lamkin-Kennard Faculty Guide: Ed Hanzlik Zach Wessner, Jaci.
Project Manager: Stewart WadsworthFaculty Guide: Dr. SahinProject Number: P09207 Ground Scouts Robotics P09207 Week 4 Update Concept Selection System Level.
Nandini Vemuri (EE) Jason Jack (CE) Ryan Schmitt (CE) Jeff Howe (EE) John Corleto (CE) Emily Phillips (EE) Power Distribution Subsystem Wireless Communication.
October 21, 2003 ECE Senior Design1 Autonomous GPS-BOT Preliminary Design Review by Kery Hardwick, Yevgeniy Khasanov, Naoya Kinuta, Zhe Chuan Luo.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Project Manager: Stewart WadsworthFaculty Guide: Dr. SahinProject Number: P09207 Customer Need # ImportanceDescriptionComments/Status CN11Easy to assemble.
Post-Competition Thoughts F. Chang, J. Schrier, D. Lee.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Cycle Sim A bicycle ride using OpenGL and an exercise bike. John Aschenbrenner Phil Thorpe.
P11016: Intra-building Navigation Shannon Carswell Dan Paris Tim Garvin Dan Stanley.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Field Navigational GPS Robot Final Presentation & Review Chris Foley, Kris Horn, Richard Neil Pittman, Michael Willis.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 3, 2008.
P08211 – 5-minute Commercial DPM Student - Shadle Stewart Final Period - 11/12/07.
FSAE Telemetry Team WiTel: Alex Pfarr, Emily Peterman, Lonny Cooper & Clint Young seniordesign.engr.uidaho.edu/2005_2006/witel/index.html.
How to Design a Robot. General Design Considerations Effectiveness – Does the robot do what you want it to? – Speed & accuracy Reliability –How often.
Ground Scouts P09207 Project Manager: Stewart Wadsworth Faculty Guide: Dr. Sahin Starting: Ending:
P10216: Robot Navigation and Plant Platform Mission Statement and Background The Wandering Campus Ambassador project involves developing a robotic system.
Nandini Vemuri (EE) Jason Jack (CE) Ryan Schmitt (CE) Jeff Howe (EE) John Corleto (CE) Emily Phillips (EE) Power Distribution Subsystem Wireless Communication.
Tracking Rover Team Rubber Ducky Joshua Rubin Alexander Starick Ryan Ramos Alexander Chi.
Ground Scouts P09207 Team: Stewart Wadsworth (ME) Alex Sojda (EE) Josh Watts (CS) Matt DiMicco (EE) Tae Cooke (EE) Faculty Guide: Dr. Sahin (EE) Primary.
Table Dancer Final Design Presentation 10/20/04 Team Members: Ryan Gray Dale Williams Emeric Rochford Dan Beard.
Remote Surveillance Vehicle Design Review By: Bill Burgdorf Tom Fisher Eleni Binopolus-Rumayor.
SYSC 4907 Engineering Project.  Group Members Peter Fyon CSE John Koh CSE Andrew Kusz CSE  Group Supervisors Dr. Victor Aitken.
Preparations for GPS/INS Flight Testing on a High-Dynamic Vehicle Presenter: Curtis Cutright Advisor: Dr. Michael S. Braasch.
1 1 The Laddermill - Design, Building & Testing Bas Lansdorp Richard Ruiterkamp Background Kite control mechanism Groundstation Electronics Testing.
Michael McGrath IMDL Professors: Dr. A. Antonio Arroyo Dr. Eric M. Schwartz TA’s: Josh Weaver Tim Martin.
P14215 AUTONOMOUS WANDERING AMBASSADOR What is the project about? The objective of this project is to modify a currently remote controlled robot so that.
Dr. Jennifer Rochlis. Overview Build a technology testbed for future rover concepts Develop and demonstrate operations and mission concepts.
Humanoid Robot Head May Team Members: Client/Faculty Advisor: Dan Potratz (CprE) Tim Meer (EE) Dr. Alex Stoytchev Cody Genkinger (CprE) Jason Pollard.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
MINOS ’03 Dr John Pote. The Team Dr Tony Wilcox Embedded Systems ROBOtic Inventor Dr Nick Holden Control Expert This guy likes lots of.
Tim Southerton Brian Grosso Matthew Morris Lalit Tanwar Kevin Meehan Alex Reid Advisor: Dr. Becker-Gomez 1RC Camera Car SDR.
Design of Automatic Guided Vehicles. Automatic Guided Vehicle Industrial material transportation Unmanned transportation vehicle Optical,wired or laser.
Engaging Undergraduate Students with Robotic Design Projects James O. Hamblen School of ECE, Georgia Tech, Atlanta, GA
The Micro-CART project teaches students how to familiarize themselves with a project that they were not part of from conception to completion. Students.
Navi Rutgers University 2012 Design Presentation
Michael McGrath IMDL Professors: Dr. A. Antonio Arroyo Dr. Eric M. Schwartz TA’s: Josh Weaver Tim Martin.
Professors: A. Antonio Arroyo Eric M. Schwartz TAs: Josh Weaver Tim Martin 9/18/2012.
Robotic Sensor Network: Wireless Sensor Platform for Autonomous Topology Formation Project: Sponsored By: Advisor: Dr. S. Jay Yang, CEManager: Steven.
1 Robotics Challenge Overview. 2 Why? -Viking was tested at the Dunes -Develop intelligent robots -Explore Robotics.
Phong Le (EE) Josh Haley (CPE) Brandon Reeves (EE) Jerard Jose (EE)
A remote control robot with webcam. Responsibilities User Interface Communicate with server Webcam Display Server Web Server Collaborators Work: Harkins.
Abstract Combines are used in fields to perform the complex operations necessary to effectively harvest crops. The swath width detection system would assist.
Team 14: The Design and Construction of an Ackerman-Steered Robot Members: Kyle Quinn Julio Sosa Robert Steel Trevor Woods.
A.M.E.N. Autonomous Meteorological Embedded Network for Fire Fighting Fan Zhang, Dmitry Stomakhin, Flavio Sira, Brian Hansen.
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
Doppler Navigation & Aiding for Maritime Robots Presented by: Omer Poroy Presented at: The Maritime Business & Technology Summit, November 30, 2011 Panel.
ECE477 Project Minotaur Software Narrative Jon Roose.
Wireless Assistive Control Device Upper Extremity Motion Capture Sensor Melissa Gilbert Alan Smith Jonathan Guerrette Dan Chapman Pooja Nanda Adey Gebregiorgis.
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 19, 2011 Extensible robot framework that demonstrates the concept of automating.
Scrumm meeting. Mechanical Done. Worked on final type What to do? Finish the assembly of the bottom part.
Electrical and Computer Engineering Smart Goggles To Chong Ryan Offir Matt Ferrante James Kestyn Advisor: Dr. Tilman Wolf Team Wolf.
Team America Team 8 Ben Klein, Mike Sharkness, Bobby Jevin, Jon Takosky.
Hardware and Locomotion
Aim Of The Project To implement the obstacle avoidance and Zigbee control functions for Omni directional mobile robot.
P15051: Robotic Eye System Design Review
Power Steering Test Stand
CSU Robot Challenge 2010 Team: Ben Gindl, Katie Mantell, Sean Throckmorton, Tim Schneider, Travis Histed Advisors: Dr. Azer Yalin, Dr. Mark Lindsay, Grant.
Robots with four wheels
P14551: Multi-process 3D Printer Critical Subsystem Review
Eddie Chan Behnaz Ghouchani Golnaz Ghouchani
9/28/18 – Earthquake and Tsunami hit Indonesia
P14551: Multi-process 3D Printer Critical Subsystem Review
Presentation transcript:

Project Manager: Stewart WadsworthFaculty Guide: Dr. SahinProject Number: P09207 Ground Scouts Robotics P09207 Week 3 Update Final Specifications Functional Decomposition Concepts Generated Plan for Concept Selection

Project Manager: Stewart WadsworthFaculty Guide: Dr. SahinProject Number: P09207 Top Down→Bottom Up System Level Design Locomotion/Power Locomotion Layer (Stewart) Power Layer (Tae) Processing Main Processing Layer (Alex) Embedded Processing (Matt) Sensors Sonar Layer (Tae) IR Layer (Tae) Camera Layer (Alex) GPS (Matt) Communications/Interfacing Communication Layer (Josh) User Interface Software (Josh) Modularity Low Cost Robot Velocity 2 hours of operation Powerful Simple yet functional 2m Range 50m Range 1m Range Simple yet functional 640x480 at 30fps Speed and range Capacity Range and accuracy Capacity and Range 3m accuracy Specifications Functional Decomposition

Project Manager: Stewart WadsworthFaculty Guide: Dr. SahinProject Number: P09207 Concepts Generated Omni Directional Drive Skid Steer

Project Manager: Stewart WadsworthFaculty Guide: Dr. SahinProject Number: P09207 Plan for Concept Selection A B C (reference) Benchmar k Skid Steer Omni Directional Selection CriteriaWeightRatingNotesWtdRatingNotesWtdRatingNotesWtd Low Cost20% Low Power Consumption15% Familiarity15% Ease of Assembly10% Number of parts10% Driving Speed10% Number of screws5% Aesthetics5% Total %90% Total Score Rank x Continue? No sum(Weight) = 100% Rating: 5 good, 1 bad