1 Background Monitoring in the DIRC MDI meeting, May 25 th 2006 Nicolas Arnaud  Automatic monitoring  A few plots  What’s next?

Slides:



Advertisements
Similar presentations
Our automated solution at a glance By: Justin Hollander.
Advertisements

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
4th July Two physics fill during the day Smooth data taking LHC plans changed: 90m run postponed to tomorrow (24h) OT FE still excluded, to be looked at.
Daylight visibility of Laser Beam Eastbourne, October 2005 Daylight Visibility of a kHz - but µJ – Laser Beam.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
W. KozaneckiMDI meeting, 19 Mar 04 Separating the luminosity background from the non-colliding beam-gas contribution  Principle  the problem  the beam-gas.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
Luminosity Monitors MICE Video Conference 7 May 2009 Paul Soler.
Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
Scheduling of Experiments Christine Clarke, 10 th October 2012 FACET User Meeting.
A Stanford Linear Accelerator Center b CEA-Saclay, c LPNHE des Universités Paris 6 et Paris 7 d LAL, Universite Paris Sud e Ecole Polytechnique, Laboratorire.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
LIGO- G Z 03/23/2005LSC Meeting March BlockNormal Near-Online S4 Burst Analysis Keith Thorne Penn State University Relativity Group (Shantanu.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
MDI meeting, March 19, 2004 Categorizing radiation aborts Livio Piemontese When something really bad happens to the beams, they are aborted. An optimized.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
Developing Tune Feedback for PEP-II Alan Fisher SLAC e + e – Factories 2003 October 13–16.
Monday, 9/26Day 31 1.Which number is less than 4,329? 4,589 4,294 4,330 4,429 2.What is the value of this number? 80,000+7, = = =
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
Introduction to Management
Afterglow Studies Eric Torrence University of Oregon 183 nd LMTF Meeting 10 October 2013.
Update on STAR AGS/RHIC Time Mtg February 18, 2014 Bill Christie Summary: We started looking for collisions Thursday morning (2/13/14). Determined the.
RICH upgrade simulation: updates RICH upgrade-software meeting 1 S.Easo.
RICH upgrade simulation: updates S.Easo RICH upgrade-mechanics meeting 1.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
LHC online modeling Mark IV LHC online modeling Mark IV Piotr Skowroński Tobias Persson Agnieszka Szczotka Jaime Coello de Portugal Lukas Malina Mattias.
NEW ON CALL PROCEDURES. Today's Session  Pay Protection.  Staff Attendance.  Percentages Payable.  Rates.  Example of a weekly shift.  Example spreadsheet.
12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
NIKHEF –D0 meeting, June 6, 2001 Freya Blekman, NIKHEF Amsterdam SMT pedestal management Weekly NIKHEF – NIJMEGEN – D0 meeting June 6, 2001 Freya Blekman.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
K. Jon-And, Stockholm University1 Tilecal Team 5 meeting 8 November 2005.
1 Software Quality Engineering. 2 Quality Management Models –Tools for helping to monitor and manage the quality of software when it is under development.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
1 What I did last year Nick Barlow Manchester Christmas meeting January 2005.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
Luminosity Monitor Design MICE Collaboration Meeting 31 May 2009 Paul Soler.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
ID Week 13 th of October 2014 Per Johansson Sheffield University.
Overview of EMU Software Rick Wilkinson. Slice Test DAQ We succeeded in using Slice Test DAQ code to take test beam data, combining chamber and trigger.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
L1Calo Operations Summary
M. Sullivan Apr 27, 2017 MDI meeting
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Scott D. Metzler California Institute of Technology
Update - SSRL testing of SLAC Ethernet Controller As of August 4, 2005
CSC Digi & RecHit Validation
DIRC Background Status
Background characterization: MD plan
Luminosity performance comparison: 5-6 Jun vs. 23 Dec 03
Stability of Calibration Data
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Presentation transcript:

1 Background Monitoring in the DIRC MDI meeting, May 25 th 2006 Nicolas Arnaud  Automatic monitoring  A few plots  What’s next?

2 DIRC background monitoring  Package DrcBackgroundMonitor  Dedicated (software) IOC: drc-soft  Code developped between August and October 2005  Motivation: period of high background in the DIRC (June-July 2005)  Plots produced daily since the startup of Run 5b ‘Daily’ plots (last 3 shifts) updated around 08:20 every morning  Cover previous day, swing and owl shifts ‘Biweekly’ plots (last 14 days) updated daily right after Midnight  including plot for the weekly background report  All plots easily available via webpages automatically updated: Most recent plots: Archives: Background monitoring central webpage:

3 Plots: the ‘storm’ period between Tuesday and Wednesday Scaler comparison: raw rates (kHz) Scaler comparison: rate ratios 400 kHz 1 2

4 Plots: things get better in the next 24 hours period 400 kHz 1 2 Scaler comparison: raw rates (kHz) Scaler comparison: rate ratios

5 Plots: background increase quicker than ‘expected’

6 Plots: background change between last week and this week A different tuning!?

7 Plots: difference visible in the scope plot as well More background The ‘storm’

8 Plots: Backgrounds were lower last October Smoother increase of scaler rate with growing luminosity All scaler rates below 300 kHz even with lumi above 9!

9 What’s next  Daily survey of the scaler rates  Shifter instructions updated  Do operators know about DIRC signals? Were they told to use them to tune the beams?  Look for source(s) of new background (Jerry, back at SLAC end of the month)  Discuss background issues during next DIRC meetings  Question: do we need additional shielding? [Certainly too early to answer now]  Present setup of scalers (12 DIRC scalers + 3 neutron counters):  Integrate hits during 0.5 second every 4 seconds  Impossible to get quantities insensitive to trickle injection with this config  Background characterization MD should come neither too early nor too late…