ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 4-5 September 2004 ARIES Meeting at UCSD.

Slides:



Advertisements
Similar presentations
September 2008Mike Woodard Rational Unified Process Key Concepts Mike Woodard.
Advertisements

Info1409 De Montfort University Lecture 3 The Systems Development Life Cycle Systems Analysis & Design Academic Year 2008/9.
IS4799 Information Systems and Cybersecurity Capstone Project
EdTPA: Task 1 Support Module Mike Vitale Mark L’Esperance College of Education East Carolina University Introduction edTPA INTERDISCIPLINARY MODULE SERIES.
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 16 September 2004 ARIES Meeting at Madison, WI.
ARIES-CS Page 1 Low Cost Fabrication Approach for ARIES-CS Coil Structure L. Waganer The Boeing Company November 2005 ARIES Meeting at UCSD, San.
IS 421 Information Systems Management James Nowotarski 16 September 2002.
ARIES- Pathways, August 26-27, Atlanta, GA Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting August 2009 Georgia.
ARIES-General Page 1 Summary of Findings of Lehman Committee to Assess ITER Costing L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.
ARIES-CS Study Page 1 Discussion Of Compact Stellarator Reactor Requirements L. Waganer The Boeing Company 8-10 January 2003 ARIES Meeting at UCSD.
ARIES-Compact Stellarator Study 1 CS Power Core Materials and Fabrication Unit Cost Estimation ARIES-CS Project Meeting June 2004 University of Wisconsin,
ARIES Town Meeting On Physics of Compact Stellarators as Power Plants Farrokh Najmabadi and the ARIES Team September 15-16, 2005 Princeton Plasma Physics.
ARIES Meeting, UCSD L. M. Waganer, June 2006 An Approach for Low Cost Fabrication of the Coil Structure L. M. Waganer With Support from Kevin Slattery.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.
Introduction to ARA’s Proposal Resources Don Cole
INVENTORY ANALYZER FINAL PRESENTATION Lynette Jones Tamanna Patel Ann Van Dyne CIS 375 Fall
Phillip R. Rosenkrantz, Ed.D., P.E. Industrial & Manufacturing Engineering Department California State University, Pomona.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
Proposal in Detail – Part 2
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Effective Methods for Software and Systems Integration
Phase Four: Process Improvement. “The beauty of using PTR in the implementation of programs of study is its focus on using data to analyze problems and.
More on Data Mining KDnuggets Datanami ACM SIGKDD
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
9 Closing the Project Teaching Strategies
STUDENT LEARNING OBJECTIVES (SLOs) Orientation Module © Pennsylvania Department of Education.
System Analysis and Design
Systems Analysis and Design CHAPTER 1
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Developing Goals, Objectives, and Competencies
Overview Lifting the Curtain - Debriefings FAI Acquisition Seminar.
Production Cycle Objectives:  Identifying key phases for building up website  Understanding the major goals and activities of each production process,
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
SYSTEMS ANALYSIS AND DESIGN LIFE CYCLE
Request for Proposal (RFP)
Consip S.p.A. EULAB - EUropean Learning LABoratory 2006, Next Steps – Consip proposal Bruxelles, november 2005.
Project Estimation techniques Estimation of various project parameters is a basic project planning activity. The important project parameters that are.
John Maciejewski INPO I am John Maciejewski
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
ARIES- Pathways, October 25-26, 2010 Bethesda, MD Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting October 2010.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
ARIES- ACT, Sept, 2012, Bethesda, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting September 2012 Bethesda,
THE POSTMORTEM Chapter 10 Introduction to Team Software Process.
Unit 5 Seminar D ESCRIBING Y OUR L EARNING. Agenda Unit Objectives Bloom’s Taxonomy Learning Statements Questions.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
1 InSAR Project Information. 2 Outline Purpose Two components – SAR investigation, InSAR study SAR investigation: presentation only InSAR study: presentation.
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
Course Summary surveys.12.ppt CS 121 “Ordering Chaos” “Mike” Michael A. Erlinger.
02.1 WELCOME TO COMMON CORE HIGH SCHOOL MATHEMATICS LEADERSHIP SCHOOL YEAR SESSION 2 30 SEPTEMBER 2015 BUT WHAT IF MY YARD IS MORE OF A RECTANGLE?
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
MKT 450 Week 5 Learning Team Assignment Final International Marketing Plan Paper and Presentation To purchase this material click below link
Project Management Chapter 3.
MKT 421 GUIDE Enthusiastic Study / mkt421guide.com.
Internal Assessment IB Biology Year
ECE361 Engineering Practice
Description of Thin Liquid Wall Protection w/Porous Walls
EVALUATION OF V&V TOOLS
NTC 320Competitive Success/snaptutorial.com
Request for Proposal (RFP)
NTC 320 Teaching Effectively- snaptutorial.com
Reactor Building Concept Assessment
IS Project Management Extreme Project Management
New Plant Configuration Management Development and Implementation Process John Maciejewski INPO June 29, 2009 EN MRM Standardization Model.
System Analysis and Design:
Presentation transcript:

ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 4-5 September 2004 ARIES Meeting at UCSD

ARIES-CS Page 2 Background At the September 2004 meeting, I presented the costs for a set of materials for one of the candidate blanket/ maintenance schemes. Since then, I have expanded the cost basis to include the other configurations The cost basis is a combination of data from prior studies as well as new material quotes Also, I have prepared a trade study assessment tool for the proposed blanket concepts to help document the rationale for the selection into the next study phase

ARIES-CS Page 3 Candidate Power Core Concepts This is the complete list of concepts the team has defined and analyzed for Phase I. Cost data presented 9/2004

ARIES-CS Page 4 Unit Costs Data for Systems Code - First Three Candidate Systems - New ROM quote for Beryllium from Brush Wellman was provided, $220-$275/kg Refinement of natural Lithium cost is in work My prior estimate for Li17Pb83 90% enriched was in error, should be atom%. Revised number would be much lower Historical enriched lithium and LiPb estimates from MARS, UWTOR-M, and BCSS (circa ) suggest $16-20/kg for 90% enriched Li17Pb83 More

ARIES-CS Page 5 Unit Costs Data for Systems Code - Final Four Candidate Systems - I have a new quote for natural Lithium Orthosilicate ($44/kg) and need to convert it to 90% enriched Lithium Orthosilicate.

ARIES-CS Page 6 Unit Costs Data for Systems Code Link to Cost Database

ARIES-CS Page 7 Blanket Evaluation and Selection Process

ARIES-CS Page 8 We Should Reach Consensus On Key Blanket Attributes For Selection and Their Importance

ARIES-CS Page 9 This Trade Study Spreadsheet Illustrates the Evaluation Process - Data is for illustration only - The closeness of the scores suggest either a) the blankets are similar in performance b) the evaluation parameters/weightings are not indicative of the true discriminators, or c) the evaluation scores are wrong