Camera Workshop 16-19 September 2008 K. Fouts, K. Gilmore.

Slides:



Advertisements
Similar presentations
2 November 2009 Geant4 Tutorial Introduction J. Perl 1 SLAC Geant4 Tutorial 09 SLAC - Kavli Auditorium 2-6 November 2009 A five day hands-on course based.
Advertisements

What to Do During an Earthquake Stay as safe as possible during an earthquake. Be aware that some earthquakes are actually foreshocks and a larger earthquake.
Overview for Resource Room 203 Day 2 Part
NORTH CAMPUS EMERGENCY RESPONSE (DEFINED) EMERGENCY RESPONSE PROCEDURES SCENARIOS NORTH CAMPUS EMERGENCY RESPONSE (DEFINED) EMERGENCY RESPONSE PROCEDURES.
Emergency Planning. An emergency is any unplanned event that can cause death or significant injury to employees, customers, or the public. Emergencies.
Building 90 BET Meeting S.Synarski 6/11/14. Agenda Reminder: Sign up for Lab Alert (2 min) October Drop, Cover, Hold, Evacuate Drill: Oct 16, 10:16am.
Our Commitment to Safety. Founded on caring…our goal is zero! Safety is our #1 key priority. We all need to approach safety in the same way, with the.
The Large Synoptic Survey Telescope: Design and Performance SPIE Marseille, France June 24th, 2008 Kirk Gilmore LSST Camera Manager Stanford/SLAC/KIPAC.
1 LSST: Dark Energy Tony Tyson Director, LSST Project University of California, Davis Tony Tyson Director, LSST Project University of California, Davis.
July 7, 2008SLAC Annual Program ReviewPage 1 LSST Program and Development Status Kirk Gilmore SLAC/KIPAC/LSST.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Cryostat Assembly 17 September 2008 Martin Nordby, Rafe Schindler, Gary Guiffre, Rick Van Berg.
1 R Reliability Reporting (PU Code §2774.1) Workshop II, Day 1 California Public Utilities Commission May 26, 2015, 10:00 a.m. – 4:00 p.m. David.
14 May 2007 Geant4 Tutorial Introduction J. Perl 1 SLAC Geant4 Tutorial 07 SLAC - Redwood Room May 2007 A five day hands-on course based on Geant4.
You need to sign up for a GIS workshop. There are 4 workshops, all from 6:30-8:00 PM (extended for those participating in sports until 8:30PM): Tuesday.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
Integration and Test 14 October 2008 Martin Nordby.
I would like to share some knowledge about safety tips if earthquake occurs. Here is some earthquake safety tips that can help keep you and your family.
Emergency Preparedness Training 415 – 20 th Street.
Welcome to College of Engineering February 2015 Health and Safety Briefing.
Student Briefing College Of Engineering February 2011.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
Camera Overview LSST Camera Internal Review with Roger Smith, Cal Tech Kirk Gilmore October 14, 2008.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
THIS IS AN EARTHQUAKE… PROTECT YOURSELF!!! /broadcast/universal/ShakeOutDrillBr oadcastSoundEffects.mp3.
Key R&D Activities for the LSST Camera DOE HEP Program Review June 13, 2007 Kirk Gilmore (SLAC) LSST Camera Manager.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Please include the following safety slides. Add the next four slides to your presentation and review at the beginning of your workshop. NOTE: This page.
Emergency Procedures. Fire Drill AS A CLASS- 1) Walk out the class door 2) Proceed down stairs/hallway 3) Exit the building through designated door 4)
Earthquake Safety.  Stay outside  Stay away from trees, buildings, lights, and power lines  Crouch down and cover your head.
1 PLANNING CONSIDERATIONS FOR PERIOD OF TIME DURING AN EARTHQUAKE WELL IN ADVANCE: ALWAYS ASSESS YOUR SITUATION IDENTIFY HAZARDS. IDENTIFY SAFE PLACES.
Kirk Gilmore LSST Camera Scientist Stanford/SLAC/KIPAC
July 7, 2008SLAC Annual Program ReviewPage 1 LSST Program and Development Status Kirk Gilmore SLAC/KIPAC/LSST.
CPUC Public Agenda 3320 Thursday, August 29, 2013, 1:00 p.m. San Francisco, CA Commissioners: Michael R. Peevey Michel Peter Florio Catherine J.K. Sandoval.
Welcome to Our Virtual Tour. Student Lounge Second Floor.
E MERGENCY P ROCEDURES IN THE EVENT OF AN EMERGENCY: Call 911 and then alert NAMM show staff of the nature and location of the emergency. You may also.
Thursday, October 20, :20 a.m. Be prepared because this is earthquake country!
Welcome to Our Virtual Tour. Student Lounge Second Floor.
Earthquake Hazards. Predictions Based on 2 factors: – Earthquake history in the area (only narrows down to a decade or a few years) – Rate at which strain/stress.
EARTHQUAKES AN EARTHQUAKE IS…
Weather Emergency Room Classroom #1 Classroom #2 Classroom #3 Classroom #4 Classroom #5 Classroom #6 Classroom #7 Classroom #8 Fire / Emergency Evacuation.
Introductory Information. 8 July Geant4 Neutron mini-Workshop Welcome to Earthquake Country Be aware of exits in your building Speaker will indicate.
Emergency Preparedness for Leitch Elementary School
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
EMERGENCIES AND DISASTERS What to do in an emergency or disaster.
By Jayson Park. Goals Navigate to prototype Create a Reservation Navigate to Wednesday 11/9 Make a reservation at 4:00PM to 6:00 PM for room L1108 View.
Need Help With Trig graphs? Then this workshop is for YOU! Where: MS109 When: Wednesday March 16 th and Thursday March 17 th When: 11:30 – 12:30 All Math.
19-23 September th Geant4 Collaboration Meeting 1 SLAC September 2011 Welcome!
Camera PDR/CD1 Planning 19 September 2008
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
LCLS Injector Commissioning Workshop (ICW)
Emergency & Environmental Information
Because Technology Never Stops
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Because Technology Never Stops
Because Technology Never Stops
Because Technology Never Stops
Because Technology Never Stops
Because Technology Never Stops
Because Technology Never Stops
Because Technology Never Stops
Because Technology Never Stops
LSST Camera Internal Review
LSST DOE/NSF COMMISSIONING REVIEW
Integration and Test Organization Chart
Emergency Information
DOE Accelerator Safety Workshop 2018
Earthquake Cascadia College.
Presentation transcript:

Camera Workshop September 2008 K. Fouts, K. Gilmore

Emergency Information Be aware of exits in your building Speaker will indicate locations for this meeting Fire or other emergency evacuation Follow building residents out of building to the assembly area Earthquake Remain in building: Duck, cover, and hold position until shaking stops Evacuate building to assembly area outside (follow others) Stay away from windows, downed power lines In the event of an emergency Dial from a SLAC phone; or Dial 911 from your cellular phone Provide SLAC address (2575 Sand Hill Road, Menlo Park, CA; cross street Saga Lane) and your building/room number.

LSST Camera Systems Integration 3 Building Emergency Information You are here Dial For Emergency

LSST Camera Systems Integration 4 Camera Organizational Chart Camera Lead Scientist Kahn (SLAC) Systems Engineering Gilmore (act.) (SLAC) WBS 3.2 Project Control Price (SLAC) WBS 3.1 Electronics Oliver (Harvard) WBS Sensor/Raft Development Radeka/O’Connor (BNL) WBS Optics Olivier (LLNL) WBS Cryostat Assembly Schindler (SLAC) WBS Calibration Burke (SLAC) WBS Camera Body & Mechanisms Nordby (SLAC) WBS Camera Data Acq. & Control Schalk (UCSC) WBS Camera Integration & Test Planning Nordby (SLAC) WBS 3.6 Performance, Safety and Environmental Assurance (SLAC) WBS 3.3 / 3.4 Observatory Integ., Test & Commission Support (SLAC) WBS 3.7 Corner Raft WFS/Guider Olivier (LLNL) WBS Camera Utilities Nordby (SLAC) WBS Sensor,Elect, Mech. Dev. Antilogus (IN2P3) LPNHE LAL APC Camera Project Scientist Gilmore (SLAC) Camera Project Manager Fouts (SLAC) WBS 3.1

LSST Camera Systems Integration 5 Tuesday, September 16, Kavli Building, 3 rd Floor Conference Room 1. Welcome and Introduction (K. Fouts/K. Gilmore)8-8:15am Subsystem Presentations 2. Electronics (J. Oliver/R. Van Berg)8:15-10am 3. Sensor/Raft (P. O’Conner/C. Butehorn)10-12pm Lunch12-1pm 4. Optics/Filters (K. Gilmore)1-2pm 5. Camera Body and Mechanisms (M. Nordby)2-3pm 6. Calibration (D. Burke et al)3-5pm Wednesday, September 17 Kavli Building, 3 rd Floor Conference Room 1. Camera System Electronics (R. Van Berg)8-9am 2. Camera Control System Support for I&T (T. Schalk)9-10am 3. Data flow (T. Schalk, et al)10-11am Open11-12 am Lunch12-1pm Cryostat Presentation1-5pm 4. Raft-Grid Interface and Metrology (P. O’Connor, A. Rasmussen) 5. Cryostat Electrical Integration (R. Van Berg, J. Oliver) 6. Contamination Control in Cryostat (P. O’Connor, Kirk Arndt, R. Schindler) Workshop Agenda (1 of 2)

LSST Camera Systems Integration 6 Thursday, September 18 SLUO MeetingSLUO Meeting, Kavli Auditorium8-6:30pm Tour of Contamination Test Chambers On-campus2-4pm Friday, September 19 Kavli Building, 3 rd Floor Conference Room 1. Corner Raft Presentation (S. Olivier/K. Arndt)8-10am 2. Image Quality and Camera Requirements (K. Gilmore)10-11am 3. Plan for Internal Review (K. Gilmore )11-12pm Lunch12-1pm 4. PDR/CD-1 Plan (K. Fouts)1-2pm Workshop Agenda (2 of 2)