Module: 2 What is eTOD & Why is it so Important?

Slides:



Advertisements
Similar presentations
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Advertisements

Chapter 6 Sub-Group ICAO Headquarters, November 2013
CAA UK Preparation Activities for the ADQ IR
Terrain and Obstacle Databases Working Group (TOD WG)
IMPLEMENTING DQR A Practical View 19 February 2013 Danijela Maksimovic CAD Republic of Serbia.
Design and Development of Electronic Terrain and Obstacle Data (Areas 1 & 4) College of Engineering University of Tehran.
AIS AIM SG Ad-hoc Chapters 5-6 Group TOKYO MEETING REPORT.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002 NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES.
AIXM 5.1 implementation experience
AeroData Introduction, Overview & Schedule Aeronautical Data Workshop strategic airspace November 2011.
V0.2 © 2013 Avitech GmbH Friedrichshafen ● Bratislava ● Frankfurt/Main ● Konstanz ● Madrid Avitech GmbH Exchange Formats and Products The Aeronautical.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
Introduction to AIXM. Topics Criticality of AIS information AIM – a “data centric” approach Worldwide interoperability AIXM mission Related developments.
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
EUROCONTROL Digital NOTAM Project
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
AIS/MAP Seminar Kiev May 2003 EUR/NAT Regional Officer AIS/MET Björn Hellroth EUR/NAT Regional Officer AIS/MET Björn Hellroth.
What’s New with AIXM 5. Explaining AIXM 5 Mission and Objectives Coverage of the AIXM 5 data model –Scope of aeronautical information –Emerging “partner”
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
Aeronautical Data 2-Day Workshop Module: 1 Introduction strategic airspace November 2011.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
By: Date: Federal Aviation Administration Review of 2007 South and Central America AIXM workshop Federal Aviation Administration May 2009 AIXM Seminar.
1 Digital NOTAMs – A new paradigm. 2 Discussion Points NOTAMs – what are they? Recommendations from the AIM Global Congress Components of a digital NOTAM.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
Air Operations Division AIM System for ASECNA organisation (17 African countries) Description:  Full AIM solution composed of AIXM / eAIP / Charting /
The European Organisation for the Safety of Air Navigation Aeronautical Information Exchange Model (AIXM) – Business Rules.
AIS AIM SG 8 Presented by: by: Charity Muthoni ICAO Headquarters: 4 th -8 th November Draft PANS-AIM Chapter 4 Sub group.
ICC © Ifield Computer Consultancy Limited 2013 Ifield Computer Consultancy Limited Presentation to Directorate General of Civil Aviation of Kuwait And.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Roadmap Phase 2 EAD & AICM By: Eduard Porosnicu, AIM Expert 7-8 October 2009 ACAC – AIM Workshop.
AIXM - purpose, scope, implementation and future evolution.
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
Aeronautical Data 2-Day Workshop Module: 3 eTOD & Other AeroData: Data Quality Context.
AIXM 5 Concepts This presentation is based on the first part of the “AICM and AIXM 5 - Exchange Model goals, requirements and design” document. The purpose.
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Aeronautical Information Services Provider.
AIS-AIMSG/12 Briefing to ANC 23 October 2015
CANSO AIM WG Activities
Introduction to AIXM The purpose of this briefing is to present the evolution of AIXM from a specification intended to support AIS automation and static.
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
AIXM 5.1 – Interoperability issues
Aerodrome Obstruction Identification Surfaces
NON-CONFORMITIES AND EXEMPTIONS AERONAUTICAL STUDIES
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
AIS AIM SG Ad-hoc Chapters 5-6 Group
Draft PANS-AIM Chapter 4 ICAO Headquarters: 4th-8th November
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
Workshop on preparations for ANConf/12 − ASBU methodology
AIS/MAP Seminar Kiev May 2003
AIXM 5 Overview xNOTAM Workshop #2 Brussels, November 2007
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5 Development Status
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
AIXM 5.1 – Interoperability issues
Digital AIM “D-AIM” Sam Van der Stricht EUROCONTROL
23 May 2012 AIS-AIM SG #6.
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

Module: 2 What is eTOD & Why is it so Important? Aeronautical Data 2-Day Workshop

Module: 2 What is eTOD & Why is it so Important? Aeronautical Data 2-Day Workshop Module: 2 What is eTOD & Why is it so Important? November 2011 strategic airspace

Objectives Understand reasons for eTOD Why What it is intended for? Be aware of related Aeronautical Data Requirements Be aware of eTOD status In terms of actual and potential applications In other regions and countries Understand issues in relation to good implementation Have sound overview of DGCA’s electronic terrain and obstacle data… and how well it conforms to eTOD requirements

Why is eTOD Happening? ICAO, FAA, EUROCONTROL, IATA, IFALPA, et al: CFIT continues to be major issue — and airborne systems can use such data, but need good data and standardised — hence incorporation of terrain data with obstacle data (refer DO276, App C-3, C.3) Increased push for improved systems for: Quality / Risk Management / Safety Management Industry pressure Improved safety Industry competitiveness (functionality advantages), and increasing capabilities) Standardisation (consistency) for wide-spread use by multiple applications (ground, airborne, data management, etc)

Why is eTOD Happening? Globalisation / Standardisation Logical extension of standardisation of other aeronautical data Eg, originally ARINC, now AIS->AIM. Eg, in Europe, EAD. Global standards, AICM/AIXM Applications that will use this kind of data will expect the data to conform to eTOD (Annex 15, RTCA DOs, etc) in future Data used/provided by all the different agencies and states around the world needs to be consistent so that It is able to be properly interpreted (data integrity); and It will be usable in a safe and consistent manner

Intended eTOD Data Uses Sum mary in RTCA Document, DO 276, Appendix C

Intended Uses Airborne Databases (ADBs) CNS/ATM Lots of “futures” Eg, ADSB / communications coverage Refer EUROCONTROL DEMETER for DME/DME Assessment Lots of “futures” They are still to be well defined and specified… But it takes a long time to develop such applications “Closest” real applications TAWS – eg, EGPWS (terrain only) Obstacles AND Terrain: Flight Procedures PANS-OPS Procedures: especially for RNAV, RNP, other semi and precision procedures and all PBN (note: may include departures in future) Engine-out procedures

Background to ICAO Standards Developed based on industry and ISO standards RTCA Docs 200A – Standards for Processing Aeronautical Data 201A – Standards for Aeronautical Information 276 – User Requirements for Terrain and Obstacle Data ISO 19000 Series for Geographic Information Derived from Open GIS Consortium (OGC) Key standards: ISO 19113 (Quality Principles) ISO 19115 (Metadata) ISO 19131 (Data Product Specifications Aviation Standards for Aeronautical Data ICAO Annexes 4, 14, 15 ICAO Doc 9881 Guidelines for Electronic Terrain, Obstacle and Aerodrome Mapping Info and related FAA and European standards (based on above)

Basic Understanding of eTOD eTOD is specified in Annex 15 as having the following characteristics A set of minimum data quality requirements …for each of the geographic areas …defined for different applications; Metadata that should be captured and stored with eTOD data Two types of data: Obstacles; and Digital Terrain Models (DTMs) Terminology for Digital Terrain Data DTM (Digital Terrain Model) DEM (Digital Elevation Model) DTED (Digital Terrain Elevation Data)

eTOD Capture Areas eTOD Capture Areas Source: Annex 15

eTOD Capture Areas Source: Annex 15

eTOD Capture Areas Source: Annex 15

eTOD Capture Areas Source: Annex 15

eTOD Status / Issues General Points Future applications: requirements still vague and not necessarily well understood Responsibilities & Cost Terrain Data Data volumes extreme, and costly, to capture and manage System capacity and management limitations How to use productively in existing systems Capture methods, timeliness Filtering? Management of change due to significant natural event (eg, earth quakes, volcanoes, landslides, tsunamis)

eTOD Status / Issues General Points Obstacle Data Cost implications are greatest, particularly with ICAO requirements for check and update cycles (1, 5 yrs) Handling of data between surveys (eg, proposals, approvals, construction, non-approved, temporary) Integration with Annex 14 (OLS) requirements ?! Management of change due to significant natural event. Main potential implications are where geotechnical shift has caused displacement - laterally &/or vertically – of key features (eg, runway features) and obstacles * Note re significant events causing change eTOD: Link to SMS Requirement to check survey Potential NOTAMs, IFP Redesign &/or Revalidation Change Data Quality attributes in DB?

eTOD Status in Other Regions Some specific examples Australia not going to comply for ? years (unspecified) Regional Implementations EUROCONTROL eTOD Forum (http://www.eurocontrol.int/aim/public/standard_page/interop_tod_forum.html) attempts to simplify through 'interpretation' One recent estimate of costs: EUR0 0.5m per airport for terrain survey in Area 2 Some countries now have Areas 1 and 4 Data volumes and management of data a big concern AFeTOD - Africa - just starting Notice of differences where cannot comply Country-specific France, Spain, Egypt, etc Refer EUROCONTROL eTOD Forum Exchanges

eTOD in Indonesia? Sources and implementation of eTOD for Indonesia? Use of Publicly Available Terrain Data for Area 1? Management and consistency across different agencies? Same Meta data, same handling, same interpretation Ongoing maintenance and development of eTOD. Need maintenance system and specification, which incorporates processes for reviewing the maintenance system and the related specifications) System must include regular schedule for review, etc Ongoing surveys - more than Annex 14 requirements Process for incorporating data inbetween surveys (eg, approvals, temporary obstacles, unapproved obstacles, etc) Data improvement — include feedback to data supplier and getting controlled updates