1 Lean Thinking MGMT 511. 2 Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.

Slides:



Advertisements
Similar presentations
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Advertisements

JIT, TPS, and Lean Operations
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
JIT/Lean Production. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 15, Slide 2 Some.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
Implementation of Lean at Rheem Manufacturing Presenter Dr. Joan A. Burtner Associate Professor Industrial and Systems Engineering Mercer University School.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Chapter 7, Lean Thinking and Lean Systems
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S12-1 Operations.
Lean Six Sigma Methodology.
LEAN system.
JIT and Lean Operations
Just-in-Time and Lean Operations. Developments of JIT and Lean Operations 1960’s: Developed as Toyota Production System by Taiichi Ohno and his colleagues.
OPERATIONS MANAGEMENT for MBAs Fourth Edition 1 Meredith and Shafer John Wiley and Sons, Inc. Chapter 5: Process Improvement: Reducing Waste Through Lean.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Dr. Joan Burtner1 Introduction to the Lean Enterprise as a Quality Improvement Initiative Presented By: Dr. Joan A. Burtner Industrial and Systems Engineering.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Manufacturing Chapter 15 pp June 29, 2012.
Lean is a business system that focuses on doing only those things that add value to the customer, creating continuous one piece flow, and placing a high.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 15 Lean operations and.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Lean Production.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Operations Fall 2015 Bruce Duggan Providence University College.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Lean Manufacturing TT4290 L4S2. History of Manufacturing (1) Craft Manufacturing (2) Mass Manufacturing (3) Lean Manufacturing.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Best Performing Consulting Organization by “JIT & Lean Manufacturing” Adding Value In Totality !!
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 JIT and Lean Operations.
Mel Wendell – Mountain Pointe High School
Lean Manufacturing Series
Lean operations and JIT
Beni Asllani University of Tennessee at Chattanooga
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
Introduction to Lean Emily Varnado.
Welcome to my presentation
Just-In-Time and Lean Production
Chap 10 Learning Objectives
Just-In-Time and Lean Production
Implementation of Lean at Rheem Manufacturing
Presentation transcript:

1 Lean Thinking MGMT 511

2 Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement of a production system.

3 Objectives of Lean Produce the … –Highest quality –At the lowest possible cost –Within a short cycle time

4 Lean Pioneered and developed by Toyota TPS – Toyota Production System Womack and Jones invented the name Lean 3 important principles –Minimize waste –Continuous improvement –Respect for workers

5 Lean Lean is a philosophy that recognizes waste as the primary driver of cycle time, cost, and quality and employs techniques to continually drive out waste in processes.

6 Waste is ‘anything other than the minimum amount of equipment, materials, parts, space, and worker’s time, which are absolutely essential to add value to the product.’ — Shoichiro Toyoda President, Toyota

7 Becoming lean is the process of eliminating waste with the goal of creating value. It is not just about waste, it is also about value. Lean

8 Contrast TraditionalLean Producer “push” Movement of materials High volume Inspection Expert-driven Decomposition Periodic adjustment Large lot sizes Statistical Quality Control Customer “pull” Flow of value Flexible response Prevention Knowledge-driven Integration Continuous improvement Lot size of 1 Quality at the source

9 Statistical Quality Control TraditionalLean Inspection is expensive Infer from samples to save costs Inspect quality into the product Why? Can’t anyone do it? Inference implies risk of errors. Why are defects acceptable? Build it into the product

10 Historical Context Selected elements of the TPS implemented over 3 decades –Pull –Kanban (card) system –Production leveling –Reduced set-up time –Kaizen (continuous improvement) –Poka-yoke (error proofing) –Adnon (visual display)

11 Example – Kanban 1950’s – First Kanban experiments 1960’s – Kanban introduced company-wide 1970’s – Kanban introduced to suppliers

12 5 Principles of Lean Customer value: precisely specify value by product and service Value stream: identify the stream for each product or service Flow: no interruption Pull: customer pulls value Pursue Perfection: don’t compete Source: Womak and Jones

13 Value Definition Define customer needs Opposite of waste Use as metric

14 Value Stream Analysis Value Stream Map Critically assess Value-Added at each step Eliminate or minimize Non-Value-Added activities.

15 Value Added Activities Product or service is transformed into a state required for the customer. Activities for which the customer is willing to pay. VA

16 Non-Value Added Activities Activities which consume resources but create no value in the eyes of the customer. Customer is not willing to pay for these. NVA

17 Non-Value Added but Needed (or Necessary) Activities Activities causing no value added, but… Which cannot be eliminated based on current state of technology or thinking. NVA-N

18 Flow Continuous flow through the value stream. Make each product, each day, in direct proportion to demand. Move from traditional batching to small lot (or 1 unit) flow. Stability through reliability, quality and standardized work

19 Pull Pull the product through the value stream Authorize production – customer demand drives the process Cap WIP Kanban – signaling for required parts as they are needed

20 Perfection Create a clear vision of perfection –Production ideals –Customer value Make waste visible and evident Problem solve

21 What is Waste Any activity that is not adding value in the creation process of the product or service. Non-value added Non-value added but necessary

22 7 Types of Waste Defects in outputs Overproduction: not needed Inventories: for consumption or processing Unnecessary Processing Unnecessary Movement of people Unnecessary Conveyance of output. Waiting – for information, people, equipment

23 The Hidden Factory Stockrooms Material movers and moving equipment Expeditors Scrap Rework Obsolescence

24 Commonly Used Tools 5 S The visual factory Kaizen Poka Yoke Total Productive Maintenance (TPM) Single minute exchange of die (SMED) Takt time

25 5 S Simplify or Sort (seiri) – needed vs. unneeded items Straighten or Set (seiton) – keep in correct place Scrub or Shine (seiso) – keep clean and tidy Stabilize or Standardize (seiketsu) – use standard methods Sustain or Self-Discipline (shitsuke) – do not fall back to old way of doing things

26 The Visual Factory Make problems visible Charts to show performance Visual production and schedule boards Kanban (visible card signal)

27 Kaizen Continuous Improvement Improvements may be small However, many small improvements over time add up to major improvement

28 Common Poka-Yoke Examples (from John Grout’s Poka-Yoke Web Page) “Mistake Proofing”

29 Total Productive Maintenance (TPM) Impact on waste - breakdowns, setups, reduced speed TPM – Identify ways to maximize equipment effectiveness

30 Single Minute Exchange of Dies (SMED) Original term now extended to all setup time reduction efforts Fast setup or change-over Allows flexible use of machines – smaller lot sizes, reduced inventory Cost reduction More effective use of machines

31 Takt Time The rhythm of flow through a value stream Available weekly, daily or shift time –Divided by… Anticipated average weekly, daily or shift demand

32 Factory Physics Increase the velocity of flow of material Increasing flow is accompanied by reduction in inventory As velocity increases, the cost of the hidden factory decreases

33

34

35 Benefits of Lean Cost savings Revenue increases Investment savings Workforce improvements Uncovering problems

36 Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 12S-13 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle River, N.J Push versus Pull Push system: material is pushed into downstream workstations regardless of whether resources are available Pull system: material is pulled to a workstation just as it is needed

37 5 Tools for Improving Flow Process observation sheet Process flow diagram (we have done) Physical process map Time Value Map Takt Time (we have discussed)

38 Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 12S-8 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle River, N.J Management philosophy of continuous and forced problem solving Supplies and components are ‘pulled’ through system to arrive where they are needed when they are needed. What is Just-in-Time?

39 Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 12S-9 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle River, N.J Attacks waste – Anything not adding value to the product Customer’s perspective Exposes problems and bottlenecks – Caused by variability Deviation from optimum Achieves streamlined production – By reducing inventory What Does Just-in-Time Do?

40 Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 12S-32 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle River, N.J Traditional: inventory exists in case problems arise JIT objective: Eliminate inventory JIT requires – Small lot sizes – Low setup time – Containers for fixed number of parts JIT inventory: Minimum inventory to keep system running Inventory

41 Lean Continues from Just-in-time discussed in the text. Most recent approach to reducing waste and speeding the flow of product or service to the customer.

42 What Lean is Not A quick fix. Easy to do.