Lecture 6 Estimation Estimate size, then Estimate effort, schedule and cost from size Bound estimates CS 540 – Quantitative Software Engineering.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 23Slide 1 Software Cost Estimation.
Software project management (intro)
Lecture 2 Estimation-revisited Estimate size, then Estimate effort, schedule and cost from size Reuse, reuse, reuse CS 552.
SOFTWARE PROJECT MANAGEMENT AND COST ESTIMATION © University of LiverpoolCOMP 319slide 1.
Lecture 6 Estimation Estimate size, then Estimate effort, schedule and cost from size CS 540 – Quantitative Software Engineering.
CS 551 Estimation Fall December QSE Lambda Protocol Prospectus Measurable Operational Value Prototyping or Modeling sQFD Schedule, Staffing,
Lecture 5 Estimation-revised Estimate size, then Estimate effort, schedule and cost from size CS 551.
SOFTWARE PROJECT MANAGEMENT AND COST ESTIMATION © University of LiverpoolCOMP 319slide 1.
Information Technology Project Management
Software Cost Estimation Hoang Huu Hanh, Hue University hanh-at-hueuni.edu.vn.
1 Cost Estimation CIS 375 Bruce R. Maxim UM-Dearborn.
Information System Economics Software Project Cost Estimation.
Copyright © The David Consulting Group, Inc. 1 UNDERSTANDING and EFFECTIVELY USING FUNCTIONAL MEASUREMENT Presented By The David Consulting Group.
© The McGraw-Hill Companies, Software Project Management 4th Edition Software effort estimation Chapter 5.
Cmpe 589 Spring Software Quality Metrics Product  product attributes –Size, complexity, design features, performance, quality level Process  Used.
1 ECE 453 – CS 447 – SE 465 Software Testing & Quality Assurance Lecture 22 Instructor Paulo Alencar.
COCOMO Models Ognian Kabranov SEG3300 A&B W2004 R.L. Probert.
Estimation Why estimate? What to estimate? When to estimate?
Dr. M. Shamim HossainSWE 211 Effort, Duration and Cost Lec 3 1.
Chapter 6 : Software Metrics
Chapter 6 The Work Breakdown Structure and Project Estimation Copyright 2012 John Wiley & Sons, Inc. 6-1.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 26 Slide 1 Software cost estimation 1.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 23Slide 1 Chapter 23 Software Cost Estimation.
CS /39 Illinois Institute of Technology CS487 Software Engineering David A. Lash.
Personal Estimation with PROBE CS3300 Fall Code Size Estimation Wide Band Delphi (Boehm) Give the team the specs to study Discuss the project goals.
Software cost estimation Predicting the resources required for a software development process 1.
Software Engineering SM ? 1. Outline of this presentation What is SM The Need for SM Type of SM Size Oriented Metric Function Oriented Metric 218/10/2015.
1 Estimation Function Point Analysis December 5, 2006.
T. E. Potok - University of Tennessee CS 594 Software Engineering Lecture 3 Dr. Thomas E. Potok
Lecture 4 Software Metrics
10/27/20151Ian Sommerville.  Fundamentals of software measurement, costing and pricing  Software productivity assessment  The principles of the COCOMO.
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 3 1 Software Size Estimation I Material adapted from: Disciplined.
Cost Estimation. Problem Our ability to realistically plan and schedule projects depends on our ability to estimate project costs and development efforts.
Cost Estimation What is estimated? –resources (humans, components, tools) –cost (person-months) –schedule (months) Why? –Personnel allocation –Contract.
Quality Software Project Management Software Size and Reuse Estimating.
Function Point Analysis. Function Points Analysis (FPA) What is Function Point Analysis (FPA)? Function points are a standard unit of measure that represent.
SEG3300 A&B W2004R.L. Probert1 COCOMO Models Ognian Kabranov.
Introduction to Software Project Estimation I (Condensed) Barry Schrag Software Engineering Consultant MCSD, MCAD, MCDBA Bellevue.
©Ian Sommerville 2000Software Engineering, 7th edition. Chapter 26Slide 1 Software cost estimation l Predicting the resources required for a software development.
SFWR ENG 3KO4 Slide 1 Management of Software Engineering Chapter 8: Fundamentals of Software Engineering C. Ghezzi, M. Jazayeri, D. Mandrioli.
©1999 Addison Wesley LongmanSlide 3.1 Managing IS Projects Planning –Decomposing Project into Activities –Estimating resources –Developing a schedule –Setting.
Software cost estimation. Fundamental estimation questions How much effort is required to complete an activity? How much calendar time is needed to complete.
Function Points Synthetic measure of program size used to estimate size early in the project Easier (than lines of code) to calculate from requirements.
Estimating “Size” of Software There are many ways to estimate the volume or size of software. ( understanding requirements is key to this activity ) –We.
Effort Estimation In WBS,one can estimate effort (micro-level) but needed to know: –Size of the deliverable –Productivity of resource in producing that.
Functional Size Measurement Methodologies. What is FSM ? Definitions: Functional Size: A size of the software derived by quantifying the Functional User.
540f07cost12oct41 Reviews Postmortem u Surprises? u Use white background on slides u Do not zip files on CD u Team leader should introduce team members.
FUNCTION POINT ANALYSIS & ESTIMATION
Cost Estimation Cost Estimation “The most unsuccessful three years in the education of cost estimators appears to be fifth-grade arithmetic. »Norman.
Estimation Questions How do you estimate? What are you going to estimate? Where do you start?
THE FAMU-CIS ALUMNI SYSTEM
Alternative Software Size Measures for Cost Estimation
The Work Breakdown Structure and Project Estimation
RET Rules One of the following rules applies when counting RETs:
Software Engineering (CSI 321)
The Work Breakdown Structure and Project Estimation
Software Planning
Software Development & Project Management
COCOMO Model Basic.
Chapter 5: Software effort estimation- part 2
Software Metrics “How do we measure the software?”
More on Estimation In general, effort estimation is based on several parameters and the model ( E= a + b*S**c ): Personnel Environment Quality Size or.
COCOMO Models.
Software Development Cost Estimation Chapter 5 in Software Engineering by Ian Summerville (7th edition) 4/7/2019.
Software Cost Estimation
Chapter 26 Estimation for Software Projects.
COCOMO MODEL.
Presentation transcript:

CS 540 – Quantitative Software Engineering Lecture 7 Estimation Estimate size, then Estimate effort, schedule and cost from size Bound estimates

Project Metrics: Why Estimate? Cost and schedule estimation Measure progress Calibrate models for future estimation Manage Project Scope Make Bid/No Bid decisions Make Buy/Build decisions Just differentiating metrics and their uses (and most metrics could be used for both).

QSE Lambda Protocol Prospectus Measurable Operational Value Prototyping or Modeling sQFD (Quality Functional Deployment) Schedule, Staffing, Quality Estimates ICED-T (Intuitive, Consistent, Efficient, Durable-Thoughtful) Trade-off Analysis

Specification for Development Plan Project Feature List Development Process Size Estimates Staff Estimates Schedule Estimates Organization Gantt Chart

Approaches to Cost Estimation By expert By analogies Decomposition Parkinson’s Law; work expands to fill time available Price to win/ customer willingness-to -pay Lines of Code Function Points Mathematical Models: Function Points & COCOMO

Heuristics to do Better Estimates Decompose Work Breakdown Structure to lowest possible level and type of software. Review assumptions with all stakeholders Do your homework - past organizational experience Retain contact with developers Update estimates and track new projections (and warn) Use multiple methods Reuse makes it easier (and more difficult) Use ‘current estimate’ scheme Here are some other hints I have accumulated over time. An obvious practice is that once development starts, track your estimates to determine how well they are doing and adjust accordingly! Reuse is great, but as B&Y pointed out, preparing code for reuse requires a tripling of the estimate of effort.

Heuristics to Cope with Estimates Add and train developers early Use gurus for tough tasks Provide manufacturing and admin support Sharpen tools Eliminate unrelated work and red tape (50% issue) Devote full time end user to project Increase level of exec sponsorship to break new ground (new tools, techniques, training) Set a schedule goal date but commit only after detailed design Use broad estimation ranges rather than single point estimates And what if you are not unhappy with the schedule that management hands to you! (Not so uncommon these days!) McConnell lists some strategies that ma help you to meet these “unpopular” (aka impossible) schedules.

Popular Methods for Effort Estimation Parametric Estimation Wideband Delphi Cocomo SLIM (Software Lifecycle Management) SEER-SEM Function Point Analysis PROBE (Proxy bases estimation, SEI CMM) Planning Game (XP) Explore-Commit Program Evaluation and Review Technique (PERT)

SEER-SEM: System Evaluation and Estimation of Resources Sizing. How large is the software project being estimated (Lines of Code, Function Points, Use Cases, etc.) Technology. What is the possible productivity of the developers (capabilities, tools, practices, etc.) Effort and Schedule Calculation. What amount of effort and time are required to complete the project? Constrained Effort/Schedule Calculation. How does the expected project outcome change when schedule and staffing constraints are applied? Activity and Labor Allocation. How should activities and labor be allocated into the estimate? Cost Calculation. Given expected effort, duration, and the labor allocation, how much will the project cost? Defect Calculation. Given product type, project duration, and other information, what is the expected, objective quality of the delivered software? Maintenance Effort Calculation. How much effort will be required to adequately maintain and upgrade a fielded software system? Progress. How is the project progressing and where will it end up. Also how to replan. Validity. Is this development achievable based on the technology involved?

Wide Band Delphi Convene a group of experts Coordinator provides each expert with specification Experts make private estimate in interval format: most likely value and an upper and lower bound Coordinator prepares summary report indicating group and individual estimates Experts discuss and defend estimates Group iterates until consensus is reached This is sort of a “N heads are better than one” philosophy! This does work fairly well if you have the experts available to do this. It also is useful on some of the new classes of projects, e.g., web related, since most of the older measures including COCOMO did not have in the initial project list that were used to compute the measures. If you do have the experts and they are familiar with the application domain I find this preferable, supported by a KLOC or Function Point estimate -- the two provide a fairly good view on what it will take. If your experts are truly experts and they know your team, they will most likely be the most accurate because they have more local knowledge that cannot possibly be factored into the more general models.

Minimum Time: PERT and GANTT

But, how can I estimate staff months? Boehm: “A project can not be done in less than 75% of theoretical time” Time Ttheoretical 75% * Ttheoretical Linear increase Staff-month Impossible design But, how can I estimate staff months? Ttheoretical = 2.5 * 3√staff-months

Sizing Software Projects Effort = (productivity)-1 (size)c productivity ≡ staff-months/kloc size ≡ kloc Staff months 500 Lines of Code or Function Points

Understanding the equations Consider a transaction project of 38,000 lines of code, what is the shortest time it will take to develop? Module development is about 400 KSLOC/staff month Effort = (productivity)-1 (size)c = (1/.400 KSLOC/SM) (38 KSLOC)1.02 = 2.5 (38)1.02 ≈ 100 SM Min time = .75 T= (.75)(2.5)(SM)1/3 ≈ 1.875(100)1/3 ≈ 1.875 x 4.63 ≈ 9 months

Productivity= f(size) Bell Laboratories data Capers Jones data Productivity (Function points / staff month) Function Points

Lines of Code LOC ≡ Line of Code KLOC ≡ Thousands of LOC KSLOC ≡ Thousands of Source LOC NCSLOC ≡ New or Changed KSLOC

Bernstein’s rule of thumb Productivity per staff-month: 50 NCSLOC for OS code (or real-time system) 250-500 NCSLOC for intermediary applications (high risk, on-line) 500-1000 NCSLOC for normal applications (low risk, on-line) 10,000 – 20,000 NCSLOC for reused code Reuse note: Sometimes, reusing code that does not provide the exact functionality needed can be achieved by reformatting input/output. This decreases performance but dramatically shortens development time.

Productivity: Measured in 2000 Classical rates 130 – 195 NCSLOC Evolutionary approaches 244 – 325 NCSLOC New embedded flight software 17 – 105 NCSLOC

Heuristics for requirements engineering Move some of the desired functionality into version 2 Deliver product in stages 0.2, 0.4… Eliminate features Simplify Features Reduce Gold Plating Relax the specific feature specifications Here’s some hints -- note the implicit assumption is that the estimate exceeds the allotted schedule! I’ve never seen it go the other way! Speaking of a risky business -- onto risk!

Function Point (FP) Analysis Useful during requirement phase Substantial data supports the methodology Software skills and project characteristics are accounted for in the Adjusted Function Points FP is technology and project process dependent so that technology changes require recalibration of project models. Converting Unadjusted FPs (UFP) to LOC for a specific language (technology) and then use a model such as COCOMO.

Function Point Calculations Unadjusted Function Points UFP= 4I + 5O + 4E + 10L + 7F, Where I ≡ Count of input types that are user inputs and change data structures. O ≡ Count of output types E ≡ Count of inquiry types or inputs controlling execution. [think menu selections] L ≡ Count of logical internal files, internal data used by system [think index files; they are group of logically related data entirely within the applications boundary and maintained by external inputs. ] F ≡ Count of interfaces data output or shared with another application Note that the constants in the nominal equation can be calibrated to a specific software product line. Function points have their fudge factors too, and most practitioners do not use the unadjusted function point metric.

External Inputs – One updates two files External Inputs (EI) - when data crosses the boundary from outside to inside.  This data may come from a data input screen or another application.

External Interface Table File Type References (FTR’s) are the sum of Internal Logical Files referenced or updated and External Interface Files referenced.                                   For example, EIs that reference or update 2 File Types Referenced (FTR’s) and has 7 data elements would be assigned a ranking of average and associated rating of 4.

External Output from 2 Internal Files External Outputs (EO) – when data passes across the boundary from inside to outside.  

External Inquiry drawing from 2 ILFs External Inquiry (EQ) - an elementary process with both input and output components that result in data retrieval from one or more internal logical files and external interface files.  The input process does not update Internal Logical File, and there is no derived data.

EO and EQ Table mapped to Values

Adjusted Function Points Accounting for Physical System Characteristics Characteristic Rated by System User 0-5 based on “degree of influence” 3 is average Unadjusted Function Points (UFP) X General System Characteristics (GSC) = Data Communications Distributed Data/Processing Performance Objectives Heavily Used Configuration Transaction Rate On-Line Data Entry End-User Efficiency On-Line Update Complex Processing Reusability Conversion/Installation Ease Operational Ease Multiple Site Use Facilitate Change Adjusted Function Points (AFP) AFP = UFP (0.65 + .01*GSC), note GSC = VAF= TDI

Complexity Table TYPE: SIMPLE AVERAGE COMPLEX INPUT (I) 3 4 6 OUTPUT(O) 5 7 INQUIRY(E) LOG INT (L) 10 15 INTERFACES (F) There is also a judgment made on the complexity of each of these domains that were counted.

Complexity Factors 1. Problem Domain ___ 2. Architecture Complexity ___ 3. Logic Design -Data ___ 4. Logic Design- Code ___ Total ___ Complexity = Total/4 = _________

Problem Domain Measure of Complexity (1 is simple and 5 is complex) All algorithms and calculations are simple. Most algorithms and calculations are simple. Most algorithms and calculations are moderately complex. Some algorithms and calculations are difficult. Many algorithms and calculations are difficult. Score ____

Architecture Complexity Architecture Complexity Measure of Complexity (1 is simple and 5 is complex) 1. Code ported from one known environment to another. Application does not change more than 5%. 2. Architecture follows an existing pattern. Process design is straightforward. No complex hardware/software interfaces. 3. Architecture created from scratch. Process design is straightforward. No complex hardware/software interfaces. 4. Architecture created from scratch. Process design is complex. Complex hardware/software interfaces exist but they are well defined and unchanging. 5. Architecture created from scratch. Process design is complex. Complex hardware/software interfaces are ill defined and changing. Score ____

Logic Design -Data Simple well defined and unchanging data structures. Shallow inheritance in class structures. No object classes have inheritance greater than 3. Several data element types with straightforward relationships. No object classes have inheritance greater than Multiple data files, complex data relationships, many libraries, large object library. No more than ten percent of the object classes have inheritance greater than three. The number of object classes is less than 1% of the function points Complex data elements, parameter passing module-to-module, complex data relationships and many object classes has inheritance greater than three. A large but stable number of object classes. Complex data elements, parameter passing module-to-module, complex data relationships and many object classes has inheritance greater than three. A large and growing number of object classes. No attempt to normalize data between modules Score ____

Logic Design- Code Nonprocedural code (4GL, generated code, screen skeletons). High cohesion. Programs inspected. Module size constrained between 50 and 500 Source Lines of Code (SLOCs). Program skeletons or patterns used. ). High cohesion. Programs inspected. Module size constrained between 50 and 500 SLOCs. Reused modules. Commercial object libraries relied on. High cohesion. Well-structured, small modules with low coupling. Object class methods well focused and generalized. Modules with single entry and exit points. Programs reviewed. Complex but known structure randomly sized modules. Some complex object classes. Error paths unknown. High coupling. Code structure unknown, randomly sized modules, complex object classes and error paths unknown. High coupling. Score __

Computing Function Points See http://www.engin.umd.umich.edu/CIS/course.des/cis525/js/f00/artan/functionpoints.htm

Adjusted Function Points Now account for 14 characteristics on a 6 point scale (0-5) Total Degree of Influence (DI) is sum of scores. DI is converted to a technical complexity factor (TCF) TCF = 0.65 + 0.01DI Adjusted Function Point is computed by FP = UFP X TCF For any language there is a direct mapping from Function Points to LOC Beware function point counting is hard and needs special skills Adjusted function points consider factors similar to those of the advanced COCOMO model. These factors are shown on the next slide. In training, folks should strive for consistency in counting function points … that is, scorers should agree on the counts of the factors, the complexity of each of the counts and the scoring of the characteristics -- this can be achieved but it takes a fair amount of training. The measure of scorers agreeing with each other is often referred to as inter-rater reliability.

Function Points Qualifiers Based on counting data structures Focus is on-line data base systems Less accurate for WEB applications Even less accurate for Games, finite state machine and algorithm software Not useful for extended machine software and compliers An alternative to NCKSLOC because estimates can be based on requirements and design data. In other software engineering course at Stevens you will learn to calculate function points. It is a skill that has to be acquired and it does take a while. Function points are currently one of the more popular ways to estimate effort. B&Y stress in heavily in chapter 6.

SLOC Defined : Single statement, not two separated by semicolon Line feed All written statements (OA&M) No Comments Count all instances of calls, subroutines, … There are no industry standards and SLOC can be fudged More on SLOC. The last line is telling - if you demand that developers code to some productivity level measured by lines of code, number of comments, you get what you ask for -- see pp186-187 in B&Y, the case of the Bard’s Bulge.

Initial Conversion Language Median SLOC/function point C 104 C++ 53 http://www.qsm.com/FPGearing.html Language Median SLOC/function point C 104 C++ 53 HTML 42 JAVA 59 Perl 60 J2EE 50 Visual Basic For completeness and to provide you with a feel for the degree of effort a function point represents here’s another table mapping several computer languages to function points.

Average Median Low High Consultant

Function Points = UFP x TCF = 78 * .96 = 51.84 ~ 52 function points SLOC Function Points = UFP x TCF = 78 * .96 = 51.84 ~ 52 function points 78 UFP * 53 (C++) SLOC / UFP = 4,134 SLOC ≈ 4.2 KSLOC . (Reference for SLOC per function point: http://www.qsm.com/FPGearing.html)

Understanding the equations For 4,200 lines of code, what is the shortest time it will take to develop? Module development is about 400 SLOC/staff month From COCOMO: Effort = 2.4 (size)c By Barry Boehm

What is ‘2.4?’ Effort = 2.4 (size)c = 1/(.416) (size)c Effort = (productivity)-1 (size)c where productivity = 400 KSLOC/SM from the statement of the problem = (1/.400 KSLOC/SM)(4.2 KSLOC)1.16 = 2.5 (4.2)1.16 ≈ 13 SM

Minimum Time Theoretical time = 2.5 * 3√staff-months Min time = .75 Theorectical time = (.75)(2.5)(SM)1/3 ≈ 1.875(13)1/3 ≈ 1.875 x 2.4 ≈ 4.5 months

Function Point pros and cons Language independent Understandable by client Simple modeling Hard to fudge Visible feature creep Cons: Labor intensive Extensive training Inexperience results in inconsistent results Weighted to file manipulation and transactions Systematic error introduced by single person, multiple raters advised Here’s a listing of the advantages and disadvantages to function points from B&Y pp. 183-4. Function points are certainly more difficult to fudge than SLOC since they address aspects of the application. The other emphasis is on data collection -- you are only as good as your historical data and if you use these techniques extensively you should endeavor to continue to collect data and tune the metrics from experience.

poor performance or poor estimates. Easy? “When performance does not meet the estimate, there are two possible causes: poor performance or poor estimates. In the software world, we have ample evidence that our estimates stink, but virtually no evidence that people in general don’t work hard enough or intelligently enough.” -- Tom DeMarco Even with all the historical data, fancy statistical models, elaborate schemes for assessing difficulty and estimating effort, it is still not easy and many estimates fall short. I love the DeMarco quote - it puts the issue squarely where it belongs. Developers should not be punished for inaccurate estimates.

Capers Jones Expansion Table The computer language you use also affects the estimation. This table by Capers Jones provides you with an idea of how lines expand, using a line of assembly language as the basic unit. Therefore a line in C is worth 2.5 lines of assembler and a line in a spreadsheet may represent up to 50 lines of assembler! It provides a metric to help compare apples and oranges. This also illustrates that the problem of estimation must be examined from many perspectives.

Bernstein’s Trends in Software Expansion 638 1000 475 142 113 81 75 100 47 37.5 Expansion Factor 30 15 10 Order of Magnitude Every Twenty Years 3 1 Technology Change 1960 Machine Instructions 1965 Macro Assembler 1970 High Level Language 1975 Database Manager 1980 On-line 1985 Prototyping 1990 Subsec Time Sharing 1995 Object Oriented Programming 2000 Large Scale Reuse Regression Testing Small Scale Reuse 4GL

Sizing Software Projects Effort = (productivity)-1 (size)c Staff months 500 1000 Lines of Code or Function Points

Regression Models Effort: Watson-Felix: Effort = 5.2 KLOC 0.91 COCOMO: Effort = 2.4 KLOC 1.05 Halstead: Effort = 0.7 KLOC 1.50 Schedule: Watson-Felix: Time = 2.5E 0.35 COCOMO: Time = 2.5E 0.38 Putnam: Time = 2.4E 0.33 Note that for time estimates the exponents of the three models are real close as are the multipliers. Effort equations are a bit more variable but still similar (lower exponents, higher multipliers)

COCOMO COnstructive COst MOdel Based on Boehm’s analysis of a database of 63 projects - models based on regression analysis of these systems Linked to classic waterfall model Effort is number of Source Lines of Code (SLOC) expressed in thousands of delivered source instructions (NCKSLOC) - excludes comments and unmodified software Original model has 3 versions and considers 3 types of systems: Organic - e.g.,simple business systems Embedded -e.g., avionics Semi-detached -e.g., management inventory systems Key is that these projects are relatively old although Boehm has done a great job of updating the model in newer versions, which we will see later. It is interesting and instructive to see how COCOMO - one of the classic estimation models - evolved.

COCOMO Model Effort in staff months =b*NCKSLOCc b c organic 2.4 1.05 semi-detached 3.0 1.12 embedded 3.6 1.20 As you may have anticipated, the farther down the table the larger the values of the variable in the equation thereby dramatically affecting effort. It is amazing across models how similar the values of the parameters are. (see next slide)

COCOMO System Types SIZE INNOVATION DEADLINE CONSTRAINTS Organic Small Little Not tight Stable Semi-Detached Medium Embedded Large Greater Tight Complex hdw/customer interfaces These classifications are computed by mapping the project to this table. As you can infer, organic is the simplest and embedded the hardest.

Proposed System Proposed System Accounting Inventory OA&M Order Customer Shipment Notice Create Order Check Status Proposed System OA&M Order Creation Users Assign Order to Truck Order Display Dispatch Support Problem Resolution Catalog Truckload Report Order Update Shipping Invoices Credit Check Orders Problem Resolution Dispatch Inventory Assignment Management Reporting Completion Held Order Processing Check Credit & Completion Assign Inventory to Order New Inventory for Held Orders Inventory Assigned Management Reports Accounting Inventory

Case Study:

GSC

Applying the equations For 418 UFP x 63 (Java) SLOC/FP = 26334 SLOC ≈ 30 KSLOC How long will it take to develop? Module development is about 330 SLOC/staff month

Summary: Popular Methods for Effort Estimation Parametric Estimation Wideband Delphi Cocomo SLIM (Software Lifecycle Management) SEER-SEM Function Point Analysis PROBE (Proxy bases estimation, SEI CMM) Planning Game (XP) Explore-Commit Program Evaluation and Review Technique (PERT)

Business Realities Customer Affordability/Willingness to pay: design the system to win the business Conflict of Interests: Project Manager (affordability and profit) vs. Development/Test (pad budgets) Estimation with uncertainty: the more you know (better understood)—the higher the estimate Personality Traits: risk aversion, tolerance for ambiguity Staffing Issues: sometimes any business is better than no business Opportunity Cost: Winning a bid prevents you from working on other deals Strategic Interests: Losing $ is sometimes ok