FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011 Dean Hoffer Head, Office of Project Management Oversight.

Slides:



Advertisements
Similar presentations
Module 8: Government Required Reports
Advertisements

Contractor Assurance System AC Overview October 13, 2009.
RENEWAL & SUCCESSION CONSIDERATIONS Elisa A. Falco, Director of Education & Training.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
Project Cost Management Estimation Budget Cost Control
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
FRA’s Earned Value Management System Corrective Action Plan Implementation January12, 2010 Dean Hoffer and Mike Rhoades.
Project Management Session 7
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
Software Engineering Institute Capability Maturity Model (CMM)
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
EVMS Refresher and Update Training
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Computer System Analysis
Project Planning & Estimating – Are we there yet?
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Princeton University Plasma Physics Laboratory EVMS Certification Review EVMS Implementation on NSTX-U Steve Langish October 4 - 6, 2011.
FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 12-14, 2012 Dean Hoffer Head, Office of Project Management Oversight.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Management & Development of Complex Projects Course Code - 706
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Lab-Wide Earned Value Management System Project Core Team Kickoff Meeting April 16, 2008 Dean A. Hoffer.
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Earned Value as the Main Driver for Integrating Project Management Michael A. Hatfield PMP, CCC David J. Post PE.
The Project Plan Plan Your Work, then Work Your Plan
Lab-Wide Earned Value Management System Project Core Team Meeting November 12, 2008 Dean A. Hoffer/Elaine McCluskey.
Project Management Processes for a Project
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting December 11, 2008 Dean. Hoffer / Elaine McCluskey.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Implementing Program Management Standards at Duke Energy.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
FRA Earned Value Management System Overview May 11, 2009 Dean Hoffer/John Cooper/Suzanne Saxer.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
FRA Earned Value Management System Implementation Project October 9, 2008 Dean Hoffer / Elaine McCluskey.
Lab-Wide Earned Value Management System Project Oversight Committee Meeting September 11, 2008 Dean. Hoffer / Elaine McCluskey.
Long-Baseline Neutrino Facility LBNF Update: LBNF EVMS Implementation for CD-3a Elaine McCluskey, LBNF Project Manager Bob O’Sullivan, Project Controls.
Lab-Wide Earned Value Management System Project Core Team Meeting July 10, 2008 Dean. Hoffer / Elaine McCluskey.
FRA Earned Value Management System January 9, 2009 Dean Hoffer.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Project Management W. J. Foyt
Project Integration Management
SCD Grants & Contracts Policy & Procedure 670.
Project Management Process Groups
Linac Coherent Light Source (LCLS)
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

FRA’s Earned Value Management System Overview for Self Assessment Surveillance March 07-09, 2011 Dean Hoffer Head, Office of Project Management Oversight

07-Mar-2011FRA EVMS 2011 Internal Surveillance2 Outline EVMS History at the Lab FRA EVMS Documents FRA EVMS Process Non Costed Scientist Resources Training Summary

07-Mar-2011FRA EVMS 2011 Internal Surveillance3 Earned Value Management History EV has been performed at some level since the Main Injector Project in the 1990s. A standard Cost Processing Tool (Cobra) was selected and used to support EVM on the NuMI Project starting in Each project had their own EVMS process and procedures but used Cobra as the cost processer. 1 st Draft of Fermilab EVMS Description was generated in 2006, no implementing procedures at that time The FRA System Description and Implementing Procedures were first approved for use 17 October 2008 NOvA is the first project to implement the FRA EVMS and represents a typical project at Fermilab. NOvA’s implementation of the FRA System started in October 2008.

EVMS Certification Letter Received Jan 28, Mar-2011FRA EVMS 2011 Internal Surveillance4

07-Mar-2011FRA EVMS 2011 Internal Surveillance5 FRA EVMS Documents EVMS Documents –FRA Earned Value Management System Description –12.PM-001 Project WBS, OBS, RAM –12.PM-002 Control Accounts, Work Packages, Planning Packages –12.PM-003 Work Authorization –12.PM-004 Project Scheduling –12.PM-005 Cost Estimating –12.PM-006 Monthly Status Reporting –12.PM-007 Change Control –12.PM-008 EVMS Surveillance & Maintenance Ownership –Office of Project Management Oversight (OPMO) - responsible for maintaining the EVMS and maintaining interfaces with existing Fermilab business and management systems –Office of Quality and Best Practices (OQBP) - responsible for surveillance of the EVMS to ensure Lab adherence to the approved certified system

07-Mar-2011FRA EVMS 2011 Internal Surveillance6 Primary Project Management Tools Accounting Scheduling EV Cost Processor  Oracle's e-Business Suite - Project Costing Module - aka Project Accounting (PA)  Primavera P6 (new standard), Deltek Open Plan (NOvA) & Microsoft Project  Deltek Cobra

07-Mar-2011FRA EVMS 2011 Internal Surveillance7 FRA EVMS Consistent with ANSI/EIA-748A Standard for Earned Value Management Systems –Organization –Planning, scheduling and budgeting –Accounting considerations –Analysis and management reports –Revisions and data maintenance Crosswalk between ANSI/EIA748A and the System Description / Implementing Procedures is in Appendix A of System Description

07-Mar-2011FRA EVMS 2011 Internal Surveillance8 Organization Work Breakdown Structure developed with a product- oriented focus WBS Dictionary defines the scope of each WBS element Organizational Breakdown Structure is established to ensure the project’s scope of work can be efficiently managed Organization is likely to include collaborating institutions (universities and/or laboratories) within and outside of the USA Responsibility Assignment Matrix establishes the key control points and the managers of the entire project scope

07-Mar-2011FRA EVMS 2011 Internal Surveillance9 Planning, Scheduling and Budgeting A key part of baseline planning is establishing the project assumptions Schedule development is a iterative process among the CAM, Functional Managers, Project Controls and the Project Manager Work Packages and Planning Packages –We have not utilized Planning Packages in the past. The FRA System allows for both. We anticipate using Planning Packages on future projects. Risk Management is an integral part of the planning process and is key driver in establishing cost and schedule contingency

07-Mar-2011FRA EVMS 2011 Internal Surveillance10 Planning, Scheduling and Budgeting (continued) A consistent approach is used in developing and documenting cost estimates Work Authorization –External Work Authorization - DOE to FRA Difference between Line Item and Major Item of Equipment (MIE) Projects –Line items authorized by directives –MIE authorized by Financial Plan Guidance and achieving Critical Decisions NOvA is an MIE Project –Internal Work Authorization -Project Manager to CAMs

07-Mar-2011FRA EVMS 2011 Internal Surveillance11 Accounting Considerations Fermilab’s Oracle eBS (electronic Business Suite) used for actual costs Accruals done in Oracle eBS, except for the Cooperative Agreement Effort Reporting & Payroll used for Fermilab labor –Labor at other institutions appears as M&S to us, but is “labor” in the Open Plan schedule Indirects are applied in Oracle eBS –Rates set at least annually by CFO, adjusted at fiscal year end to reflect actual indirect costs at Fermilab, may be adjusted at interim dates –opportunities for pass-through rates –cap on indirects for large purchase orders at $500K (if criteria is met) Actual Costs are extracted from eBS and loaded into Cobra monthly –Cobra and eBS totals are reconciled

07-Mar-2011FRA EVMS 2011 Internal Surveillance12 Accounting Considerations (Actual Costs) Labor Effort reporting and Payroll data combine to generate labor costs Labor burdens (fringe, paid time off) applied in PA Materials & Services Invoicing often lags behind the receipt of goods/services The Oracle eBS Material Management System automatically accrues costs for items that have been “received” at Fermilab but not yet invoiced Service Accruals –Ability to record ‘receipts’ for services Minimizes artificial variances where earned value not offset by invoiced costs

Monthly Analysis and Management Reporting 07-Mar-2011FRA EVMS 2011 Internal Surveillance13

07-Mar-2011FRA EVMS 2011 Internal Surveillance14 Estimate to Complete/Estimate at Completion CAMs review ETC/EAC at control account level during monthly status cycle If felt to be inaccurate, CAMs propose ETC change to project manager Project manager assesses; if approved, information forwarded to Project Controls for input into forecast baseline and updating in Cobra.

Variance Thresholds (with hours) 07-Mar-2011FRA EVMS 2011 Internal Surveillance15

07-Mar-2011FRA EVMS 2011 Internal Surveillance16 Analysis and Management Reports (continued) FRA management monitors project performance including EV data from: –Project monthly reports –Monthly Project Management Group (PMG) meeting chaired by an Associate Director –FRA Director’s Reviews prior to DOE’s Office of Project Assessment review and Critical Decisions

07-Mar-2011FRA EVMS 2011 Internal Surveillance17 Project Management Group Meetings Monthly meetings to discuss project progress, pending work, and current/ potential issues Institutionalized practice for all projects covered by DOE O 413.3A (413.3B when incorporated into FRA contract) Members –Project Office –Divisions supplying project resources –Supporting Sections (i.e. ES&H, Procurement, etc) –Directorate (i.e. Associate Directors, OPMO) –DOE (Federal Project Director, Program Manager) Members have direct control over resources, so can take action if issues arise PMG also function as project change control board

07-Mar-2011FRA EVMS 2011 Internal Surveillance18 Revisions and Data Maintenance (Change Control Process) Change Control Thresholds are project specific and agreed on with DOE. High level thresholds (DOE’s) are identified in the Project Execution Plan (PEP). Lower level thresholds (FRA’s) are identified in the Project Management Plan (PMP)

07-Mar-2011FRA EVMS 2011 Internal Surveillance19 Non Costed Scientist Resources Implementing Procedure 12.PM-005 Cost Estimating –For scientific labor on DOE projects, the labor rate will be set to comply with “OHEP Guidance to Ensure Compliance with DOE O413.3A.” Per OHEP guidance, scientist labor is included in the project cost under certain circumstances The scientist hours are loaded into the schedule and the cost processor Scientist work is tracked by schedule task and milestone progress In general, work packages with non costed scientist labor also have costed labor, which allows EV to be measured on that work FRA is working with OHEP and others to address this in a consistent manner across labs

Processes for Collecting Uncosted Scientist Hours Worked 07-Mar-2011FRA EVMS 2011 Internal Surveillance20

EVMS Training Initial Training –Feb 6, 2009 Sr. Managers Class (17) –Dec 3-4, day Class (25) –Oct 26-27, day Class (19) –June 8-9, day Class (15) Refresher Training –Oct Refresher Session (3) –Oct Refresher Session (18) –Nov 30, 2009 Sr. Management Refresher Session (15) 07-Mar-2011FRA EVMS 2011 Internal Surveillance21

07-Mar-2011FRA EVMS 2011 Internal Surveillance22 Summary Documentation has been provided for you on the review website ahead of time Interviews have been arranged FRA is ready to support the Surveillance Team in the evaluation of our EVMS to –Verify the FRA EVMS is in compliance with ANSI/EIA-748A –Verify NOvA’s is in compliance with the FRA Certified EVMS Now John Cooper will give the overview of the NOvA Project and it’s implementation of the FRA EVMS