MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.

Slides:



Advertisements
Similar presentations
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Advertisements

FIGURE OF MERIT FOR MUON IONIZATION COOLING Ulisse Bravar University of Oxford 28 July 2004.
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
MUTAC Fermilab Alain Blondel 16 March Status of MICE MUTAC March 2006 at FERMILAB.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
MICE collaboration meeting Alain Blondel June MICE challenges organization global funding situation.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
MICE beam line review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE Funding agency committee meeting Alain Blondel 1 MICE: challenges, organization, global funding situation.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Fast TOF for Muon Cooling Experiments Robert Abrams Muons, inc.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE: The International Muon Ionization Cooling Experiment Ulisse Bravar University of Oxford ICHEP ‘04 1 MICE: The International Muon Ionization Cooling.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
MICE CC visit at CERN Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
(one of the) Request from MPB
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
P. Dornan, K. Long, 2 October, 2016 MICE, the Neutrino Factory and the Muon Collider.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Experimental Tests of Cooling: Expectations and Additional Needs
MICE The International Muon Ionisation Cooling Experiment
Tom Roberts Muons, Inc. Illinois Institute of Technology
The Muon Ionization Cooling Experiment: Controls and Monitoring
The Detector System of the MICE Experiment
Presentation transcript:

MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011

MANX meeting 15 July 2008 Alain Blondel 2 MICE Collaboration life can be explored here: no credit card or ID required See in particular « weekly news » for recent developments and « collaboration meetings » for overview See MICE proposal and technical reference document for more details

MANX meeting 15 July 2008 Alain Blondel 3 IONIZATION COOLING principle: this will surely work..! Difficulty: affordable prototype of cooling section only cools beam by 10%, while standard emittance measurements barely achieve this precision. Solution: measure the beam particle-by-particle Cooling is necessary for Neutrino Factory and crucial for Muon Collider. Delicate technology and integration problem Need to build a realistic prototype and verify that it works (i.e. cools a beam) Can it be built? Operate reliably? What performance can one get? state-of-the-art particle physics instrumentation will test state-of-the-art accelerator technology. reality (simplified) ….maybe…

MANX meeting 15 July 2008 Alain Blondel 4

5  Incoming muon beam Variable Diffuser Beam PID TOF 0 Cherenkovs TOF 1 Trackers 1 & 2 measurement of emittance in and out Liquid Hydrogen absorbers 1,2,3 Downstream TOF 2 particle ID: KL and SW Calorimeter RF cavities 1RF cavities 2 Spectrometer solenoid 1 Matching coils 1&2 Focus coils 1 Spectrometer solenoid 2 Coupling Coils 1&2 Focus coils 2Focus coils 3 Matching coils 1&2 10% cooling of 200 MeV/c muons requires ~ 20 MV of RF single particle measurements => measurement precision can be as good as  out /  in ) = never done before

MANX meeting 15 July 2008 Alain Blondel 6 Challenges of MICE: (these things have never been done before) 1.Operate RF cavities of relatively low frequency (201 MHz) at high gradient (nominal 8MV/m in MICE, 16 MV/m with 8 MW and LN2 cooled RF cavities) in highly inhomogeneous magnetic fields (1-3 T) dark currents (can heat up LH 2 ), breakdowns 2. Hydrogen safety (substantial amounts of LH 2 in vicinity of RF cavities) 3. Emittance measurement to relative precision of in environment of RF bkg requires low mass (low multiple scattering) and precise tracker fast and redundant to fight dark-current-induced background precision Time-of-Flight for particle phase determination(±3.6 0 = 50 ps) complete set of PID detectors to eliminate beam pions and decay electrons and… 4. Obtaining (substantial) funding for R&D towards a facility that is not (yet) in the plans of a major lab

MANX meeting 15 July 2008 Alain Blondel 7 Design of MICE detectors and beam test results have satisfied the above requirements Requirements on detectors for MICE: 1.Must be sure to work on muons 1.a use a pion/muon decay channel with 5T, 5m long decay solenoid 1.b reject incoming pions and electrons TOF over 6m with 70 ps resolution+ threshold Cherenkov 1.c reject decays in flight of muons downstream PID (TOF2 + calorimeter set up) 2. Measure all 6 parameters of the muons x,y,t, x’, y’,  z =E/Pz tracker in magnetic field, TOF 3. Resolution on above quantities must be better than 10% of rms of beam at equilibrium emittance to ensure correction is less than 1%. + resolution must be measured 4. Detectors must be robust against RF radiation and field emission

MANX meeting 15 July 2008 Alain Blondel 8  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II STEP IV Delivery of 1st FC october 2009! STEP V spring 2010 STEP VI Q STEP III/III.1 UK PHASE I UK PHASE II

MANX meeting 15 July 2008 Alain Blondel 9 9 ISIS MICE Hall R5.2

MANX meeting 15 July 2008 Alain Blondel 10 Universite Catholique de Louvain, Belgium University of Sofia, Bulgaria The Harbin Institute for Super Conducting Technologies PR China INFN Milano, INFN Napoli, INFN Pavia, INFN Roma III, INFN Trieste, Italy KEK, Kyoto University, Osaka University, Japan NIKHEF, The Netherlands CERN Geneva University, Paul Scherrer Institut Switzerland Brunel, Cockcroft/Lancaster, Glasgow, Liverpool, ICL London, Oxford, Darsbury, RAL, Sheffield UK Argonne National Laboratory, Brookhaven National Laboratory, Fairfield University, University of Chicago, Enrico Fermi Institute, Fermilab, Illinois Institute of Technology, Jefferson Lab, Lawrence Berkeley National Laboratory, UCLA, Northern Illinois University, University of Iowa, University of Mississippi, UC Riverside, University of Illinois at Urbana-Champaign, Muons Inc. USA THE MICE COLLABORATION -130 collaborators-

MANX meeting 15 July 2008 Alain Blondel 11  Incoming muon beam Variable Diffuser Beam PID TOF 0, TOF 1 Cherenkovs Trackers 1 & 2 Liquid Hydrogen absorbers 1,2,3 Downstream particle ID: TOF 2, KL SW Calorimeter RF cavitiesRF power Spectrometer solenoid 1 Spectrometer solenoid 2 Coupling Coils 1&2 Focus coils MICE Collaboration across the planet

MANX meeting 15 July 2008 Alain Blondel 12 Beam Line Runs at ~1 Hz (1/50 of ISIS 50 Hz) Nominally 600 muons in 1 ms time gate fine structure of ~50 ns width separated by 300 ns (3MHz ISIS RF) Pmuon = 140MeV/c to 240 MeV/c Dp/p= 15% Emittance from 2-3 to 10 pi.m.mrad Purity >99% muons Range in momentum could be slightly extended up to 400 MeV/c(purity?) More muons is probably excluded … except by rebuilding the target for higher rep rate Instrumentation -- 2 Cherenkovs for high mom. mu/pi separation -- TOF with 50 ps resolution from Q6 to Q9 (x, y, t coordinates for each particle) -- Beam profile monitors -- Diffuser with 5 different thicknesses of lead

MANX meeting 15 July 2008 Alain Blondel 13

MANX meeting 15 July 2008 Alain Blondel 14 Trackers two identical trackers with 5 planes of 3-views, 440  m point resolution achieved scintillating fiber detector read-out with VPLCs (7-fold ganging of 350  m diameter fibers) Embedded in 4T solenoid 40cm inner bore with 5 tuneable coils providing constant B field + optical match. TOF + tracker can measure 6D emittance to sub-% precision for MICE eq. emittance mm ~330 mm

MANX meeting 15 July 2008 Alain Blondel 15 Spectrometer solenoids I II

MANX meeting 15 July 2008 Alain Blondel 16  60 L=60  65 L=90 tracker Spectrometer solenoid TOF and shielding KL calorimeter SW calorimeter

MANX meeting 15 July 2008 Alain Blondel 17 DATE framework (ALICE Readout by VME Trigger signals and run modes established Control and monitoring established (Daresbury) … MICE DAQ & Trigger data rate ~1MHz Controls working for beam magnets, March Electronic Logbook, March DAQ working in MICE Stage 1, 4 April 2008 Gva, Sofia, UK, IIT, Osaka

MANX meeting 15 July 2008 Alain Blondel 18 software, analysis & DATA Challenge 1. Basic simulation and reconstruction of MICE is complete for the various steps Both G4MICE and MUCOOL are used. 2. Putting it all together to do analysis (particle reconstruction, particle ID algorithms Single particle amplitude and emittance calculations, etc…) 3. Shortage of hands (general in MICE) is particularly felt here. Example  Bias on emittance due to muon decays Would be ~0.5% (i.e. 5% error on cooling meast) Reduced to <<0.1% by PID+ tracker This uses tracker & TOF info and PID signals +Neural Network

MANX meeting 15 July 2008 Alain Blondel 19

MANX meeting 15 July 2008 Alain Blondel 20 Cooling infrastructure -- 8 MW of RF power at MHz -- 8 RF cavities (40 cm long, pill box with Be windows, 22 cm radius aperture) -- can provide 23 MV at room temperature and 8MV/m Or 50% more at Liquid N 2 temperature. -- three Liquid H2 absorbers 35 cm long and 30cm in diameter -- H2 system -- three focus coil pairs -- coupling coils

MANX meeting 15 July 2008 Alain Blondel 21 Beyond PHASEII -- Ideas for « Phase III » ONCE PHASEII will be completed, having equipped the MICE hall with -- spectrometers, TOF and PID able to measure emittance to MW of 201MHz RF power MV of RF acceleration -- Liquid Hydrogen infrastructure and safety MICE can become a facility to test new cooling ideas. Such ideas were proposed: A. with the existing MICE hardware to test optics beyond the neutrino Factory study II: non flip optics, low-beta optics (down to 5 cm vs 42 cm nominal) other absorber materials He, Li, LiH, etc.. LN2 cooled RF cavities B. with additional hardware: -- A. Skrinsky to test a lithium lense available at Novosibirsk -- Muons Inc. to test a section of helicoidal channel (MANX) -- B. Palmer proposed a poor man’s concept of 6D cooling

MANX meeting 15 July 2008 Alain Blondel 22 CONCLUSIONS The cooling infrastructure at RAL will represent a considerable asset (est. 30M£) To which should be added know how, software etc… (unvaluable) In 2001 we thought this could be made in 3 years! We are grateful for Muons Inc. help in the present program and are welcoming discussions and plans for the future.