The MIS and Performance Measurement Systems of the Industry Energy R&D Program Dennis Rank Dennis Rank and Associates Presentation to the RTD Interest.

Slides:



Advertisements
Similar presentations
Accounting – Critical Tool in Business and Government In Business: Accrual Basis Emphasis on the earning of revenues and the incurring of expenses. Primary.
Advertisements

EESE O&E Committee Update & Next Steps May 14, 2010.
OAS Accountability Is In Everything We Do OAS DEFINES AND IMPLEMENTS ACCOUNTABILITY ACROSS ALL ORGANIZATION LEVELS THROUGHOUT THE COMPLETE ACQUISITION.
Planning for Program Delivery Presented By: Michael A. Haithcock, P.E. Assistant State Program Delivery Engineer October 27, 2009.
MICROSOFT OFFICE ACCESS 2007.
Quicken 2011 New Features Presented by: Simon Hutchinson.
An Overview of the Energy Education Program Monroe County CSC November 3, 2009.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Upskilling Ontarians for Maximum Energy Efficiency Building Capability for a Conservation Economy November 7, 2013 Bryan Young, Manager Channel Strategy.
An Introduction to Spend Analysis and Spend Management Optimizing Your Spend.
90 th Annual Meeting & Exposition April 3 – 6, 2011 Memphis, Tennessee An Introduction to Spend Analysis and Spend Management Optimizing your spend.
Track, View, Manage and Report on all aspects of the Recruitment Process… with ease!
Leveraging Purchasing Technologies and Strategic Initiatives to Produce ROI The Next Level Conference March 3, 2003.
The Reality of the Struggle to Align the Business with I.T. Rosana F. Chaidez Large Company Technology Networking Conference June 17th – 18th, 2008.
PRME Seminar “Responsible Management of GHG Emissions” Fri 14 October 2011 Gujji Muthuswamy Department of Management Faculty of Business and Economics.
SPA Control A systematic process to manage the SPA process JIGSAW SYSTEMS INC.
Managing Projects
By Katharine Morton SOFTWARE AND EQUIPMENT FOR REHAB PLACES.
SPAWAR HQ (General Fund) Navy ERP Implementation Lessons Learned – Comptroller View.
Kirklees Warm Zone key impacts and learning Phil Webber Head of Environment Unit Strategic Investment and Regeneration.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Electronic Permitting Initiative Update Alan Doniger, Energistics CTO 2 nd Annual Standards Summit & Reception 6 November 2007 Houston, Texas.
GETTING HELP FOR LARGE ENERGY EFFICIENCY IMPROVEMENTS AT A SMALL COLLEGE Anne Duncan, Environmental Sustainability Coordinator Terry Rowe, Sales Team Leader.
Energy Efficiency in the Clean Power Plan Opportunities for Virginia Mary Shoemaker Research Assistant Spring 2015 VAEEC Meeting May 11, 2015.
April 29, 2015 Lucinda Smith Climate Action Plan Process.
Trends in supplier selection In the past: supplier selection should be purchasing’s domain Now: necessary to bring together organizational resources outside.
Point of Sale Collection, cleanup and data analysis.
IT Project Management Cheng Li, Ph.D. August 2003.
Presented By: Matt Bell Partner, Viridian. Buildings and the Environment Buildings account for 36% of greenhouse gas emissions Buildings account for 72%
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Statewide AT Program Leaders Symposium Using Data and the Program Review Manual for Systematic Program Improvement May 17, 2011 Sara Sack--Kansas.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Powered by An overview of the WorkSource Integrated Technology Solution for WEC.
Purpose: These slides are for use with customers by the Microsoft Dynamics NAV sales force and partners. How to use: Add these slides to the core customer.
Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010.
OSEP National Early Childhood Conference December 2007.
Public sector sustainability reporting – Lessons learnt Ruth Tipping Senior Team leader (Sustainable Development) Date 9 September 2011.
September 22, 2010 Strategic Aerospace and Defence Initiative (SADI) Program Overview.
Impact of Deploying Labor Planning at Hi-Tech 04:00 pm– 04:30 pm Presenter: Michael Gurick (Hi-Tech)
. Integrity  Innovative  Collaborative  Professional  Responsive  Respectful  Ethical  Transparent  Customer first!  Effective & efficient Building.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
RISE Grant: Proposal Writing Workshop UAF RISE Board February 21, 2014.
A worked example for Denmark using the proposed EU Directive rules Senior Adviser Peter Bach Danish Energy Authority EU and eceee expert seminar on measurement.
One Step Ahead: Using a Finance Plan for Regional Water System Operations Deena Hood Central Wyoming Regional Water System Carol Malesky Integrated Utilities.
The Initiative For School Empowerment and Excellence (i.4.see) “Empowering teachers, administrators, policy makers, and parents to increase student achievement.”
Scientific Research and Experimental Development (SR&ED) Program: Should You Take Part? Douglas Clay SR&ED Program Calgary, Alberta.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
Program Name or Ancillary Texteere.energy.gov Community Energy Strategic Planning Sarah Zaleski March 30, 2012 INSERT SEVERAL PROGRAM-RELATED PICTURES.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Equipment Management Series (To perform rental of equipment and fixed asset management)
U.S. National Communication: Projections and Effects of Policies and Measures United States Delegation UNFCCC Workshop on National Communications from.
Efficiently Completing and Updating Campus Greenhouse Gas Inventory University of Wisconsin-Stout Applied Research Center (ARC) Wisconsin’s Polytechnic.
LINCPlus Overview Complete binding preparation module includes features such as security, titles database, reports and job costing options. Integrated.
Performance Assessment and Monitoring of Energy Efficiency Programs Mallika Nanduri Natural Resources Canada May 12 th, 2005.
1 Louisiana: Our Energy Future 2009 American Recovery & Reinvestment Act.
Supporting Manufacturing Leadership Through Sustainability E3: Economy, Energy, and Environment.
ALANA WILLIAMS WHAT IS REVENUE CYCLE MANAGEMENT?
Administrative Cost Savings through Invoice Verification.
Lighting Rebate Portal ®. ® Purpose is to provide incentives to customers during change outs or new construction 2.
Business and Systems Aligned. Business Empowered. TM Three Approaches to Measuring the Economic Impacts of RTD Toronto, ON. October 29, 2005 Presentation.
ATTACHEDAPPS CONFIDENTIAL Powerfully simple tools to retain, manage and grow SMB customers. Client Messaging for Partners.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
People Inc. from P&A Software
Migrating Oracle Forms Using Oracle Application Express
People Inc. from P&A Software
Michael E. Canes USAEE/IAEE North American Conference
Residential Retrofit: At the Nexus of National Energy Policy
Presentation transcript:

The MIS and Performance Measurement Systems of the Industry Energy R&D Program Dennis Rank Dennis Rank and Associates Presentation to the RTD Interest Group American Evaluation Association Conference Portland, Oregon November 2, 2006

Dennis Rank and Associates2 The IERD A program of Natural Resources Canada (NRCan). A program of Natural Resources Canada (NRCan). Funding to industry for R&D to improve energy efficiency & reduce greenhouse gas (GHG) emissions. Funding to industry for R&D to improve energy efficiency & reduce greenhouse gas (GHG) emissions. Projects cost-shared w/ clients; IERD supplies 35%, on average. Projects cost-shared w/ clients; IERD supplies 35%, on average. Conditionally repayable, depending on risk, commercial status, size of impact, etc. Conditionally repayable, depending on risk, commercial status, size of impact, etc. Currently ~70 projects; two-thirds repayable. Currently ~70 projects; two-thirds repayable.

Dennis Rank and Associates3 Relevance Desirable to track “downstream” socio-economic (S- E) impacts, but few programs succeed. Desirable to track “downstream” socio-economic (S- E) impacts, but few programs succeed. Even “bottom-up” project data are often incomplete or inaccurate, & databases often in very poor shape. IERD uses integrated management information system (MIS) and performance measurement (PM) system. Even “bottom-up” project data are often incomplete or inaccurate, & databases often in very poor shape. IERD uses integrated management information system (MIS) and performance measurement (PM) system. Highly-used and highly-useful, both for management & for tracking S-E impacts. Highly-used and highly-useful, both for management & for tracking S-E impacts. What lessons can be learned from IERD? What lessons can be learned from IERD?

Dennis Rank and Associates4 System Overview M/soft Access, linked to Outlook & Excel. M/soft Access, linked to Outlook & Excel. Very complete suite of administrative & management tools. Very complete suite of administrative & management tools. Goals: (1) meet or exceed reporting requirements; (2) be user-friendly; (3) minimize resources required. Goals: (1) meet or exceed reporting requirements; (2) be user-friendly; (3) minimize resources required. Designed & maintained by full-time database manager. Designed & maintained by full-time database manager.

Dennis Rank and Associates5 Project Data Modules Tracking: basic data on contract, $, contact info., milestones, etc. Tracking: basic data on contract, $, contact info., milestones, etc. Finance & Admin: claim & payment history Finance & Admin: claim & payment history Management: project reports, action items, estimated & actual energy & GHG impacts Management: project reports, action items, estimated & actual energy & GHG impacts Project manager: routine & custom reports Project manager: routine & custom reports

Dennis Rank and Associates6 Operational Aspects Many functions automated or semi-automated; e.g., labels, reminders to clients, reminders to project officers, tracking action items, “red flags”, “policeman’s reports”, etc. Many functions automated or semi-automated; e.g., labels, reminders to clients, reminders to project officers, tracking action items, “red flags”, “policeman’s reports”, etc. Project officers can set up & edit project info. Project officers can set up & edit project info. Database manager responsible for data accuracy & completeness, training, upgrading, routine & custom reports, etc. Database manager responsible for data accuracy & completeness, training, upgrading, routine & custom reports, etc. Program manager ensures system up to date, complete, fully utilized. Program manager ensures system up to date, complete, fully utilized.

Dennis Rank and Associates7 Impacts Tracked Direct energy savings. Direct energy savings. Direct GHG (NOx, CO 2 ) reductions. Direct GHG (NOx, CO 2 ) reductions. Some indirect, knock-on, spin-off benefits (e.g., other uses of the technology not originally intended). Some indirect, knock-on, spin-off benefits (e.g., other uses of the technology not originally intended). Sales revenue and/or cost savings. Sales revenue and/or cost savings. FTEs on project, and/or created long-term. FTEs on project, and/or created long-term. Investment to commercialize. Investment to commercialize.

Dennis Rank and Associates8 Impact Tracking Process For each project, annually & since inception. For each project, annually & since inception. Also at program roll-up level. Also at program roll-up level. Heavy involvement of project officers (e.g., site visits) to obtain & verify information. Heavy involvement of project officers (e.g., site visits) to obtain & verify information.

Dennis Rank and Associates9 Unusual Features Only really useful PM system the author has encountered in 20+ years’ S&T experience. Only really useful PM system the author has encountered in 20+ years’ S&T experience. Data complete, accurate, & up to date – estimates upgraded each year (e.g., w/ actuals on take-up, energy efficiency). Data complete, accurate, & up to date – estimates upgraded each year (e.g., w/ actuals on take-up, energy efficiency). Very high buy-in by project officers. Very high buy-in by project officers. Tracks impacts up to 10 years after project complete (for repayables). Tracks impacts up to 10 years after project complete (for repayables). System in very good running order, reports (even custom ones) easy to produce. System in very good running order, reports (even custom ones) easy to produce.

Dennis Rank and Associates10 Economic Analysis Usefulness Benefits: energy (by type) & GHG data. Benefits: energy (by type) & GHG data. Net Benefits: costs of R&D, operating, job creation, etc. Net Benefits: costs of R&D, operating, job creation, etc. Net Present Value: timing of benefits & costs, program costs. Net Present Value: timing of benefits & costs, program costs. Estimation assumptions captured. Estimation assumptions captured. Easy to identify “big winners” (or losers). Easy to identify “big winners” (or losers). Contact info. makes it easy to obtain more detailed information from clients. Contact info. makes it easy to obtain more detailed information from clients.

Dennis Rank and Associates11 Why Does it Work? System design: System design: On-site expert database designer & manager; On-site expert database designer & manager; First run as prototype, gradually enhanced & upgraded w/ feedback from project officers; First run as prototype, gradually enhanced & upgraded w/ feedback from project officers; Development costs low, as d/base manager has other admin duties; Development costs low, as d/base manager has other admin duties; As opposed to using outside IT help for “one- off” design (but then designer leaves) As opposed to using outside IT help for “one- off” design (but then designer leaves)

Dennis Rank and Associates12 Why Does it Work? Cont’d System operation: System operation: Strong leadership by program manager ensures system is used. Strong leadership by program manager ensures system is used. Oversight, multiple checks, verification ensures data are complete & accurate. Oversight, multiple checks, verification ensures data are complete & accurate. System works well, bug-free. System works well, bug-free. Only useful functions, saving project officers time (~90% savings compared to “by hand”). Only useful functions, saving project officers time (~90% savings compared to “by hand”). Clients for repayables obliged to provide data, & real sanctions if they don’t. Clients for repayables obliged to provide data, & real sanctions if they don’t.

Dennis Rank and Associates13 Transportable? Yes: Yes: Applied R&D programs; Applied R&D programs; R&D done jointly w/ partners (long-term links, “carrots & sticks”); R&D done jointly w/ partners (long-term links, “carrots & sticks”); Non-R&D programs w/ long-term links to clients; Non-R&D programs w/ long-term links to clients; BUT, need on-site database designer & manager. BUT, need on-site database designer & manager.

Dennis Rank and Associates14 Transportable? Cont’d Less so: Less so: Strategic programs (too long a time lag to impacts); Strategic programs (too long a time lag to impacts); Non-repayable grants programs (fewer “carrots or sticks”); Non-repayable grants programs (fewer “carrots or sticks”); Decentralized programs (system training & access more difficult); Decentralized programs (system training & access more difficult); “Sunset” programs (not worth the effort, & no one around to maintain). “Sunset” programs (not worth the effort, & no one around to maintain).

Dennis Rank and Associates15 Conclusions Integrated MIS/PM system is complete, effective, & efficient. Integrated MIS/PM system is complete, effective, & efficient. Highly-used because actually helpful to project officers, expert d/base manager on-site, & strong leadership. Highly-used because actually helpful to project officers, expert d/base manager on-site, & strong leadership. Highly-useful for tracking impacts because data complete, accurate, up-to-date, & easy to verify. Highly-useful for tracking impacts because data complete, accurate, up-to-date, & easy to verify. Transportable to many S&T programs of interest, especially long-running ones w/ applied focus. Transportable to many S&T programs of interest, especially long-running ones w/ applied focus.

Dennis Rank and Associates16 For More Information Dennis Rank Dennis Rank