Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Degradation 28.

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Electronics Cooling MPE 635
Power Supply System John Joseph LBNL Spectrometer Solenoid Test Plan Review Feb 17 th 2012.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier Cooling Loop 20 September 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 3 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
Basic Electricity.
POWER SUPPILES LECTURE 20.
What are amps, watts, volts, and ohms?. Three most basic units in electricity: Voltage Current Resistance.
Daikin Australia Pty. Limited Ducted Split Systems 2011.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Electric Current & Electricity Calculations
MonoDrive & XT Constant Pressure Controller
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Calculating Electricity
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
AAE 450 – Spacecraft Design Sam Rodkey 1 Designing for Thermal Control Sam Rodkey February 14 th, 2005 Project Management Project Manager.
ELECTRICAL DESIGN GUIDELINE STEPS Maria C. Gonzalez.
Lesson Measuring and Calculating Electricity. Interest Approach § Have you or your parents ever been using several appliances in the kitchen and had a.
Stick computers in oil Spring 2009 Engr 45 By, Sergy Pretetsky & Jeff Hitchcock.
1 AGBell – EECT by Andrew G. Bell (260) Lecture 3.
A System Sensitivity Example Friday 19 Sept 2014 EE 401: Control Systems Analysis and Design Example #2:  Nominally, K = 5 and H =  Determine the.
FSS Review 28 th August Overview of what I’ve worked on… Stabilising voltage supply 0-200V with a Peltier Cooler Shield rubidium vapour cell from.
Power Definition Whiteboards. Power power = work time Derive all eqn using: V = W/q I = q/t R = V/I P = IV = I 2 R = V 2 R P: Power in W I: Current in.
U3e-L3 1.Why are the + and – symbols unnecessary when drawing the power source in an electric schematic? 2.A ______ circuit occurs when the positive terminal.
JAVA COOL - DC COOLER 1. √Background The Battery Heat: 2.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Using a Mulitmeter A digital multimeter is a test tool used to measure two or more electrical values—principally voltage (volts), current (amps) and resistance.
Date of download: 7/6/2016 Copyright © ASME. All rights reserved. From: Performance Analysis of a Combination System of Concentrating Photovoltaic/Thermal.
Current and Power Calculations Practice Math once again!!!
Report on Sigmaphi 75 kW RFQ Amplifier and Ferrite 75 kW Circulator Ralph Pasquinelli November 18, 2014.
UNIT III DC Choppers.
1. How much current flows if you connect a ohm resistor to a 12
Heater Construction and Maintenance
Electric Current Electric current – The net movement of electric charges in a single direction through a wire or conductor. Voltage difference – The force.
New Energy Efficient Data Center
DESIGN AND IMPLEMENTATION OF THERMO-ELECTRIC COOLER IN WATER DISPENSER
ECE Engineering Design Thermal Considerations
Real Rankine Cycle with Superheat
Basic Electrical Calculations
Electric Current.
Operations/Failure Analysis
Section 3.3 Measuring Energy Input and Output 1
Warm up A light needs 3 amps to produce light the resistance of the bulb is 1.5 ohms. How many batteries do you need if each battery is 1.5 volts? What.
Complete chart for 18 minutes
Electric Machine Design Course
FNAL Hybrid Testing Status
Presentation transcript:

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Degradation 28 February 2005

Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Peltier Failures Five peltier thermoelectric units have degraded over the past year. à February 2004 UCSB (overheated) à August 2004 UCSB(overheated) à February 2005 UCSB(unknown cause) FermiLab(unknown cause) CERN (gradual degradation) Units exhibited reduced thermal efficiency resulting in longer hybrid test cycle times à 65 min vs 40 min Replacing with new units restores short thermal cycle time.

Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Peltier Resistance Changes Degraded Peltier Units exhibit increased electrical resistance (4-12 amp range) à New Unit: 2.02 ohms à Old Unit (ser No 12): 3.00 ohms à Old FermiLab Unit: 5.0 ohms

Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Volt-Ampere Data

Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE

Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Heat Exchange Cooling Water Flow Rates à 4 L/m suggested by Supercool à 1.3 L/m current use Measured cooling water exchange rate à 6 deg C at 1.3 L/m at full power

Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Temp Rise Calculation Hybrid Test Chamber Heat Transfer Calculation à Q=mcΔT à Q= heat = P*t=400 watts*Time = 400 J/s*1 s à m=mass of water = 1.0 L/min*σ /60 s/min –= 1/60£*1000cc/£*1g/cc=16 g à c=Specific Heat of water = 4190 J/kgK à ΔT=[Tout-Tin] deg C à ΔT=Q/mc=400J/(4190J/kgK*.016kg)=5.9 deg C rise

Slide 8UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Peltier Failure Mode Degradation of thermoelectric element due to overheating à Nominal Input Power = (24v*12A)=290 watts à Current Usage = (24v*14a)= 336 watts (+16%) à Future Usage = (20v*10a)= 200 watts (-40%) It is now not possible to power up Peltier element without cooling water flow, even with a PC failure.

Slide 9UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Interlocks Current Peltier Interlocks à 80 deg C thermal switch on unit à Software has peltier current locked to water flow à Hardware flow interlock (recently installed)

Slide 10UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE New Sensor Interconnect with Peltier Hardware Interlock

Slide 11UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Plans Have degraded units refurbished rather than scrapped. à New unit $400 ea à Refurbished unit $120 parts and $40 labor Limit Maximum Power Levels à Voltage limit of 24 vdc à Current limit from 14 to 10 adc (17% reduction) –CERN has been using 10amp limit for last year –FERMILAB has agreed to 10 amp limit –UCSB should use this limit, Time=+1min on cycle