Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from.... 11 institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL,

Slides:



Advertisements
Similar presentations
IEKP - Universität Karlsruhe (TH) 1 Preliminary Pinhole Studies (not final) F. Hartmann IEKP - Universität Karlsruhe (TH) Creation of defined.
Advertisements

Frank Hartmann IEKP TEC Meeting July 03 Ring 6 mechanical Qualification In a nutshell: rel. precision agreement (Aa-Ka): 3-5µm (  rot.) abs precision.
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
Frank Hartmann Module Construction Meeting1 Analysis on TEC Expressline II modules Two different topics: Strip defects (3 modules) Global IV (2.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Sensor meetingF. Hartmann 1 Status report St & HPK plus add. Scratch tests. IEKP – University of Karlsruhe Frank Hartmann.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
Workshop on CMS irradiation sensor Qualification&Assurance 1 Final set of measurement for the irradiation quality assurance. What test do we need? EFFICIENT.
6/22/2015Tracker Week April 2002IEKP 1 Summary of IQC-workshop IEKP - Universität Karlsruhe (TH)
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
DPG 2001 Frank Hartmann (IEKP) P-irradiated-oxygenated Non-irradiated-oxygenated Non-irradiated-non-oxygenated P-irradiated-non-oxygenated sensors put.
First Proton Irradiation of CMS Sensors W. de Boer, A. Dierlamm, A. Furgeri, E. Grigoriev, F. Hartmann, F. Hauler, L. Jungermann, Ch. Piasecki.
CDF sensors processed on 6” wafers OUTLINE: zMaterial description zMasks layout zSensor performances zProcess related problems zConclusions DPG Frühjahrstagung.
Cost Until end 2000:negligible 2001:3 kDM per irrad  Problem –Cyclotron split in commercial and research part. Irradiation facility still a commercial.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
March 17, 2003 Catania, Meeting ST - CMS CMS Sensor Quality Frank Hartmann – University of Karlsruhe 1 Summary of Sensor Quality Tests List of Problems.
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
CMS Tracker Week, CERN, October Oct 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Full-size ATLAS Sensor Testing On behalf of the ATLAS R&D group Development of n-in-p Silicon Sensors for very high radiation environment Jan Bohm Institute.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Quality Test of L1 sensors HPK 10 sensors –Tested all, 6 sent to Fermilab – Test structures, HPK 133 L00 CDF ELMA 9 sensors –Tested 6 of 9.
Anna Macchiolo, Status of Process Qualification Centers, Sensor Meeting, 31st Oct 2001 Status of Process Qualification Centers Florence, Strasbourg, Vienna.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
CMS Week, CERN, June June 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status of Hamamatsu Silicon Sensors K. Hara (Univ of Tsukuba) Delivery leakage current at 150V & 350V number of defect channels wafer thickness & full.
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Sensors Frank Hartmann for the Sensor WG CMS Upgrade Days HPK submission (main current topic) Possible next submission 3D sensors for innermost.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Magnification showing pads and “bias ring” First Look at SiD Charge Division Sensors at SCIPP.
Zener Diode Circuits for Power Supply Designs Section 4.4.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Punch through protection and p-stop ion concentration in HPK strip mini-sensors Jan Bohm, Institute of Physics ASCR, Prague Peter Kodys, Pavel Novotny,
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association INSTITUT FÜR EXPERIMENTELLE KERNPHYSIK
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Static Surface Charges on Differently Passivated Silicon Strip Sensors Axel König, HEPHY11 th Trento Workshop, LPNHE Paris.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Influence of humidity on the IV characteristics A.Chilingarov Lancaster University ATLAS SCT Week CERN,
Karlsruhe probe equipment and QA proposals/expertise
Status Report on Bonding at Catania
Bonding web site, renovated
FNAL Production Experience
Hybrid & Module Testing Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Recent TOB Developments
FNAL Module Testing Status
Module Production Status in Florence
Module production in Italy
TEC Module Production Overview
The measurement set-up
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
Sensor probing (Summary)
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
Noise in TOB modules and sensor quality
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TEC module quality overview
Module Testing Status Week of 3/14-3/18.
IEKP - Universität Karlsruhe (TH)
Presentation transcript:

Frank Hartmann --- Karlsruhe 2 nd bond test 2nd bond test pieces received from institutes sent in their 2nbond sample Torino, Wien, Karlsruhe, FNAL, Bari, Padova, Strasburg, Santa Barbara, CERN, Florence, Zürich (Bonding machine 1 & 2)

Frank Hartmann --- Karlsruhe 2 nd bond test 2 nd bond test (pinholes due to bonding) Test procedure: 1.Measurement of ST (in KA) and HPK (in Wien) teststructures for IV and pinholes 2.Assembly 3.Bonding at all bonding centers 4.Retest of IV and pinholes (in KA) Since the DC pads are covered by bonds, we biased the sensor with –1V forward bias and measured the current on the AC (2ndbond Pad)  Significant increase of current at shorted dielectric

Frank Hartmann --- Karlsruhe 2 nd bond test Retest after bonding IV on HPK and ST DC current Vbias –1V on both sensors Try to identify the sensor with the measured ST sensors by their former pinhole measurements (No single pinhole on HPK teststructures) Only in case of additional pinholes (no.definite identificaton) we removed the middle bonds, and remeasured both sides to identify the sensor, where the pinhole happened.

Frank Hartmann --- Karlsruhe 2 nd bond test Known occurences Karlsruhe: bondhead crashed on one PA  Bonds missing: –FNAL: 1,57-66,81,86,94 –Padova: 1,91 (HPK-PA); 128 (ST-PA) –Strasburg: 1,2,29,43,127 (HPK-PA) FNAL: scratch on sensor at strip 82 PA only 127 strips  first bond often missing FNAL bonded sen-sen TWICE (on 2 AC pads)

Frank Hartmann --- Karlsruhe 2 nd bond test Results Unfortunately, we got NO reasonable results from the IV characteristics! –The ST structures came from a very early batch and also the HPK had much higher currents, and even low breakdown voltages for all pieces –We assume assembly (handling-dryness) problems. –Only the Santa Barbara piece (with 2 HPK structures) showed reasonable IV characteristics More important: Pinholes happend at bonding 

Frank Hartmann --- Karlsruhe 2 nd bond test Example measurement

Frank Hartmann --- Karlsruhe 2 nd bond test Result II We had a 100% match of pinholes before and after bonding for all institutes No single pinhole was created during 2 measurements, assembly and „bonding“. Gratulation to all bonding centers

Frank Hartmann --- Karlsruhe 2 nd bond test FNAL bonded sen-sen twice