PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.

Slides:



Advertisements
Similar presentations
GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
Advertisements

1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
PALM-3000 Status of the PALM-3000 high-order adaptive optics system A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss, J.R. Crepp,
PILOT: Pathfinder for an International Large Optical Telescope -performance specifications JACARA Science Meeting PILOT Friday March 26 Anglo Australian.
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
NGAO Companion Sensitivity Performance Budget (WBS ) Rich Dekany, Ralf Flicker, Mike Liu, Chris Neyman, Bruce Macintosh NGAO meeting #6, 4/25/2007.
PALM-3000 PALM-3000 Instrument Requirements Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 HOWFS - 5/29/09 C. Baranec. PALM-3000 HOWFS tasks in preparation for testbed work CCD50 readout modes – defined, awaiting quote. Test the camera.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
PALM-3000 HOWFS Design Update 2/27/08 C. Baranec Pasadena, CA February 27 th 2008.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Status and the 3388-actuator Xinetics Deformable Mirror A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss,
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Recent & planned high-contrast work on the WCS and P3K Gene Serabyn Nov. 12, 2007.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Palomar Laser Guide Star Adaptive Optics Antonin Bouchez & Mitchell Troy John Angione, Rick Burruss, John Cromer, Richard Dekany, Steve Guiwits, John Henning,
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
NGAO NGS WFS design review Caltech Optical Observatories 1 st April NGAO WFS design, Caltech Optical Observatories.
ORCHID System Engineering J. Kent Wallace 14 Oct 2010.
LGS Project Meeting November 9, Outline 1.Project infrastructure 2.PALM-3000 update 3.LGS subsystem updates –Optical bench –LGS facility –AO software.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO Performance Flowdowns R. Dekany 02 September 2009.
PALM-3000 HOWFS - 7/24/09 C. Baranec. PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN.
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
NGAO NGS WFS design review Caltech Optical Observatories 1 st April NGAO WFS design, Caltech Optical Observatories.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
NGAO Wavefront Error Performance Budgets R. Dekany 13 May 2010.
Some large-telescope design parameter considerations: Distributed pupil telescopes J.R.Kuhn Institute for Astronomy, UH How to “distribute the glass” in.
Keck AO Operations D. Le Mignant for the Keck AO team.
J. Large Binocular Telescope (LBT) Operational Readiness
MCAO Adaptive Optics Module Subsystem Optical Designs R.A.Buchroeder.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
Closed Loop Performance Laird Close and MagAO team SAC review.
1 Manal Chebbo, Alastair Basden, Richard Myers, Nazim Bharmal, Tim Morris, Thierry Fusco, Jean-Francois Sauvage Fast E2E simulation tools and calibration.
The AO system for the GTC -an update Nicholas Devaney, Dolores Bello, Bruno Femenía, Alejandro Villegas, Javier Castro Grantecan, Instituto de Astrofísica.
Low order modes sensing for LGS MCAO with a single NGS S. Esposito, P. M. Gori, G. Brusa Osservatorio Astrofisico di Arcetri Italy Conf. AO4ELT June.
Lyot Stop Focal Plane Mask OAP3 Out of plane spherical mirror.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
MCAO System Modeling Brent Ellerbroek. MCAO May 24-25, 2001MCAO Preliminary Design Review2 Presentation Outline Modeling objectives and approach Updated.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
The Active Optics System S. Thomas and the AO team.
FLAO_01: FLAO system baseline & goal performance F. Quirós-Pacheco, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Gemini AO Program SPIE Opto-Southwest September 17, 2001 Ellerbroek/Rigaut [SW01-114] AO … for ELT’s 1 Adaptive Optics Requirements, Concepts, and Performance.
March 31, 2000SPIE CONFERENCE 4007, MUNICH1 Principles, Performance and Limitations of Multi-conjugate Adaptive Optics F.Rigaut 1, B.Ellerbroek 1 and R.Flicker.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
Page 1 Adaptive Optics in the VLT and ELT era Wavefront sensors, correctors François Wildi Observatoire de Genève.
AO4ELT, Paris A Split LGS/NGS Atmospheric Tomography for MCAO and MOAO on ELTs Luc Gilles and Brent Ellerbroek Thirty Meter Telescope Observatory.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
Parameters characterizing the Atmospheric Turbulence: r0, 0, 0
Gemini AO Program March 31, 2000Ellerbroek/Rigaut [ ]1 Scaling Multi-Conjugate Adaptive Optics Performance Estimates to Extremely Large Telescopes.
Lecture 14 AO System Optimization
Trade Study Report: Fixed vs. Variable LGS Asterism
Calibration Plan Chris Neyman W. M. Keck Observatory April 20, 2010.
Presentation transcript:

PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review

PALM-3000 Outline 1.Performance Predictions 2.Requirements 3.Error Budgets 4.Operations Concepts Development 5.Servo Control 6.Work during I&T phase 2

PALM-3000 Strehl vs. Observing Wavelength (for various levels of RMS wavefront error in nm) HH

PALM Reference Science Cases

PALM Performance Summary

PALM-3000 Error Budget Example V = 6.5 NGS Median seeing and wind 30 deg zenith (r 0 = 8.4 cm) Includes: 21 nm RMS anisoplanatism (1.0 arcsec) 35 nm RMS margin Total effective WFE = 104 nm RMS 1-D TT error = 2.3 mas RMS H-Strehl = 85% 6

PALM-3000 Error Budget Example V = 4.5 NGS Median seeing and wind 10 deg zenith (r 0 = 9.1 cm) Includes: 18 nm RMS anisoplanatism (1.0 arcsec) 35 nm RMS margin Total effective WFE = 92 nm RMS 1-D TT error = 1.9 mas RMS H-Strehl = 88% 7

PALM-3000 Error Budget Example V = 6.5 NGS Median seeing and wind 60 deg zenith (r 0 = 6.1 cm) Includes: 44 nm RMS anisoplanatism (1.0 arcsec) 35 nm RMS margin Total effective WFE = 145 nm RMS 1-D TT error = 2.4 mas RMS H-Strehl = 72% Large (and unreliable) contribution from Dispersion Displacement Error 8

PALM-3000 Error Budget Example V = 16.5 NGS Median seeing and wind 20 deg zenith (r 0 = 8.9 cm) Includes: 181 nm RMS anisoplanatism (15 arcsec) 35 nm RMS margin Total effective WFE = 465 nm RMS 1-D TT error = 33 mas RMS K-Strehl = 17% ~2% sky fraction at b = 30 (Same performance achieved for r 0 = 15 cm V = 17.5 NGS located 30 arcsec off-axis ~6% sky fraction at b = 30) 9

PALM-3000 Well-Corrected Subaperture (WCS) Pathfinder Experiment (Serabyn, et al.) Use of an off-axis subaperture with 8cm projected actuator spacing to validate PALM-3000 performance on bright NGS WCS AO stimulus

PALM-3000 WCS experiment confirms PALM-3000 performance predictions B-band ( nm) Strehl ratio  0.10 – 0.12 /D (B) = 59 mas SAO V = 5.1, 6.3 Sep = 0.34” (G. Serabyn) K-band Strehl ratio  RMS WFE  nm Strehl stability: ~1% RMS

PALM-3000 Requirements Science requirements Instrument requirements Subsystem requirements –Software –Stimulus –HOWFS –Electronics –Optical Bench –Real-time Processor 12

PALM Error Budgets Wavefront Error Transmission & Emissivity –Model of trans./emissivity with degraded coatings eg. after 1 year Flexure –Allocations to optical bench, optics mounts, HWFS Acquisition Time –Dominated by hardware, drives software automations & GUI design System Downtime –Allocations to software and hardware failures

PALM Operations Concepts We have developed an Observing Scenarios Document, which covers –Lab procedures (alignment, calibration) –Observing procedures (acquisition, dithering) –Project 1640 survey observing Effectively provided detailed requirements flowdown from Science to Software Used as starting point for lab I&T test plans

PALM-3000 Servo Control Design Flexible control of 2 DMs in a woofer-tweeter arrangement: 1.Direct control of HODM with offload to LODM 2.Modal splitting between DMs Use leaky integrator & regularized reconstructors to control blind modes Calibration WFS updates HOWFS centroid offsets every ~60s

PALM Camera & Servo Modes Currently operating the testbed in camera mode 0, servo mode 3 Developing reconstructors for servo modes 0, 1, and 4

PALM-3000 Systems Engineering tasks in I&T phase Verify requirements compliance (IRD) Complete the development of reconstructors for woofer-tweeter control Develop test plans for system-level performance validation (eg. Plant function measurement) –Revisions of 1999/2003/2005 upgrade test plans 17

PALM-3000 Backup Slides 18

PALM-3000 HOWFS Subaperture Alignment 63  6332  3216  168  8 In the 63x63 subaperture mode the pupil alignment preserve Fried geometry. In the other modes, we will use use modal control.