Capital Budgeting Under Uncertainty

Slides:



Advertisements
Similar presentations
Theory Behind the Discounted Cash Flow approach
Advertisements

Cost of Capital Rate of return required by firm’s investors
Models and methods to estimate the appropriate r
Key Concepts & Skills Calculate & explain A firm’s cost of common equity capital A firm’s cost of preferred stock A firm’s cost of debt A firm’s overall.
Where Do We Stand? Earlier chapters on capital budgeting focused on the appropriate size and timing of cash flows. This chapter discusses the appropriate.
1 Risk, Return, and Capital Budgeting Chapter 12.
Capital Budgeting and Financial Planning
CHAPTER 18: CAPITAL BUDGETING WITH LEVERAGE
The Cost of Capital (Chapter 15) OVU-ADVANCE Managerial Finance D.B. Hamm, rev. Jan 2006.
Factor Model.
1 Capital Budgeting Overview  Capital Budgeting is the set of valuation techniques for real asset investment decisions.  Capital Budgeting Steps estimating.
CAPM and the capital budgeting
Chapter Outline The Cost of Capital: Introduction The Cost of Equity
CHAPTER 09 Cost of Capital
Hurdle Rates for Firms 04/15/08 Ch. 4.
CAPM and the capital budgeting
Risk, Return and Capital Budgeting For 9.220, Term 1, 2002/03 02_Lecture15.ppt Student Version.
Estimating Hurdle Rates. Cost of Capital To evaluate project, need estimates of cashflows, and also estimate of an appropriate hurdle rate (r). Hurdle.
15-0 Chapter 15: Outline The Cost of Capital: Some Preliminaries The Cost of Equity The Costs of Debt and Preferred Stock The Weighted Average Cost of.
J. K. Dietrich - GSBA 548 – MBA.PM Spring 2007 Risk and Investment Decisions April 23, 2007 (LA), or April 12, 2007 (OCC)
QDai for FEUNL Finanças November 7. QDai for FEUNL Topics covered  CAPM for cost of capital  Estimation of beta.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Cost of Capital.
Key Concepts and Skills
Capital Budgeting Under Uncertainty. The Cost of Capital and Capital Budgeting: Some Questions n Firms usually spend money on projects that are not risk.
Estimating the Discount Rate
Valuation and levered Betas
Why Cost of Capital Is Important
Weighted Average Cost of Capital
Cost of Capital Presented by: Coteng, Walter Malapitan, Jhe-anne Pagulayan, Jemaima Valdez, Jenya Dan.
Fundamentals of Corporate Finance, 2/e
Chapter 14 Cost of Capital
FIN 40153: Advanced Corporate Finance
Chapter 12 Cost of Capital 0. Why Cost of Capital is Important Return is commensurate with Risk – always (SML) The cost of capital gives an indication.
Risk, Cost of Capital, and Capital Budgeting. Valuing a Project When valuing a project you need two things: Initially you were given both (Unit.
(c) 2001 Contemporary Engineering Economics1 Discount Rate to be Used in Project Analysis ECON 320 Engineering Economics Mahmut.
Cost of Capital MF 807 Corporate Finance Professor Thomas Chemmanur.
Cost of capital. What types of long-term capital do firms use? Long-term debt Preferred stock Common equity Term loans Retained earnings.
Cost of Capital Chapter 14. Key Concepts and Skills Know how to determine a firm’s cost of equity capital Know how to determine a firm’s cost of debt.
Chapter 12 The Cost of Capital Topics  Thinking through Frankenstein Co.’s cost of capital  Weighted Average Cost of Capital: WACC  Measuring Capital.
McGraw-Hill/IrwinCopyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Risk, Cost of Capital, and Capital Budgeting Chapter 12.
Key Concepts and Skills
FIN 614: Financial Management Larry Schrenk, Instructor.
© Prentice Hall, Corporate Financial Management 3e Emery Finnerty Stowe Cost of Capital.
Cost of Capital Chapter 11. Chapter 11 - Outline Weighted Average Cost of Capital Cost of Debt Cost of Preferred Stock Cost of Common Equity: – Retained.
Ch 9. The Cost of Capital. Goals: To understand cost of capitals or hurdle rate To understand how to estimate cost components To understand how to estimate.
Exercises in Capital Structure and Cost of Capital
1 Capital Budgeting Overview  Capital Budgeting is the set of valuation techniques for real asset investment decisions.  Capital Budgeting Steps estimating.
FIN 819: lecture 4 Risk, Returns, CAPM and the Cost of Capital Where does the discount rate come from?
TOPIC: WEIGHTED AVERAGE COST OF CAPITAL (WACC) Firm Value should be Maximized when WACC is Minimized Factors that impact on WACC include operating profitability,
0 Chapter 15 Cost of Capital. 1 Chapter Outline The Cost of Capital: Some Preliminaries The Cost of Equity The Costs of Debt and Preferred Stock The Weighted.
1 CHAPTER 10 The Cost of Capital. 2 Topics in Chapter Cost of Capital Components Debt Preferred Common Equity WACC.
Chapter 12 Cost of Capital!. Key Concepts and Skills Know how to determine a firm’s cost of equity capital Know how to determine a firm’s cost of debt.
Slide 1 Cost of Capital, and Capital Budgeting Text: Chapter 12.
Chapter 14 Cost of Capital McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 12 Estimating the Cost of Capital. Copyright ©2014 Pearson Education, Inc. All rights reserved The Equity Cost of Capital The Capital.
Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin Cost of Capital Cost of Capital - The return the firm’s.
1 The Cost of Capital Corporate Finance Dr. A. DeMaskey.
3- 1 Outline 3: Risk, Return, and Cost of Capital 3.1 Rates of Return 3.2 Measuring Risk 3.3 Risk & Diversification 3.4 Measuring Market Risk 3.5 Portfolio.
FIN 350: lecture 9 Risk, returns and WACC CAPM and the capital budgeting.
1 Ch 7: Project Analysis Under Risk Incorporating Risk Into Project Analysis Through Adjustments To The Discount Rate, and By The Certainty Equivalent.
F9 Financial Management. 2 Section F: Cost of Capital Designed to give you the knowledge and application of: F1. Sources of finance and their short-term.
Estimating the Value of ACME 1. Steps in a valuation Estimate cost of capital (WACC) – Debt – Equity Project financial statements and FCF Calculate horizon.
RISK, COST OF CAPITAL, AND CAPITAL BUDGETING This topic applies the concept of NPV to risky cash flows. NPV = C o + Σ C t ¯ /(1+r) t r = discount rate.
Cost of Capital Chapter Fourteen. Prof. Oh, KUMBA 2010Ch14-1 Corporate Finance Key Concepts and Skills  Know how to determine a firm’s cost of equity.
BUS 401 Week 4 Quiz Check this A+ tutorial guideline at NEW/BUS-401-Week-4-Quiz 1.) Investors will make an investment.
Key Concepts and Skills
Chapter 13 Learning Objectives
VANDELAY INDUSTRIES WACC EXAMPLE.
Weighted Average Cost of Capital (Ch )
Presentation transcript:

Capital Budgeting Under Uncertainty

The Cost of Capital and Capital Budgeting: Some Questions A company can get cash for investment by retaining earnings or selling either debt or equity. Does it make any difference how the firm raises money in determining the cost of capital? What is the proper discount rate when the firm uses both debt and equity? How do we find the proper discount rate when projects are risky? How do we do capital budgeting when the project has different risk and/or a different capital structure than does the firm as a whole?

Capital Budgeting Complexities Our analysis of risk and return, as summarized by the SML, can be extended to capital budgeting decisions. If the firm has no debt in its capital structure and the project being evaluated has the same (beta) systematic risk as the firm’s existing projects, then the expected return on the firm’s equity is the appropriate discount rate for the project. If the project beta differs from the firm beta then use the project beta. Why? How can this be estimated?

Project vs. Firm Risk (All Equity Firm):Why? Expected Return project cost of capital SML • firm cost of capital • Rf Beta Firm Beta Project Beta

Project Beta: How do you estimate it? In evaluating a project, you want to know the total risk of that “enterprise.” The easiest way is if it falls neatly into an industry in which there are publicly traded firms. In this case find the enterprise or asset betas of a set of firms in the industry that most closely resemble the project, and take an average of these betas. In the case of a new project that looks nothing like existing enterprises it gets squishy. Evaluate the cyclicality of its revenues and its operating leverage. Do a comparable firm analysis.

Cost of Capital for a Project Ralph’s firm is an all equity financed firm in the fast food industry. Ralph is considering a project in the Bio-tech industry. The 10 year bond rate is currently 4%. The historical average risk premium is 7%. The beta of Ralph’s firm = 1.1. The beta of Genzyme (GENZ) an all equity firm = 0.61. Cost of capital for the new investment is correctly calculated as: E(RP) = 4% + 0.61 (7%) = 8.27% Not as E(RP) = 4% + 1.1 (7%) = 11.7%

Capital Budgeting Complexities If the firm has debt in the capital structure, adjustments are required. Interest is tax deductible. Either allow for this in cash flows or alter the discount rate to reflect the presence of debt. Financial leverage increases equity betas relative to the firm’s beta. Which of these is estimated by the regression technique we discussed earlier?

The Weighted Average Cost Of Capital (WACC) When a firm has both debt and equity in its capital structure, the most frequent recommendation is to base the project discount rate on the weighted average cost of capital (WACC or rWACC): where S is the market value of the firm’s stock B is the market value of the firm’s debt rS is the required rate of return on the firm’s stock rB is the required before tax rate of return on the firm’s debt TC is the firm’s marginal tax rate

Why Is There A Tax Adjustment For Debt? Consider a firm that has earnings before interest and taxes each period of $1000. Under scenario A, the firm is all equity financed; under scenario B, the firm has issued debt with a face value of $1000 and a coupon rate of 10%. The firm has a 40% marginal tax rate.

Why Is There A Tax Adjustment For Debt? In A, the firm can distribute a total of $600 to stakeholders. In B, the firm can distribute $100+$540=$640 to stakeholders. The tax shield from debt gives the firm $40 more to distribute. This tax shield lowers the effective interest payment on debt to $60=$100(1-0.4) or a 6% coupon rate.

Calculation of the Cost of Debt (rDebt) The before tax cost of debt can be calculated as the yield to maturity on the firm’s existing debt. Can also be found from bond ratings of companies with comparable financial structure. Wall Street Journal Moody’s The after tax cost of debt is the before tax cost of debt multiplied by (1-Tc), where Tc is the firm’s effective marginal tax rate.

Calculation of the cost of equity (rEquity) The cost of equity can be calculated using the Security Market Line (SML) from the CAPM. rS= Rf+ b (E[RM]- Rf) Some choices: Use of long-term versus short-term rate for Rf. Practitioners usually favor the long-term rate. Make sure you adjust the risk-premium accordingly. Beta. Regression or beta book. Need to adjust the equity beta for different capital structures.

WACC Example WACC = .40(14.5%) + .60(9%)(1-.40) = 9.04%. Gamma airlines is financed with 60% debt and 40% equity. Currently the YTM on Gamma bonds is 9%, and Gamma has estimated its cost of equity to be 14.5%. Gamma’s corporate tax rate is 40%. What is Gamma’s WACC? WACC = .40(14.5%) + .60(9%)(1-.40) = 9.04%. Issues: What if the risk of the project at hand differs from that of Gamma’s past projects? What if risk of this project is similar to that of Delta Airlines’ projects, and the 14.5% cost of equity figure was actually obtained for Delta. However, Delta’s capital structure differs from Gamma’s.

Betas and Leverage We noted earlier that the beta of a portfolio is the average of the component betas. We can think of the firm’s assets as a portfolio of the debt and equity claims. From these insights it follows that: Where S is the market value of the stock (equity), B is the market value of debt (borrowings), and Tc is the tax rate. Think of the “balance sheet” representation of the firm.

Beta Under Different Capital Structures In this analysis it is often assumed that the debt has a zero beta (sometimes a big simplification). Then: When taxes are considered, the understanding remains the same, but the math becomes more complicated. The result is (see sec 17.7 in RWJ):

Beta Under Different Capital Structures Example: Gamma airlines’ equity beta is observed to be 1.31. It’s equity is worth 25.0 million while its debt is worth 15.0 million and its tax rate is 40%. What is the beta of the underlying assets?

Points to Notice Regarding Betas and Leverage If the firm uses no debt (B=0) the equity beta and the asset beta are equal. If the firm uses debt, the equity beta is higher than the asset beta (since debt is first in line, equity is riskier than the overall firm): implies: (1) equity holders will require a higher rate of return, (2) when surrogate firms are used to estimate beta, adjustments for differing capital structures are needed.

Why does Beta increase with financial leverage? Leverage increases the volatility of the equity cash flow: Numerical Illustration: Outcome Good Bad % Ch. EBI 125 100 -20% Interest 50 50 0% Income 75 50 -33.3%

How to use the set of tools developed here to select discount rates for capital budgeting. The cost of capital for each project should reflect the systematic risk of that project and the capital structure of the firm (or division) taking the project. So, Select a publicly traded company that is comparable in terms of the risk of the underlying business. Obtain the unlevered (asset) beta of the comparable. Obtain the corresponding project equity beta, reflecting your firm’s capital structure. Obtain the cost of equity and cost of debt for this project at your firm. Calculate the WACC for the project and perform NPV analysis.

Example: “Un-levering” and “Re-levering”  To the process of evaluating Gamma Airlines you find: Delta Airlines has an Equity beta of 1.215, Tc = 40%. Delta uses 70% equity and 30% debt financing. Find the asset beta of Delta: This will reflect the risk of the assets of Gamma Air. Now find the equity beta of Gamma Air If Delta’s and Gamma’s capital structures are different, their costs of equity will be different: 18.85% not 14.5%.

Summary: Risk, Return, and Discount Rates Some risk can be diversified, some cannot. ‘Beta’ coefficients measure systematic risk. We expect systematic risk to earn a risk premium in equilibrium but that diversifiable risk will not. The CAPM (and particularly the SML) is a simple model capturing important insights regarding risk and diversification. Discount rates for projects should reflect the systematic risk of the project (not necessarily that of the firm) and the capital structure of the firm or division (not necessarily the financing of the project itself).