Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK.

Slides:



Advertisements
Similar presentations
Takashi Matsushita Imperial College T. Matsushita 1 Station 5 status.
Advertisements

MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance 16/05/06.
Takashi Matsushita Imperial College T. Matsushita 1 Station five – assembly/QA.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Takashi Matsushita Imperial College T. Matsushita 1 Station 5.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Assurance; status 18/05/06.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
QA for the Fibre Tracker 28 October 2004Brunel QA for fibre bundling Dr Paul Kyberd and Dr Peter Hobson School of Engineering & Design Brunel University,
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
Tracking Detectors Working Group MICE Collaboration Meeting March 30, 2004 A. Bross.
T. Matsushita 1 Station 5 as of 28 Nov 2006 All planes bundled All planes connectorised All planes glued Fibres potted Ready for cut/polishing Shift takers;
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
Tracker QA P. Kyberd, M. Takahashi 1 Quality Assurance for SciFi Tracker (Brunel, FNAL, IC, Osaka) A status report: A procedure for ensuring the quality.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Takashi Matsushita Imperial College T. Matsushita 1 Full tracker station assembly/QA, schedule.
MICE Tracker Update Alan Bross NFMCC Friday Meeting November 10, 2006.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
21/07/20061 Preparation of Station Acceptance Rig.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
1 MICE Status UKNF Meeting 3rd May 2006 Malcolm Ellis.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Takashi Matsushita On behalf of IC/Brunel team Imperial College T. Matsushita 1 Preparation for station five Construction/bundling/connectorisation.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
1M. Ellis - NFMCC - 31st January 2007 MICE Tracker.
MICE Phase 1 Koji Yoshimura KEK June
Takashi Matsushita Imperial College T. Matsushita 1 Station5 Assembly/QA status, schedule.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 KEK test-beam software progress Malcolm Ellis MICE Video Conference 4 th May 2005.
Takashi Matsushita Imperial College T. Matsushita 1 Quality Control of Station Assembly.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Tracker Summary Alan Bross MICE CM17 CERN February 25, 2007.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
M. Takahashi, 21 January, 2016 Station Acceptance (SA)
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Transmission test for waveguide Hideyuki Sakamoto Tracker Phone Meeting, 25 th May,2006 Contents Method Measured luminosity Results and next step.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
T. Matsushita 1 News Ribbons - i Inspection at IC All five ribbons have production date Two ribbons have mold ID + production ID (e.g. mold4#1) One ribbon.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
T. Matsushita 1 QA: Fibre Counting Software 1. Take CCD image of comb/connector 2. Cut noise 3. Find bundles: Nearest Neighbour Clustering, merge clusters.
Requirements for the Software Group (and agreed actions)
HF Test station at P5 A.Mestvirishvili.
Aron Fish Imperial College Mice Video Conference 01/02/06
Preparation for Station Acceptance Test
Tracker Station QA Acceptance Test Rig Status
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

Takashi Matsushita Imperial College T. Matsushita 1 Station5 in UK

T. Matsushita 2 Mechanical Station connectors Go no-go gauge made at Imperial 40 station connectors for station5 outsourced All passed go no-go gauge check No more hall misalignment Waveguide connectors Go no-go gauge being prepared at Liverpool Was in long queue at Imperial workshop Will be outsourced to the same firm as soon as the gauge is ready Carbon-fibre frame Waiting in queue at Imperial workshop Engineering drawings will be posted on Web During the meeting

T. Matsushita 3 QA – bundling/connectorisation Purpose Ensure each bundle has correct seven fibres No more/no less fibres in a bundle No swap of fibres across bundles and no skip Ensure each bundle goes to correct hole of optical connector No more nightmare of channel decoding Methods Visual scan of skipped fibre in the middle of bundles Take picture of fibre bundle to count number of fibres in a bundle Take movie of fibre scan with UV LED to check sequence of fibres

T. Matsushita 4 QA – bundling/connectorisation Setup LED: 20 mW, peak = 405nm 86 hours illumination shows no noticeable damage on fibre ~20 minutes 100W Mercury arc illumination did damage fibre; yellow fluorescence instead of green Spectrophotometer shows a major increase in absorption in the blue region (~400 – 450nm) Translation stage LED/optics Doublet layer CCD Beam spot image by CCD50 micron x ~4mm(not this size on fibres) Side view Front view

T. Matsushita 5 QA – bundling/connectorisation First we make bundle of seven fibres; single read-out channel “comb” is used for bundling and QA procedure Bundling and QA takes 2 hours for a connector; 20 hours per view QA image for one connector worth of bundles comb Comb with bunldes in grooves

T. Matsushita 6 QA – bundling/connectorisation Second we thread bundle through each hole of connector Fibre radius guide is used for connectorisation “bridge” is used for QA Connectorisation/QA takes 1 hour per connector, 10 hour per view bridge Fibre radius guide Bridge with connectors QA image for one connector

T. Matsushita 7 QA – fibre counting CCD image is analysed by software. The software notifies an operator if there is any failure/suspicious bundles

T. Matsushita 8 QA – sequence check X (pixel) Software to check fibre sequence is under optimisation with mirrored and production pitch doublet-layer Y(pixel) Trace of centre of illumination

T. Matsushita 9 Station acceptance test set-up Assembled stations will be tested using a high energy photon source and the full MICE readout chain Quality check:uniformity along the fibre, dead channels Characterisation:light yield, calibration of channels Components Scanning system in a light tight box X-Y micro-positioning stage source: Co-57, 122keV photon source 111MBq activity (O(10 2 ) Hz of triggerable events) Readout + DAQ system waveguides: will be prepared using new connectors VLPC with cryogenics (slow control via 1553): cryostat, cold-head, water-cooled compressor, chiller electronics: AFEIIt (self-trigger at 3 p.e. threshold), VLSB DAQ via SBS: Excel based software

T. Matsushita 10 Station acceptance test set-up Scanning system being prepared at IC Readout components and firmware being tested/developed (US) Estimated time needed for the test per station ~ 5 days Plan to be ready by the time the assembly of station 5 completes (station 4 used at the KEK testbeam will be tested first) back-up plan is to do a cosmic ray test for station 5 at FNAL if possible

T. Matsushita 11 Station5 assembly status Bundling/Connectorisation/QA tried with newly delivered doublet-layer Bundling/QA of View X for station5 starts on Monday Estimated time needed to complete each view is one week Estimated completion date sometime in November Depends on readiness of carbon-fibre station frame