Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.

Slides:



Advertisements
Similar presentations
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 Hybrid & Module Testing Status Week of 6/6-6/10.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Phase 2 Outer Tracker Module analysis
UCSB Hybrid Bonding & Testing
Hybrid & Module Testing Status
US Module Production Status
Results from module testing
Vienna Module Production
On behalf of the US TOB testing group
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Hybrid & Module Electrical Testing
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Passitivation Location
FNAL Hybrid Testing Status
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Wirebonding UCSB FNAL Machines
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Hybrid & Module Testing Status
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara

Slide 2Susanne KyreDOE review, January 20, 2004 Wirebonding Equipment and Personnel Scale of the project Bonding times Bond quality TEC Outlook

Slide 3Susanne KyreDOE review, January 20, 2004 Equipment and Personnel Equipment: K&S 8090 wirebonder K&S 8060 wirebonder (receive end of January) Dage 3000 pulltester Stereo microscope Precision measuring microscope Personnel: 1 main wirebond technician (Julie Stoner) 1 backup wirebond technician (Andrea Allen) In the process of hiring a second wirebond technician 1 support technician (David Staszak)

Slide 4Susanne KyreDOE review, January 20, 2004 Scale UCSB will build ~4000 Modules with about 10 million wirebonds (that is 3 times the amount of wirebonds done in all of CDF; All of UCSB’s wirebonding for BaBar was 150,000 bonds, we will do that in a week) Full production TEC and TOB: 15 Modules per day 30 Hybrids per day

Slide 5Susanne KyreDOE review, January 20, 2004 Bonding times Starting point: Bond centers had bonding times of up to 40 minutes with about 10 bonds that didn’t stick and needed to be rebonded Wirebond programs now bond an entire Module or Hybrid (previously had separate programs for each row of bonds), reduced bonding time by 50% Wirebond programs for all Module and Hybrid types now use pattern recognition (bonding time reduction by about 2-3 minutes) Pure bonding time for a module < 5min, for a hybrid < 4min (CMS record) Additional time (set up, database entry, pull testing): ~11min for a module, ~ 8min for a hybrid Total processing time can be reduce by using a support technician Actual bonding times during mini production run: 2.5 hours for 10 modules (one technician)

Slide 6Susanne KyreDOE review, January 20, 2004 Bond quality CMS wirebonding spec: pull strength > 6g Extensive pull testing was done to determine a set of standard bonding parameters for each bonding surface Hybrids: We pull test 10 bonds on a test area on each PA Average pull strength: 10.0 g, std. Deviation: 0.6g

Slide 7Susanne KyreDOE review, January 20, 2004 Bond quality Modules: First 20 parts of each type, pull test every 50 th bond PA to Sensor bonds: Average pull strength: 9.9g, std. Deviation: 0.7g Sensor to Sensor bonds: Average pull strength: 8.2g, std. Deviation: 0.8g

Slide 8Susanne KyreDOE review, January 20, 2004 Bond quality 79 Modules and 92 Hybrids bonded so far Faults introduced during bonding: 1 pinhole (first TEC module) out of ~84000 bonds Shorts: 1 repaired short on a hybrid Open channels: 13 on modules, 5 on hybrids Bad channels introduced in bonding: 0.034% for modules, 0.012% for hybrids (historically 0.5% – 2%)

Slide 9Susanne KyreDOE review, January 20, 2004 TEC production We will do TEC Ring 5 and 6 Module production TEC Module and Hybrid wirebonding: All fixtures for Rings 5 and 6 are designed TEC Ring 6 module carrier and wirebond fixture were built and tested Wrote program and wirebonded 4 Ring 6 modules Wrote program and wirebonded 6 Ring 6 hybrids

Slide 10Susanne KyreDOE review, January 20, 2004 Future plans Produce hybrid and module carriers and wirebond fixtures in machine shop Write remaining wirebond programs for TEC Modules and Hybrids Installation and set up of new 8060 Wirebonder (end January) Training of new wirebond technician (mid February) Training of wirebond technician from Mexico Mini production run 2 weeks at full production capacity of 15 Modules per day (start January 26) Production bonding!