SLAC Accelerator Department PEP-II Future Plans and Parameters 2004-2010 John T. Seeman PEP-II MAC Meeting December 13, 2004.

Slides:



Advertisements
Similar presentations
Accelerator Plans at SLAC John T. Seeman For the PEP-II Team e + e - Super-B-Factory Workshop Hawaii, USA January 19, 2004.
Advertisements

June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
12/13/2004 SN PEP-II MAC REVIEW 1 of 49 RECENT HOM CALCULATIONS HOM Dampers: Last Measurements and New Computer Designs Sasha Novokhatski PEP-II MAC Review.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Accelerator Summary 1/22/2004 K. Oide (KEK). Accelerator Session: PEP-II IR Upgrade M. Sullivan (SLAC) Super KEKB Optics & IR Y. Ohnishi(KEK) Super-PEP-II.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
Interaction Region Vacuum Chamber Upgrades Presented by: Scott DeBarger Contributors: D. Arnett, B. Bigornia, C. Carr, J. Langton, S. Metcalfe, D. Kharahk,
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Program Risks Risk Analysis Fallback Plans for the PEP-II B-Factory John T. Seeman DOE PEP-II Operations Review April 26, 2006.
SLAC Accelerator Department B-Factory Operations and Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
DA  NE Status Report P. Raimondi Scientific Committee Nov-2005.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
TDR and R&D Plans J. Seeman and M. Biagini For Super-B Staff.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
PEP-II Status John Seeman SLAC Particle and Particle-Astrophysics
John T. Seeman DOE PEP-II Operations Review April 26, 2006
Accelerator R&D for the Super-B Factory
SuperB Injection, RF stations, Vibration and Operations
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
The PEP-II Interaction e+e- Factories Workshop
Top-Up Injection for PEP-II and Applications to a Higgs Factory
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
U. Wienands, PEP-II Run Coordinator …for the PEP-II team
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Super-B Overview John Seeman Accelerator Systems Division
PEP-II Status and Plans e+e- Factories Workshop
SuperB RF and Other Components
LHC (SSC) Byung Yunn CASA.
Accelerator R&D Results from the B-factory
J. Seeman Assistant Director for PPA/LCLS
Summary of Washington DOE Review
Super-B Accelerator Overview
Coherent Synchrotron Radiation Study
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
The Lepton colliders Data Base
Presentation transcript:

SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004

SLAC Accelerator Department Contributors to PEP-II SLAC LBNL LLNL With help from: –IHEP, Beijing, China –BINP, Novosibirsk, Russia –INFN, Frascati, Italy –KEK, Tsukuba, Japan –CEA, Saclay, France –IN2P3, Paris, France –Caltech –BNL –Many people from the BaBar Collaboration –Visitors from CERN, DESY, Cornell, FNAL, …

SLAC Accelerator Department The PEP-II Team August 2004

SLAC Accelerator Department Beam Lines

SLAC Accelerator Department PEP-II arc section

SLAC Accelerator Department PEP-II HER RF cavities

SLAC Accelerator Department PEP-II Interaction Region Components near BaBar HER LER Collision point BaBar

SLAC Accelerator Department Other reviews since the last PEP-II MAC DOE Operations Review in June 2004 (Next DOE Operations Review May 2005) PEP-II End of Run Review August 2004

SLAC Accelerator Department Operational Improvements in FY2004 –Peak luminosity: 6.6  9.2  –Number of bunches: 1050  1588 bunches by-2 pattern (24 long mini-trains) with 2% ion gap –Parasitic collision effects seen but small(<5%) –Electron Cloud (ECI) effects are small (<2%) –I  current 1500  2450 mA (3 RF stations) –I  current 1050  1550 mA (8 RF stations)  y * of 12  11 mm –All data now taken in trickle charge mode Both beams: LER in November, HER in March

SLAC Accelerator Department PEP-II Performance Measure: Peak Luminosity

SLAC Accelerator Department Trickle injection at the B Factories Best shift, no trickle PEP-II: ~5 Hz continuous KEKB: at ~5-10 min intervals Best shift, LER only trickle Nov 2003 Best shift, double trickle Mar 2004 PEP-II Lumi HER current LER current

SLAC Accelerator Department Run 1 Run 2 Run 3 Run 4 CD4 Design Performance

SLAC Accelerator Department

SLAC Accelerator Department

Luminosity versus Crossing Angle Without parasitic crossing With parasitic crossing Kozanecki Sullivan Cai

SLAC Accelerator Department Beam-Beam Observed and Simulated Kozanecki Sullivan Cai Narsky Dynamic beta effects Beam-beam limit effects

SLAC Accelerator Department Response to April 2004 PEP-II MAC Questions Aborts per day: Down to 5 to 6 per day in July (McIntosh) IR upgrade reduced  y *: Designing for 7 mm, hope to get 8.5 mm (Sullivan, Biagini) IR vacuum work: Ongoing (Kurita, Langton, Pope, Sheng, Kharakh, Metcalfe, DeBarger, Sullivan) IR vacuum model: Some progress (Sullivan, Student, Gierman) Q1/Q2 bellows design: Nearly designed (Kurita, Langton, Novokhatski) Radial ion pump: Designed (Kurita, Wright) B1 magnet upgrade: Some studies done. No decision yet. Likely we will make no changes. (Ecklund, Sullivan) LER arc HOM TSP heating: Sources now known (collimators). Extra absorber to be installed (Novokhatski, Kulikov, Langton) “IR outgassing storms”: NEGs are heated by e+ beam (Sullivan, Ecklund, Metcalfe) RF engineering positions: Hired two new people. Tried to hire a third person. He turned us down. Now most hires are frozen due to 2005 budget.

SLAC Accelerator Department Summer 2004 PEP-II Improvements IR2 south forward shield wall: Backgrounds Add another new LER RF station: Higher current Add a HER RF station by splitting up a current 4 cavity station into two 2 cavity stations: Higher current Two new “Frascati” longitudinal kickers in LER: More stability New electrodes for transverse kickers: More stability Add fans to all HER bellows: Cool Higher Order Modes (HOMs) Alignment work (quadrupole rolls): Smaller vertical emittance New LER synchrotron light monitor: Smaller vertical emittance IR NEG pump HOM reduction: Better lifetime and backgrounds New Support Tube Chiller: Higher currents

SLAC Accelerator Department New IR2 Shield Wall for BaBar IFR

SLAC Accelerator Department Windings finished for ECI reduction

SLAC Accelerator Department LER NEG Test chamber

SLAC Accelerator Department Existing 3082 chamber BPM Chamber support Cooling bar NEG plenum NEG heater Quad extrusion

SLAC Accelerator Department Chamber shown inverted and plenum not shown for clarity SiC HOM absorber

SLAC Accelerator Department New Longitudinal Feedback Kicker Assembly

SLAC Accelerator Department New transverse kicker electrodes

SLAC Accelerator Department Luminosity Equation  y is the beam-beam parameter (~0.065)  I b is the bunch current (1 to 3 mA)  n is the number of bunches (~1600)  y * is the IP lattice optics function (vertical beta) (10 mm)  E is the beam energy (3.1 and 9 GeV)  Luminosity (10 33 cm -2 s -1 )

SLAC Accelerator Department Overall Parameters and Goals ParameterUnitsDesign Best in collision Future 2007 goal I+mA I-mA Number bunches y*y* mm yy , Bunch length mm Luminosityx Integrated lumi / day pb Over five times design! Over three times design Twice design

SLAC Accelerator Department Future luminosity increase factors ParameterPresentFutureLuminosity gain ratio Hardware and work needed LER current2450 mA4500 mATwo RF stations, new IR vacuum chambers HER current1550 mA2200 mA 1.61Two RF stations, new IR vacuum chambers y*y* 10.5 mm8.5 mm 1.24HER higher tunes, RF & power supplies work yy 0.06 L H L H 1.17Tune plane, coupling, & IR work, vertical emittance Parasitic  x 3.22 mm3.80 mm 1.08B1 magnet change (?) Total x 2.52

SLAC Accelerator Department PEP-II Future Luminosity Parameters xx yy xx yy nI x*x* y*y* Lumi xx yy Unitscmmmnm mA mm mm x1E33 LER now LER HER now HER

SLAC Accelerator Department HER Single-Bunch Synchroscan Data at 16 MV Holtzapple Fisher Novokhatski

SLAC Accelerator Department Comparing Single-Shot and Synchroscan Data LER e+

SLAC Accelerator Department How to shorten the HER-LER bunch lengths Summer 2004  2007: –LER current: 2450 mA  4500 mA –HER current: 1550 mA  2200 mA –LER RF: 3 stations  5 stations –LER RF: 6  10 cavities –HER RF: 8 stations  10 stations –LER total RF voltage: 3.8 MV  7.7 MV –HER total RF voltage: 15.8  18.7 MV –HER Je 2.0  2.2 –HER Momentum compaction:  LER bunch length: 11.8 mm  8.7 mm HER bunch length: 11.4 mm  8.4 mm

SLAC Accelerator Department PEP-II Future Downs Nominal plan: –Down July-December 2005 BaBar IFR, PEP-II support tube, many PEP-II vacuum chambers –Down Aug-Sept 2006 Last RF station LER-5 + last upgraded chambers –Down Aug-Sept 2007 maintenance and PPS –Down Aug-Sept 2008 maintenance and PPS –Down Aug-Sept 2009 maintenance and PPS Option 1: –Run through except for three week down for PPS certification (When: December 2005?) (+maybe PEP-II HER-10 RF Station) –Down August-December 2006 BaBar IFR and PEP-II support tube –Downs in same as above Option 2: –Run through except for three week down for PPS certification (When: December 2005?) (+maybe PEP-II HER-10 RF Station) –Down May-September 2006 BaBar IFR and PEP-II support tube –Downs in same as above

SLAC Accelerator Department VTX Bellows Cooling Installation: Key issue in the future!

SLAC Accelerator Department New Be bellows design SiC Cooling Langton

SLAC Accelerator Department Expected PEP-II Delivered Integrated Luminosity Delivered as of end of fiscal yearPEP-II Projection“Delta” FY /fb117/fb FY FY FY FY FY FY Five month down

SLAC Accelerator Department Future Maintenance Down Activities Install LER-5 RF station Install HER-10 RF station Remove support tube for SVT work to fix radial ion pump, add an IR BPM, new Be bellows Upgrade several high-power IR vacuum chambers (Q4, Q5, high power dump, Q2 bellows, LER abort window, straight section bellows …) HER lattice upgrade for lower momentum compaction and shorter bunches New RF comb filters New klystron linearizer New transverse digital feedback processors

SLAC Accelerator Department Detailed PEP-II upgrade list IR2 new Q2 chamberApr-05 Transverse digital feedbackApr-05 RF woofer linkMay-05 IR2 Q2 bellowsJul-05 ST Be bellowsJul-05 ST radial ion pumpJul-05 ST new BPMJul-05 IR2 HER Q4LJul-05 IR2 HER Q4RJul-05 IR2 HER Q5LJul-05 IR2 HER Q5RJul-05 IR2 HER Q4-5 bellowsJul-05 IR2 LER Q4-5LJul-05 IR2 LER Q4-5RJul-05 LER Abort spoilerJul-05 LER new high power bellowsJul-05 PEP-II tunnel network upgradeJul-05 RF station HER 10Aug-05 HER tune power supply upgradeAug-05 RF comb-2 projectDec-05 RF klystron linearizerJan-06 RF station LER 5May-06 IR HER HOM absorbersMay-06 IR LER HOM absorbersMay-06 IR HER new high power dumpMay-06 IR New HER frangible linksMay-06 IR new LER frangible linksMay-06 IR new HER 12 m transition May-06 IR new NEG chamber upgradesMay-06 New longitudinal feedback systemMay-06 ProjectTime early to install

SLAC Accelerator Department Conclusions PEP-II has reached a luminosity of 9.2  /cm 2 /s. PEP-II has delivered 710 pb -1 in one day. PEP-II has delivered 117 fb -1 in Run 4! PEP-II has delivered 256 fb -1 since May Trickle injection in both rings all of the time. Near term upgrades are going well. Planned upgrades toward 2.3  are on track. SLAC to decide on down schedule in the next few months.