Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.

Slides:



Advertisements
Similar presentations
CALICE Summary of 2006 testbeam for the ECAL
Advertisements

SiW ECAL R&D in CALICE Nigel Watson Birmingham University For the CALICE Collab. Motivation CALICE Testbeam Calibration Response/Resolution MAPS Option.
The CALICE test beam activities Fabrizio Salvatore Royal Holloway University of London (for the CALICE collaboration) ALCPG07, FNAL, Chicago, 22 nd October.
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
November 3rd, 2006 CALICE-UK, Manchester - A.-M. Magnan - 1 Noise studies DESY + CERN TB overview Anne-Marie Magnan Imperial College London.
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
13/02/20071 Event selection methods & First look at new PCB test Manqi Ruan Support & Discussing: Roman Advisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua))
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
RAL, 25-Jan-2005Nigel Watson / CCLRC-RAL PPD CALICE Calorimetry for LC  Physics motivation  Calorimetry  Design Considerations  CALICE  Status  Future.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay IEEE – NSS&MCI '08 Dresden/Germany - October The.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
The 2007 CALICE Test CERN (part II) Erika Garutti, Fabrizio Salvatore.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Positional and Angular Resolution of the CALICE Pre-Prototype ECAL Hakan Yilmaz.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Calice Meeting Argonne Muon identification with the hadron calorimeter Nicola D’Ascenzo.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay ACFA/GDE Wordshop – TILC '08 Sendai Japan - Mar
or getting rid of the give-away particles in a test-beam environment
Beam test of Silicon-Tungsten Calorimeter Prototype
CALICE SiW Electromagnetic Calorimeter
Test Beam Request for the Semi-Digital Hadronic Calorimeter
FCAL R&D towards a prototype of very compact calorimeter
the CALICE test beam set-up and running experience
Preparation for CERN test beam
CALICE scintillator HCAL
The Beam Test at Fermilab:
CALICE News The 2007 beam tests have started!
ScECAL+AHCAL+TCMT Combined Beam FNAL
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Rick Salcido Northern Illinois University For CALICE Collaboration
longitudinal shower profile
CALICE: Major Items Since September
Michele Faucci Giannelli
LC Calorimeter Testbeam Requirements
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London On behalf of the CALICE-ECAL Collaboration

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 2 Content 1. Introduction Briefly, what does the ECAL look like ?? The three 2006 test beam periods and their objectives 2. Data taken > 5 TBytes on disk, 65 million physics events 3.Electron and hadron events A few event displays. 4. Noise issues A perfect detector would be amazing ! 5. Conclusion A successful experience

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 3 200mm 360mm The Electromagnetic Calorimeter prototype ECAL prototype: 30 layers of variable thickness of Tungsten Active silicon layers interleved Front end chip and readout on PCB board Signals sent to DAQ W layers wrapped in carbon fibre 3 modules with different tungstene thickness, total = 24 X 0. PCB+Si layers:8.5 mm 62 mm 6x6 1x1cm 2 Si pads Conductively glued to PCB Active area of 12*18 cm 2 now completed for 30 layers Last year : only 14 layers Last 1/3rd expected in May 2007.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 4 Overall objective of 2006 beam test for ECAL Characterize detector performances. Test and tune the simulation. Once we trust the simulation  optimisation of the ILC detector. Identify hardware problems to correct them before building the whole so-called EUDET module. Test particle flow algorithms.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan beam test periods DESY. First cosmic events in the “tent”. Feb May DESY TB area, 1-6 GeV electron beams, with only 24 layers. 14 days in total. July 27th Aug 8th ECAL CERN period : cancelled !! No beam, SPS fault, not ours.... AHCAL+TCMT period : transformed into 5 days ECAL+5 days AHCAL stand alone + 3 days, courtesy of ATLAS, for ECAL stand alone. Combined ECAL+AHCAL + TCMT, with 6cm Aug 25th Sept 6th Oct 11th Oct 30th 500 pedestal events Data taking structure: 500 calibration events 10k beam events 500 pedestal events...etc...

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 6 Tracker: 4 drift chambers ECAL: 24 layers, 5184 channels First tests of ECAL-HCAL combined acquisition DESY TB setup ECAL at 0° : 3 position points Angle scan : 2 position points and angles studied : 10 °, 20°, 30°, 45° For each point : energy scan with 1, 1.5, 2, 3, 4, 5, 6 GeV Aiming at 100k events per sample

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 7 DESY Data Samples  Shower fully contained Garbage and empty events Multi-particle events Energy (mip) per event  Energy and angle scan completed, with ~200k events or more per point.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 8 CERN installation  Particle ID: Cherenkov counter, 1bit signal  Tracker : 3 XY proportional chambers (MWPC)  Calorimeters : ECAL: 30 layers, 6480 channels HCAL: 15 modules, 3240 channels TCMT: 8 modules, 160 channels

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 9 CERN- August period in figures + 30 Millions of Muon events for calibration.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 10 A few hadron runs combined with AHCAL and TCMT

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 11 CERN October period Add another 27 Million physics events ! + 42M of muons for calibration + 14M only for HCAL calibration M of HCAL only runs M “only” dedicated to beam tuning Detail of the 27 M: - Another 3.8 M dedicated to electron studies between 6 and 50 GeV - And 23 M of hadronic events between 6 and 80 GeV

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 12 Electron runs  One point overlap with DESY TB at 6 GeV. Electron combined runs E (GeV)e+ (kEvts)e- (kEvts)

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 13 Combined pion runs E (GeV)π+ (kEvts)π- (kEvts) Hadron runs With ECAL and HCAL at 6cm from each other this time ! E HCAL vs E ECAL (mip)

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 14 Summary of events Size on disk: ~ 40 kB/evt  65M events = 2.5 TB for CERN Physics runs  + 70 M = 3 TB for muon calibration runs August period October period Sept. break μ calib. runs μ calib.  See Roman’s Talk on Wednesday.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 15 Electron showering in the ECAL

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 16 An hadronic event 10 GeV pion event, taken Oct 16th 2006

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 17 A few problems, “of course” 1.Pedestal instabilities : results in “noisy” layers, with a correlated noise over a whole PCB of up to 50% of a MIP !!! –Not understood yet ! Currently investigating on an hardware point of view. –A preliminary procedure to correct this effect event by event is applied in the data reconstruction, but need further studies. –the pedestals are measured at periods throughout the run so this effect can be tracked. –This concerns only less than 3 PCBs over “Square events” : appearence of hits around some wafers, in the guard ring zone.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 18 Pedestal instabilities... Ex: Muon run (ECAL threshold : 0.5 MIP) Noise A Good PCB A PCB with unstable pedestals

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 19 “Square” events... Proportion of events concerned : high energy data (electrons 45 GeV) : ~4% low energy data (electrons 3 GeV) : <

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 20 Conclusion A successful experience !! Lots of data taken, stable detector running, people on-site to solve the problems as soon as they appeared. Electron data samples from 1 to 50 GeV ready for analysis. Further plans : TB in May-June next year (currently in negotiation with CERN) with possibility to rotate both ECAL and HCAL+TCMT. + Fermilab with AHCAL in fall 2007, and DHCAL in winter 07/08.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 21 Thank you for your attention.

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 22 CERN installation Muon 1 Muon m beam Beam instrumentation: 1) ~500 m beam line after Be trg = magnets, collimators, secondary trg, abs 2) Cherenkov detector for e/  separation < 40 GeV 3) 3 x/y pairs of Multi Wires Proportional Chambers (MWPC) with double readout, multi-hit capability 4) veto counter, r/o analog amplitude, to separate multi-particle events 5) trigger system 2) 3) 4) 5) are integrated in the DAQ and read out event by event 3x3 10x10  trigger * all in mm π event

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 23 DESY installation

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 24 View of an ECAL board

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 25 Beam quality DESY

Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 26 The data taken CERF period: parasitic muon high intensity, wide distribution  Very important for calibration !!! All what was collected in the ECAL run: 60 GeV secondary beam, tested e GeV and  GeV. Combined run, goal: ECAL EM program - e GeV, from 50 GeV beam, with 0,10,20,30 deg - small samples of  GeV too large distance ECAL-AHCAL AHCAL stand alone, ECAL removed GeV secondary beam tested  / e 6,10,15,20 GeV GeV secondary beam e GeV and p GeV !!! large fraction of time invested in beam tuning !!!  3 additional days “courtesy” of ATLAS: AHCAL and TCMT out of beam line, ECAL re-installed for high statistics low energy runs (thanks to all voluntary shifters) up to 10 million events in one day!