Paul Emma Injector/BC1 Commissioning April 20, 2006 1 Injector/BC1 Commissioning (Dec. 1, ’06 through Aug. 1, ‘07) P. Emma LCLS.

Slides:



Advertisements
Similar presentations
G. Travish FAC Meeting 28OCT05 The LCLS BC1 Bunch Length Monitor System Eric Bong 1 Mike Dunning 2 Paul Emma 1 Patrick Krejcik.
Advertisements

Joe Frisch LCLS FAC Oct. 30, Linac/BC2 Commissioning (Dec through Sep., 2008) J. Frisch, et al. LCLS FAC Meeting.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
P. Emma LCLS FAC 12 Oct Comments from LCLS FAC Meeting (April 2004): J. Roßbach:“How do you detect weak FEL power when the.
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Juhao Wu LCLS FAC 7 Apr Dark Current, Beam Loss, and Collimation in the LCLS J. Wu, D. Dowell, P. Emma, C. Limborg, J. Schmerge,
Hamid Shoaee High Level Physics 20 April 2006 High Level Physics Applications Update on Plans, New Directions Fairley,
Paul Emma, et al. LCLS FAC May 13, LCLS Commissioning: Results & Plans P. Emma, for the LCLS Commissioning Team LCLS FAC.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
P. Emma FAC Meeting 27 Oct Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
LCLS Linac Long Lead Procurement Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
New 135-MeV injector energy requires minor changes to linac operating point…
James Welch October 29, 2007 Injector Commissioning Injector Commissioning Results presentated to the Facilities Advisory Committee,
Diane Fairley High Level October 24-28, 2005 High Level Physics Applications LCLS Week / FAC October 24-28, 2005.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Comments from LCLS FAC Meeting (April 2004): J. Rößbach:“How do you detect weak FEL power when the gain is very low (few hundred)?” K. Robinson:“Can you.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
P. Emma, SLACICFA XFEL July 29, 2004 Electron Bunch Measurements with a Transverse RF Deflector P. Emma ICFA XFEL 2004 Workshop July 29, 2004 ICFA.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Organization & Integration with the rest of the lab, Accelerator.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
Low Emittance RF Gun Developments for PAL-XFEL
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team Rick Iverson 2-Nov-2011 for the LCLS Commissioning Team.
Henrik Loos LCLS 6 February 2009 SLAC National Accelerator Laboratory High Level Physics Applications for LCLS Commissioning.
Injector Accelerator Readiness Review, 10/31/06 D. Schultz 1 Readiness of Commissioning Procedures Personnel & Hardware David Schultz LCLS e - -beams Systems.
David H. Dowell and Friends SLAC National Accelerator Laboratory David H. Dowell and Friends SLAC National Accelerator Laboratory The LCLS Gun ICFA Beam.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
LCLS Control Group FAC – 06 Installation October 27/28, Plans for 2006 Installation October 27, 2005 Installation.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
Operation and Upgrades of the LCLS J. Frisch 1,R. Akre 1, J. Arthur 1, R. Bionta 2, C. Bostedt 1, J. Bozek 1, A. Brachmann 1, P. Bucksbaum 1, R. Coffee.
BC2 Commissioning Parameters
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
LCLS Commissioning Parameters
LCLS Commissioning Parameters
Injector/BC1 Commissioning (Jan. 2, 2007 through Aug. 31, 2007) P
LCLS Commissioning Parameters
Linac/BC1 Commissioning P
Electron Beam Systems ETC and Methodology
Magnet Controls K. Luchini
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Commissioning P. Emma, et al
High Level Physics Applications for LCLS Commissioning
Linac Physics, Diagnostics, and Commissioning Strategy P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
LCLS Injector Commissioning P
LCLS Global Controls Overview August 10, 2004
LCLS Commissioning Parameters
Injector/BC1 Commissioning (Jan through Aug. 2007) P. Emma, et al
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
LCLS e- Beams System Overview
Controls Overview B. Dalesio
Physics Update P. Emma FAC Meeting October 27, 2005 LCLS.
Presentation transcript:

Paul Emma Injector/BC1 Commissioning April 20, Injector/BC1 Commissioning (Dec. 1, ’06 through Aug. 1, ‘07) P. Emma LCLS FAC Meeting Accelerator Systems Breakout April 20, 2006 LCLS

Paul Emma Injector/BC1 Commissioning April 20, LCLS Accelerator Schematic and Time Frames SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0° BC1 L  6 m R 56   39 mm BC2 L  22 m R 56   25 mm DL2 L =275 m R 56  0 DL1 L  12 m R 56  0 undulator L =130 m 6 MeV  z  0.83 mm    0.05 % 135 MeV  z  0.83 mm    0.10 % 250 MeV  z  0.19 mm    1.6 % 4.30 GeV  z  mm    0.71 % 13.6 GeV  z  mm    0.01 % Linac-X L =0.6 m  rf =  21-1 b,c,d...existing linac L0-a,b rfgun 21-3b24-6d X 25-1a30-8c Commission in Jan Commission in Jan. 2008

Paul Emma Injector/BC1 Commissioning April 20, Machine Commissioning Plans Schedule developed in MS-Project One file/manager per system Link to milestones and events in Master file Injector-BC1 Dec.‘06 BC2 Dec.‘07Dec.‘05Sep.‘07 Aug.‘06 install install Mar.‘08 LTU-und.

Paul Emma Injector/BC1 Commissioning April 20,

Paul Emma Injector/BC1 Commissioning April 20, Injector Through BC1 Commissioning  x,y and slice EEEE EEEE RF deflector no laser-heater

Paul Emma Injector/BC1 Commissioning April 20, Injector Through BC1 Commissioning (2)  x,y EEEE  E  slice  y stopper relative bunch length monitors X-band RF BC1

Paul Emma Injector/BC1 Commissioning April 20, Many Measurement Simulations Done Linac-1 RF phase scan (X-band off, BC1 bends at 295 MeV) set phase to  25˚  0.5˚ 20-  m res. BC1 BPM L1 RF phase Linac-1 new rfgun 21-1b21-1d X = meas. sim. = calc. = y distribution = actual DL1 slice-emit on WS02 Slice Emittance Measurement L1-Linac RF Phasing

Paul Emma Injector/BC1 Commissioning April 20, Also available: P. Emma, P. Krejcik, C. Limborg, J. Schmerge, et al. LCLS Drive-Laser Commissioning 8-Hour Cycle (5 days/week, 8/1/06 to 12/1/06, 16 total weeks) DAY SHIFT (8:00-16:00) W. White, J. Castro, D. Dowell, S. Gilevich, H. Loos, S. Peng (as needed) DAY SHIFT (8:00-16:00) W. White, J. Castro, D. Dowell, S. Gilevich, H. Loos, S. Peng (as needed) SWING SHIFT (16:00-24:00) (none) (none) OWL SHIFT (0:00-8:00) (none) (none) (see W. White)

Paul Emma Injector/BC1 Commissioning April 20, DAY SHIFT (8:00-16:00) 1 lead physicist, 1 physicist, 1 controls eng., 1 sys. engineer, 1 LCLS operator, 1 laser operator DAY SHIFT (8:00-16:00) 1 lead physicist, 1 physicist, 1 controls eng., 1 sys. engineer, 1 LCLS operator, 1 laser operator LCLS Injector/BC1 Commissioning 24-Hour Cycle (7 days/week, 12/1/06 to 8/1/07, 32 total weeks) SWING SHIFT (16:00-24:00) 1 lead physicist, 1 physicist, 1 LCLS operator, 1 laser operator SWING SHIFT (16:00-24:00) 1 lead physicist, 1 physicist, 1 LCLS operator, 1 laser operator OWL SHIFT (0:00-8:00) 1 LCLS operator, 1 operator, 1 laser operator OWL SHIFT (0:00-8:00) 1 LCLS operator, 1 operator, 1 laser operator

Paul Emma Injector/BC1 Commissioning April 20, Shift Leaders (initially) (1 per D/S shift) 1.Dave Dowell 2.Paul Emma 3.Patrick Krejcik 4.Cecile Limborg 5.Bill White Operations (1 per DAY & SWING shift and 2 per OWL) Personnel Available for LCLS Injector/BC1 Commissioning LCLS Physicists (1 per D/S shift) 1.Sasha Gilevich 2.Henrik Loos 3.Heinz-Dieter Nuhn 4.John Schmerge 5.Dave Schultz 6.Jim Welch 7.Juhao Wu Controls eng. (1 per DAY shift) 1.Stephanie Allison 2.Mike Zelazney 3.Debbie Rogind 4.Diane Fairley 5.Stephen Norem 6.Arturo Alarcon 7.Doug Murray 8.Sergei Chevtsov 9.Karen Kotturi 10.Kristi Luchini 11.Sheng Peng 12.Stephen Schuh 13.Till Straumann Sys. Engineers (1 per DAY shift) 1.Eric Bong 2.Carl Rago 3.Leif Eriksson 4.Richard F. Boyce 5.Jose Chan 6.Tim Montagne 7.Paul Bellomo 8.Antonio de Lira 9.Dave MacNair Accelerator, ILC, SSRL 1.Franz-Josef Decker 2.Jim Turner 3.Rick Iverson 4.Doug McCormick 5.Joe Frisch 6.Marc Ross 7.Jeff Corbett 8.James Safranek Laser Operators Visitors ?

Paul Emma Injector/BC1 Commissioning April 20, Man-Power Requirements (12/1/06 – 8/1/07) 32 weeks total (12/1/06 to 8/1/07, minus 2 weeks) 80% coverage (downtime) 14 lead-physicist shifts/week 14 physicist shifts/week 7 controls eng. shifts/week 7 sys. engineer shifts/week 21 laser operator shifts/week (28 operator shifts/week) Average of 2.8 shifts/week for each lead physicist Average of 2.0 shifts/week for each physicist Average of 0.5 shifts/week for each controls eng. Average of 0.8 shifts/week for each sys. engineer Average of 4-5 shifts/week for each laser operator (32 weeks)  (2   )  (80%)  1600 man-shifts = man-hours  6.5 man-years (+ 2.9 from op’s)

Paul Emma Injector/BC1 Commissioning April 20, LCLS Commissioning Parameters ParameterValueComments RF rate 30 Hz 30 Hz in linac (possible short-term 120 Hz linac rate in L0-BC1 for feedback tests, etc) Hz in gun for short time to verify full rate Beam rate ≤30 Hz 30 Hz e- beam as baseline – possible 120-Hz tests in L0-BC1 for short term verification of feedback, etc Drive-laser rate 120 Hz 120-Hz all the times – pulse-picker provides e  rate as required above Bunch charge pC pC, depending on QE and diagnostics - short spans at 10 pC – later in ’07 we explore 1-nC Drive-laser pulse length 10 ps fwhm 10 ps fwhm startup with possibility of 6-ps at 0.2 nC later – early laser tests may provide path to more convenient pulse-length changes Gun gradient 120 MV/m 120 MV/m, although 110 MV/m is adequate in ‘07

Paul Emma Injector/BC1 Commissioning April 20, Issues Controls will be mixed (SLC & epics) and capabilities may be limited initially Most High-Level Applications (emittance, bunch length, feedback) must done through MATLAB as a temporary solution Most LCLS physicists not yet experienced in SLAC control room with SLC controls Help from operations group will be needed