Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Contracting
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Construction Engineering 221 Cost Estimating and Bidding II.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
BHSestimator for Windows
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Chapter 10 Pricing Off Premise Events 1. Pricing The “Science” of Pricing – determining the actual costs of goods and labor The “Art” of Pricing – how.
35 Estimating Building Costs Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the process.
Chapter 2.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
1 The Cost Approach An introduction Wayne Foss, MBA, MAI Wayne Foss Appraisals, Inc.
Estimating CTC-415. Estimate Types Concept Detailed Definitive.
ESTIMATING By Laith Jacob.
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
©2008 Prentice Hall Business Publishing, Introduction to Management Accounting 14/e, Horngren/Sundem/Stratton/Schatzberg/Burgstahler Introduction.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Construction Engineering 221 Cost Estimating and Bidding.
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Setting the Right Price. Lesson Goals: Learn how to: –Calculate total costs –Calculate a profit margin –Use break-even analysis Identify the difference.
The Master Budget and Flexible Budgeting
Surety Basics 2013 Construction Opportunities Conference
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Construction Contracts and Project Delivery Methods
IE 475 Advanced Manufacturing Costing Techniques
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
King Fahd University of Petroleum & Minerals
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Chapter 2 Introduction to Construction Procedures
TYPES OF CONTRACTS.
9 Differential Analysis and Product Pricing Managerial Accounting 13e
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Contemporary Engineering Economics Contemporary Engineering Economics, 5 th edition, © 2010.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
Lesson 8 Pricing the Landscape Plan. Next Generation Science/Common Cores Standards Addressed! n CCSS.Math.Content.7.R P.A.3 Use proportional relationships.
Estimating CE-147 Week 2. Estimate Types Concept Detailed Definitive.
The Budgeting Process What is budgeting? What is budgeting? It is the coordinating the combined intelligence of an entire organization into a plan of action.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Chapter 13 Estimates for Remodeling Work
Target Cost –Price Determined by Market Target Selling Price- Cost Plus Pricing Time and Material Pricing Transfer Pricing *Negotiated *Cost-based.
Allowances, Unit Prices, and Alternates ACT
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Construction Management At Risk Process
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Principles of Architecture & Construction
Estimating Project Costs
Costs and Economics of Construction
The Cost Approach.
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Budgeting: Estimating Costs and Risks
Estimating – Overhead, Profit, Margins, & Markups workshop
10 The Cost Approach—Part I: Reproduction/Replacement Cost
ARCH 435 PROJECT MANAGEMENT
Estimating – PRICING Materials, Equipment, & Labor Workshop
Construction Contracts
C2 Follow the Capital Risks
Presentation transcript:

Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project: Roof Plan

The architect’s estimate includes the following:  Designed items  Specified items  Owner’s labor & materials The architect’s estimate does not include the following:  Professional fees  Land costs

Estimating Introduction As part of professional services architects and consultants prepare estimates of construction cost. These estimates are NOT guaranteed because of the many factors that are beyond their control, such as..

Estimating Manufacturers, suppliers & distributors influence the price of materials and equipment Unions influence labor costs Individual contractors determine how they will prepare their bids Market forces of supply & demand affect competition

Estimating Architect’s Responsibility  Current AIA agreement forces architect to design to the owner’s budget  Study the program and budget to see if they are in line and inform the owner  Provide the owner with a preliminary budget estimate based on area, volume or other unit cost SF cost for a building type High ceiling heights (gyms, auditoriums) use volume Cost per room (hotels) or per bed (unit cost)

Estimating SD Phase  Provide an estimate based on square footage  Advise owner of a contingency due to lack of detail 10% to 20% DD Phase  Provide an updated estimate based on material, finish and equipment selections CD Phase  Advise owner of necessary changes to earlier estimates; especially market conditions  Since CD’s take time to produce market conditions may change forcing owner’s to alter the program or the cost of labor/materials to change

Estimating Fixed Limit of Cost  Sometimes a owner will have a limit of construction spending  This sometimes requires alternates & unit pricing  The owner needs to relinquish control of scope and quality to the architect  If the bids exceed the limit.. Waive the limit and accept the bid Re-bid the project (market conditions) Abandon the project; terminate the architect Reduce scope, quality or both and re-bid

Types of Estimates Area / Volume Estimates Subsystem Estimates Detailed Estimates

Area / Volume Estimates Consult sources like Means, Dodge Reports, Building Design & Construction Performed usually during SD; contingency

Subsystem Estimates Performed when more detailed information becomes available. Subsystem method involves units or assemblies. This allows architects to make basic decisions about various building components on a square foot basis. Subsystems include Foundations, substructure, enclosure, roofing, etc

Detailed Estimates Requires detailed calculations of the amount of each type of material and labor necessary. Unit costs are applied to the calculated quantities to give direct cost Indirect costs are then added such as overhead (insurance, payroll taxes, administrative expenses, etc.), contractor profit and general conditions (permits, tests, etc.)

Factors Affecting Cost Legal and Administrative Requirements  Legal factors – liquidated damages  Owner requirements – bonds, insurance Project Complexity  Large buildings cost less per unit area than small ones  Compact buildings cost less that those with large footprints Materials and Methods  Special building types with specific requirements may be more costly than buildings with many typical details or have regular repetitive layouts

Project Location  Labor and material cost varies Construction Schedule  Short schedules may cost less  Short schedules may cost more Bidding  Competition

Assignments Make sure to have read Lessons 1-4 Quiz #3 Project: Roof Plan