H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers.

Slides:



Advertisements
Similar presentations
RF Specification discussion MICE RF workshop 16 th April 2012.
Advertisements

11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Report from RF Session (1:30-5:40 PM, 3/30/2004) H. Haseroth and Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
MuCool Test Area RF Workshop 111/15/2010 Muons, Inc. Loaded Pillbox Cavity Milorad Popovic & Katheryn Decker French (with Mike, Chuck, Katsuya, Al and.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
THALES ELECTRON DEVICES
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
Low Emittance RF Gun Developments for PAL-XFEL
RF Cavity Design with Superfish
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
FERMI LINAC O VERVIEW The 1.5 GeV 50 Hz Upgrade July 2013 C. Serpico.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
MP - HIPPI General meeting, Abingdon October 28-30, Side Coupled Linac Design at CERN Side Coupled Linac Design at CERN M. Pasini, Abingdon September.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
High Gradient RF Issues and 88 MHz test results M. Vretenar for the 88 MHz team: R. Garoby, F. Gerigk, J. Marques, C. Rossi, M. Vretenar -The.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Multipacting Simulation for the PITZ RF Photo Gun Igor Isaev Unwanted Beam Workshop 2012 Humboldt-University Berlin, The PITZ RF Photo Gun.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
STATUS OF THE NC BUNCHING RFQ (Sub-task: SC-RFQ) Antonio Palmieri INFN-LNL.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
DTL: Basic Considerations M. Comunian & F. Grespan Thanks to J. Stovall, for the help!
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
RF R&D (Issues) for Muon Ionization Cooling Channels
ILC Power and Cooling VM Workshop
High efficiency work and MBK development for accelerators
Abstract EuSPARC and EuPRAXIA projects
Overview of the RFCC Module and 201-MHz Cavity Design
M. Migliorati, C. Vaccarezza INFN - LNF
NC Accelerator Structures
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
10 MHz amplifier status G. Favia
Physics design on Injector-1 RFQ
SPARC RF gun status by P. Musumeci Review committee
RF operation of REX-ISOLDE
Update of CLIC accelerating structure design
Case study 6 Properties and test of a Superconducting RF cavity
Status of the CLIC Injector studies
Physics Design on Injector I
ERL Director’s Review Main Linac
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 1 RF & RF power H. Haseroth CERN  Situation of 88 MHz test cavity  Availability of amplifiers  Some comments by F. Tazzioli on closed and open cavities

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 2 Situation of 88 MHz test cavity

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 3 andusing Power efficiency optimization

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 4 High gradient at low frequency (Kilpatrick: 2.3)  sparking: tests (high) magnetic field lines penetrating the cavities  multipactor: computations & tests large cavity dimensions  mechanical stability: computations field emission induced by lost particles  cavity test with beam. Challenges:

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 5 2. Status of the high gradient test set-up Original system: PS 114 MHz RF cavity for leptons

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 6 88 MHz test cavity

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 7 88 MHz test cavity (made from an 114 MHz structure) Closed gap case E 0 = 4 MV/m f rep = 1 Hz r/Q= 113   = 180  s t pulse, f rep = 1 ms, 1 Hz P peak = 1.4 MW P mean = 1.4 kW Kilp.= 2.3 gap= 280 mm length= 1 m diameter= 1.77 m Open gap case E 0 = 4 MV/m f rep = 1 Hz r/Q= 107   = 180  s t pulse, f rep = 1 ms, 1 Hz P peak = 1.5 MW P mean = 1.5 kW Kilp.= 2.3 gap= 260 mm length= 1 m diameter= 1.77 m

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 8 Asymmetric 88 MHz cavities

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 9

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 10 Preliminary parameters of an 88 MHz option for ICE Sketch of a 4 cavities module

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 11 Electrical power and cooling needs for the 88 MHz option in ICE => Advantage of the 10 Hz option Overall needs in infrastructure: H. Ullrich

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 12 An 88 MHz test cavity for high gradient is being prepared (2 MW amplifier driving a modified 114 MHz PS cavity) –High RF gradient without solenoid: end 2001 –RF test with solenoid: mid-2002 Cavity with closed gap: E 0 = 4 MV/m f rep = 1 Hz r/Q= 113   = 180  s t pulse = 10.5 ms P peak = 1.4 MW P mean = 15 kW Kilp.= 2.3 gap= 280 mm length= 1 m diameter= 1.77 m

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 13 2 MW amplifier 88 MHz cavity Nose Cone (closed gap) 88 MHz test cavity (made from an 114 MHz structure)

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 14 The RF chain up to 20 kW is assembled and will soon be turned-on. Next step will be to set-up the 200 kW driver stage which is already assembled

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 15 The mechanics of the 2 MW final stage is still in preparation. Most pieces are or will soon be available, kapton capacitor, anode resonator, coupling loops, coaxial lines,...] but assembly is still pending. As far as I know, nothing has yet been done to prepare diagnostics (no one available). This work has now a low priority, but we are keen to get results. We estimate that real tests of the full set-up will begin before this summer. (Roland dixit)

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE MHz test system status and planning SUMMARY First turn-on of the complete amplifier chain: 12/2001 (not yet) Setting-up on dummy load:03/2002 High gradient in the cavity:05/2002 Increase of RF power:10/2002 ? (push or 200k) Test with solenoid:12/2002 ?? (financing)

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 17 Amplifier cost / unit º Peak & mean RF power –Peak RF power º Gradient & RF frequency –Mean RF power º  Peak RF power & Duty factor Cavity cost / unit º  Gradient & RF frequency Number of amplifiers & Number of cavities º Gradient in the cavities Power consumption º Duty factor 1. Economically relevant parameters SUMMARY OF KEY PARAMETERS - Gradient in the cavities (Voltage per cavity) - RF frequency - Duty factor (repetition rate)

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE Preliminary analysis Effect of the duty factor Case 1: 5 ms useful beam time per second (100  s bursts at 50 Hz or 500  s bursts at 10 Hz) Case 2: “ refurbished ” CERN 200 MHz - 4 MW amplifier (Duty factor = 0.001)

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 19 Effect of the voltage per cavity General considerations N cav : Number of cavities V total :Total cavities voltage  V cav :RF voltage / cavity P cav :RF power / cavity P total :Total RF power Case of a limited number of 200 MHz - 4 MW amplifiers

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 20 N cav : Number of cavities n : Number of cavities per amplifier V total :Total cavities voltage k :Number of amplifiers  V cav :RF voltage / cavity C cav :Cavity cost P cav :RF power / cavity C amp :Amplifier cost P total :Total RF power C RF :Total RF cost Economical optimum: number of cavities & number of amplifiers Assumption : V total is imposed Tentative application: get 28 MV with 4 MW amplifiers C amp = C cav k optimum ~4, corresponding to 1 cavity per amplifier C amp =2 C cav k optimum ~3, corresponding to 1 cavity per amplifier C amp =4 C cav k optimum ~2, corresponding to 4 cavities per amplifier

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE MHz: 1 amplifier (spare for Linac2) 2 MW, (could be upgraded to 4 MW) 1 amplifier (from Linac1, needs refurbishing for 200 kCHF) 4 MW (FTH triode tube, ex-TH 516, water-cooled version) The first one should be used as driver for the second one  Total available power now 4 MW This could go up to a total of 8 MW, provided we find another driver amplifier of several hundred kW RF–Power Amplifiers available at CERN

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 22 RF–Power Amplifiers available at CERN 88 MHz: 1 amplifier available 2 MW (FTH triode tube) driver (LHC type, modified) available If amplifier is modified 4 MW achievable, but driver must be pushed 1 amplifier (from Linac1, needs refurbishing for 200 kCHF) 4 MW (pushed) driver needs to be found or the amplifier above must be used. Comment by Roland: A second 88 MHz cavity could be made available (i.e. another ex-PS 114 MHz cavity needs to be modified)

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 23 Cavities with Beryllium windows or grids versus open iris ones Cavities with closed iris are independent from one another and can be stacked at a distance lower than half a wavelength in order to reduce space occupation. As the ratio of peak to effective fields is low (close to unity) one can reach high accelerating fields without breakdown. The disadvantages are technical complication and Beryllium brittleness. Overheating of iris windows could be an issue at high duty cycle. Multipactor discharges on the Beryllium windows could also be a problem. The assumed cell length is 45 cm.  Some comments by F. Tazzioli on closed and open 200 MHz cavities for MICE

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 24 Open iris cells are technically simpler and their shunt impedance can be made comparable to that of the closed ones by suitable nose cones. The ratio of peak to effective fields is however higher. Moreover they cannot be stacked arbitrarily close to one another because they couple electrically through the beam tube. They could however be placed at half a wavelength pitch, which is 75 cm. In this case a series of cells would resonate in Pi mode (fields in adjacent cavities are in opposite phase) and a couple of cells could be driven by a single input RF coupler. Obviously in this case the accelerating field is limited by the maximum power which can be delivered through the input coupler. The peak power required by a single cell of length l=75 cm, for a field of E=10 MV/m is P= (E*l)^2/2*R= 5 MW

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 25 Be windowOpen cell  mode Cavity Layouts

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 26

H. Haseroth Thursday, February 5-8, 2002 MUCOOL / MICE 27 Conclusions (Franco Tazzioli) The Q values given by URMEL are too high for a real cavity, so we multiply them by an empirical reduction factor of 0.8. One can assume that the R/Q values are correct and compare the reduced shunt impedance values per unit length. For the closed iris case one obtains R= 10 MΩ/m and E peak /E effective =1.4 against R=6.4 MΩ/m and Epeak/Eeffective= 2.3 for the open one (Pi mode). Not considering technical difficulties and other side effects, the comparison is obviously in favor of the closed iris cavities.