TB 11.01.07 Peter Glässel, Heidelberg1 TPC Status.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Installing Cable Floor Heating Systems This presentation will give you a practical idea of how to install a floor heating system.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Informatikdienste / IT-Services 30. Jan :T. Steiger, ID / SD, Beowulf Day Status Report of Implementations Gonzales.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
1 Installation of Delphi Frame  ITS Installation.
UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 BIS Integration and Commissioning Status All 112 bare BIS chambers are at CERN All but 5 are equipped with.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Construction and Installation of the CLIC Experimental Area
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Storms and Flooding across Aberdeenshire December 2012 Stephen Archer, Director of Infrastructure Services William Munro, Area Manager (Kincardine & Mearns)
TB Peter Glässel, Heidelberg1 TPC Progress.
Heat Exchange Ventilation Heat Exchange Ventilation.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
TDR Conventional Facilities Chapter 7. The site 1.Where the ESS property is located 2.How the property looks today and what kind of activities there is.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
Laboratory Procedures Chemical Management Emergency Laboratory Equipment m.inmagine.com CH5, CH6, CH10.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Installation of the T600 at Fermilab CSN2, September 22,
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
TC meeting P2 planning wks 3&4 A.Tauro
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ALICE 5 o’clock meeting Wk 51.
Pre-installation and Functional Tests
TPC Commissioning: DAQ, ECS aspects
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Renovation of the 45-year old PS magnets
CONTROL AND SERVICE TECHNOLOGY LTD
TPC Detector Control System
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
Heating, Ventilation and Air Conditioning HVAC
Presentation transcript:

TB Peter Glässel, Heidelberg1 TPC Status

TB Peter Glässel, Heidelberg2 Outline Last pre-commissioning items: OROC corner noise studied Optimum grounding scheme was determined 20 ground cables per sector exchanged by thicker ones Elevated noise in corners (was 5 adc cnts typ.) completely removed! Implemented in 2 days in a heroic effort of Luciano’s team FEE of all sectors retested in a dry run after closing covers TPC ‘travel-ready’ before X-mas Preparations in SXL2 Jan 4/5 (open clean room …) Transport to SX2 Jan 8/9 Jan 10: remove ventilation duct in shaft Transport to cavern right now TPC test drive to IP and back to parking till end Jan

TB Peter Glässel, Heidelberg3 The TPC leaves the clean room

TB Peter Glässel, Heidelberg4 ‘On the road’

TB Peter Glässel, Heidelberg5 TPC in SX2

TB Peter Glässel, Heidelberg6 Outlook: Installation in cavern Detailed planning for installation sequence in UX2 exists about 20 days needed for alignment and ‘test drive’ of TPC to IP until in ‘parking position’ Commissioning in situ after ITS installation (May 07) Starting on C-side (services available) Temporary services for gas sys on A-side

TB Peter Glässel, Heidelberg7 Spare

TB Peter Glässel, Heidelberg8 Transport to UX2 Preparations in UX2 ongoing Transport in week of 8 Jan, 07 Protective cover, thermal insulation & heating 4 day procedure clean room to UX2