NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.

Slides:



Advertisements
Similar presentations
Office of State Planning and Budgeting: Capital Construction and Information Technology Projects Review and Requests June 6, 2014 Laura Blomquist.
Advertisements

DOE Neutrino Program Plans
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Project X: News & Strategy Steve Holmes Project X Working Group Meeting November 19, 2009.
F Future of Neutrino Program at FNAL NuMI Off-Axis Meeting Hugh Montgomery January 12, 2004.
F Axis Off Axis Introduction Off-Axis Cambridge Meeting 12 January 2004 Gary Feldman.
NuMI Offaxis Near Detector and Backgrounds Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Doug Michael Jan. 12, First goal is to be ready to select an optimal technology in ~one year. –Demonstrate that fundamental technologies are ready.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Welcome to SNOLAB David Sinclair. Welcome to our new Building Note – Building is still under construction Note – Building is still under construction.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
Progress with the Off-axis Experiment LoI and PAC Response Ongoing detectors R&D Simulation efforts Sites UCL meeting Next steps.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Long Baseline Experiments at Fermilab Maury Goodman.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
Cost and Engineering Working Group Introduction Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group LBNE Reconfiguration.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Gary Feldman MINOS in Cambridge 24 March NO A Update MINOS Collaboration Meeting Cambridge, England 24 March 2009 Gary Feldman.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
9/2/2004 TB Strategy J. Yu 1 LC Test Beam Funding and Strategy Large number of detector R&D groups made great progress Technology decision provides great.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Project X Working Group Meeting January 15, :00 PM Snake Pit.
Update on GIT Funding FY 14, FY 15 and Beyond Greg Allen EPA CBPO September 30, 2015.
Low Z Detector Simulations
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 1 Cost and Schedule Overview Marc Kaducak LARP Review June 10, 2013.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
LBNE Reconfiguration Engineering/Cost Working Group Report Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group Fermilab.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Comments on the February DOE Review
SCT Project Management Issues
Head, Office of Project Management Oversight (OPMO)
Conventional Facilities and Siting Global Group (ARCFS)
Olof Bärring LCG-LHCC Review, 22nd September 2008
Francesco Forti University and INFN, Pisa
Preparations for a Lehman Review
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Overall Project RAG Status:
Technical Advisory Committee
TSF Upgrade Project Overview Resources Plans and Timetable
A High Intensity Neutrino Oscillation Facility in Europe
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004

Stan Wojcicki, Costs / Future Plansp.2 Costs We have tried to cost, in a uniform manner, 4 kinds of detectors based on different technologies: RPC’s with x and y readout on each chamber RPC’s with alternating 1-D readout Segmented liquid scintillator Segmented solid scintillator The current estimates are still very preliminary: No independent verification as yet Burdens assumed identical for all items No significant optimization performed

January 12, 2004Stan Wojcicki, Costs / Future Plansp.3 Cost Comparison

January 12, 2004Stan Wojcicki, Costs / Future Plansp.4 Current Activities We have submitted an R&D Proposal to NSF for 3 years We are working on a proposal to Fermilab for off-axis experiment to be considered at June 2004 PAC meeting Next year will be focused on R&D and cosmic ray test Construction funds for the experiment could come from NSF MRE program or from DOE We are aiming for start of construction in 2006; data taking with partial detector in 2008 In parallel 4 Divisions of American Physical Society are organizing a 7-month long workshop on neutrino physics to be concluded with a potential “roadmap” in summer ‘04

January 12, 2004Stan Wojcicki, Costs / Future Plansp.5 Possible Time Scenario Spring R&D funds from NSF June Stage 1 Approval from Fermilab Summer APS study report finished Initial funding proposed for FY06 (Oct. 1, 2005) December final technology decision Proposal update document submitted to Fermilab June Final approval by Fermilab Construction funds requested for FY07 October Start of construction September start of data with 25% of detector September detector construction completed

January 12, 2004Stan Wojcicki, Costs / Future Plansp.6 Final comments re schedule The schedule outlined is the technically feasible one with some optimistic assumptions about flow of funds The NuMI Off-axis Experiment projected cost is essentially the same as the cost of the whole NuMI project - beam, detectors, conventional construction (~$175M) The latter will take 5 years of funding to complete - mainly because of delay in completion of underground excavation work

7 Submit proposal (2 technologies) Request ND approval Phase I approval of full detector FNAL NSF R&D: Year 1 Test beam prototype Cosmic ray test ND, FD engineering R&D: Year 2 ND construction FD engineering R&D: Year 3 FD engineering MRE Proposal NSF proposal cycle NSF funding cycle Test beam, cosmic running Near detector in beam P5 Review FNAL reviews Refined proposal: cost/schedule, conceptual design PAC