TPAC1.1 Jamie Crooks. TPAC1.1 (honest) First Batch Four boards – Received 10 at last meeting from Paul – Tested before bonding 9 boards operated correctly,

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
The PHENIX/EMCal(PbSc)/BB/TOF Laser User Instructions Sean Stoll (rev. 12/8/03)
Movement. Fixed Movement setLocation (x, y) Makes the crab move to a fixed cell x,y Relative Movement The functions: getX() getY() Fetch the x and y coordinate.
Recent activities Jamie C 23 rd April Threshold scans in reset Concept –Perform a threshold scan while holding different parts of pixel in reset.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
From the NXT top menu Connect desired hardware as indicated Enter a command in the box indicated from the menu provided Repeat for all 5 boxes.
Tera-Pixel APS for CALICE Progress meeting, 31 st August 2007 Jamie Crooks, Microelectronics/RAL.
Terra-Pixel APS for CALICE Progress meeting 10 th Nov 2005 Jamie Crooks, Microelectronics/RAL.
TPAC1.2 JC / 1 st July2009 Results from Barnaby Levin (summer student) 1.
TPAC update JC/31 st march TPAC1.2 Submitted – 2 nd March 2009 Lot started – 22 nd March 2009 Due date – 7 th May 2009.
Tera-Pixel APS for CALICE Progress meeting, 17 th September 2007 Jamie Crooks, Microelectronics/RAL.
TPAC1.2 Results Jamie Crooks 1 st June Status TPAC1.2 received WAFERSEPISUBSTRATEDPWDICED QTY 312STDYES75 312STDNO75 312HI RESYES75 318HI RESYES75.
ASIC1 progress Jamie Crooks, Feb 08. Bonding Problems: Resolved Smaller bonding wedge + revised programShorts to seal ring discovered under bonds.
E102 LAB Temperature Control of Heated Block. Temperature Controller Specifications Design, simulate and test a control system for temperature control.
Bug Session Two. Session description In this session the use of algorithms is reinforced to help pupils plan out what they will need to program on their.
1 QED In Vivo USB Input Output Box configuration This tutorial contains a number of instructions embedded in a great deal of explanation. Procedures that.
Embedded Programming and Robotics
LabView Users Group Meeting June 20 th, 2006 Process Control Using Compact Field Point/Labview Real-time Michael Tockstein Microelectronics Technology.
MEDIPIX3 TESTING STATUS R. Ballabriga and X. Llopart.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Performance of SPIROC chips in SKIROC mode
TPAC progress Jamie C 29 th July TPAC1.1 Status Submitted 17 th –Some minor DRC errors found at foundry –Corrected/waived Re-Submitted 23 rd July.
1 of 19 09/09/2013 FE-I4B IBL wafer probing results FE-I4 testing meeting 09 September 2013 Marlon Barbero, David-Leon Pohl Introduction Cut definitions.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Quantasep Software Screen Shots. Easy Manual Operation.
TPAC1.1 Progress JC: Dec 8 th. Laser No further investigation of odd scans on V1.1 De-ionizing filter needs replacing – On order… Bulb needs replacing.
TPAC1.1 Testing JC/Feb 6th. Laser Scan: Test Pixel Test pixels were mounted specially in centre of pcb hole 2um spot 4um steps 50 measurements/pt  Before:
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
1 Summer Project 2008: Calibration of interferometer end point measurement errors Week 2.
Preparation of Module Assembly and Stringtest Haridas, Heinz, Marge One possibility for an assembly and test line? Preparation of a full string test –aim.
DESIGN CONSIDERATIONS FOR CLICPIX2 AND STATUS REPORT ON THE TSV PROJECT Pierpaolo Valerio 1.
J. Crooks STFC Rutherford Appleton Laboratory
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
ClicPix ideas and a first specification draft P. Valerio.
21 Sep 2009Paul Dauncey1 Status of Imperial tasks Paul Dauncey.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
PIXEL SCANS. Measuring Data Measure last point before graphs cuts off at 1/10³. Measure last point before graphs cuts off at 1/10³. For spread of data,
ILD/ECAL MEETING 2014, 東京大学, JAPAN
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
Terra-Pixel APS for CALICE Progress meeting 10 th Nov 2005 Jamie Crooks, Microelectronics/RAL.
CdTe prototype detector testing Anja Schubert The University of Melbourne 9 May 2011 Updates.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Pressure Measurement and Calibration for Process Instrumentation
USBPix Readout System using FE-I4/A Chip Status Update: ToT calibration and Finalization of Tuning Procedure Jimin Kim and Austin Piehl Department of Physics.
EUTelescope Testbeam Analysis: Summer 2014
Digital readout architecture for Velopix
Textbook Detection System With Radio-Frequency Identification
TPAC1.0 Jamie Crooks.
Testing The JCOP Framework
T3MAPS Summer Final Report
SILVACO simulations & clean room measurements
Setup for measurements with SCT128 in Ljubljana: SCTA128VG chip
UML Activity Diagram Documents the Flow the of Program
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
USBPix Readout System using FE-I4/A chip Status Update: Finalization of Threshold Tuning and Minor updates Jimin Kim and Austin Piehl Department of Physics.
Malwarebytes Updating Automatically
Malwarebytes Signature Issues
UML Activity Diagram Documents the Flow the of Program
Paul Dauncey, Imperial College London
Imperial laser system and analysis
TPAC status JC/Jan2010.
Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM)
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
Presentation transcript:

TPAC1.1 Jamie Crooks

TPAC1.1 (honest)

First Batch Four boards – Received 10 at last meeting from Paul – Tested before bonding 9 boards operated correctly, testing… – Operating current – Board ID – PCB temperature – Probed voltages at all power jumpers – DAC references initial value and read/write 1 board showed no response from one of the DAC banks – Returned to IC for investigation Four chips (12u epi, with DPW) Three had a power-ground short! One had sensible power consumption – Most likely a bonding problem – New bond program in use for the larger bond pads – Inspection under microscope shows no obviuos evidence as before, but some occasional material deposits on scribe lane – Bond program will be modified and a chip reworked to test

Very First Tests (#32) Power on – Sensible current – Including J1 fitted  promising for the VDD2V5dig bug SensorLoadV1.1 – See bit errors in columns 24  71 – Almost certainly marginal timing on clock edges through up-rated inverter Monostable test structure – Working correctly – Shows that I12IOUTBIAS bug fixed

TPAC1.0 Jamie Crooks On behalf of Barnaby Levin & Michael Lynch

Summer Students Bulk pixel scans – Perl scripts automate… “runStart” commands Movement of X/Y stage Laser parameters – Root programs automate Function fitting to threshold scans Data plotting Analog test-pixel scans – Labview automates Acquisition of measurements from LeCroy scope Movement of X/Y stage Laser parameters – Root programs automate Data plotting Laser reliability Fully documented on “Spider Wiki” – Results – Flow charts – Software documentation – Source code

Test pixel scans 2x2um laser 2um steps Two runs – Something crashed – Laser intensity different after restart Hence the different peaks! – Will repeat This sensor Non-DPW sensor 5um EPI sensor

Laser uniformity If laser is turned off/on… If connection between labview and laser is broken/remade… Over long periods (weekend)… 1: Stop Any Software Running The Laser 2: Turn Laser Off At Key 3: Wait For Short Period 4: Turn Laser On At Key 5: Wait For Short Period 6: Fire Laser From Control Box With Desired Settings For Short Period 7: Stop Firing 8: Start Labview, (Will not connect first time) 9: Restart Labview (Software should now be working) 10: Fire Laser From Computer 11: Wait For a Short Period 12: Take Measurements 1: Stop Any Software Running The Laser 2: Turn Laser Off At Key 3: Wait For Short Period 4: Turn Laser On At Key 5: Wait For Short Period 6: Fire Laser From Control Box With Desired Settings For Short Period 7: Stop Firing 8: Start Labview, (Will not connect first time) 9: Fire Laser From Control Box With Desired Settings For Short Period 10: Stop Firing 11: Restart Labview (Software should now be working) 12: Fire Laser From Computer 13: Wait For a Short Period 14: Take Measurements Some improvement made by manually firing the laser before re-connecting with labview Needs more understanding (/fixing?) Any absolute calibration method must eliminate non-uniformity of this kind