Lecture(3) Instructor : Dr. Abed Al-Majed Nassar 2009-2010.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Lecture(4) Instructor : Dr. Abed Al-Majed Nassar
PROJECT DELIVERY SYSTEMS
ABET 1 SAYS - Your Senior Design Course Should Include Engineering design is the process of devising a system, component, or process to meet desired needs.
PROCEDURES FOR SELECTING THE CONTRACTOR
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
The Camp Audit “Keep your friends close and your auditor closer”
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Central management of training Program development Local implementation of programs Government orientations, policies and structures Components of the.
Chapter 17 Acquiring and Implementing Accounting Information Systems
Chemical Engineering Department
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
Genesis Solar Module Brochure ™
Financing Urban Public Infrastructure
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Topic 2 Infrastructure Planning Session Matakuliah: S0902 – Manajemen Infrastruktur Tahun: 2010.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
S/W Project Management
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Independent School Process Agency of Education State Board of Education Presentation March 25, 2014.
Refresh of the Task and Solutions Professional Services (TSPS) – Addition of Real Property Project Management Services Class August 2011.
Stave Lake Water Supply and Treatment Project Business Case for P3 Canada Fund Funding Request AMWSC April
Capital Facilities Planning Under the Growth Management Act CFP Webinar #1 November 18, 2014.
Technical viability Part 3. introduction The possibility of implementing the proposed project in terms of engineering and technical through the study.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
1-7 Contract Financing Don Shannon. What is Contract Financing … “the means of obtaining the funds necessary to perform the contract including – Payment.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
14 th NW Tribal Transportation Symposium Pete Field, Transportation Planner FHWA – Western Federal Lands Developing a Long Range Transportation Planning.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
CHAPTER 11 EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD $$$ $
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Specification & Quantities Estimating
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Lecture(9) Instructor : Dr. Abed Al-Majed Nassar
VI. Developing a VSMP Program General Stormwater Training Workshop.
PITFALLS IN DEALING WITH TENDERS &CONTRACTS Shiv Kumar Director/IRICEN.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
FOOD ENGINEERING DESIGN AND ECONOMICS
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
CR TOOLKIT WORKSHOP MANAGEMENT TOOLKIT - RESETTLEMENT PLANNING Ref – ICMM CD TOOLKIT # 18 - Trainer: Martin Paining Date: 28 th of November, 2013.
SEA in the Czech Republic Prague, 24 September 2008.
Dr. Mohamed Riyazh Khan DoMS
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
Role of Consultants in Developing Sustainable Projects Pooja Kapoor Head (Business Development)
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
PROJECT DELIVERY METHODS
(Additional materials)
Pre-contract Planning and Practice
Engineering Project Tendering.
Title: Introduction of Standard Steps in Planning and Implementation of Water Sector Projects in Ethiopia. Prepared by: Dr.-Ing. Asie Kemal Jabir, Addis.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
ESTIMATION Estimation is the scientific way of working out the approximate cost of an engineering project before execution of the work. It is totally different.
Relationship between World Bank and Romanian EA requirements
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Lecture(3) Instructor : Dr. Abed Al-Majed Nassar

Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report. 3 Preparation of contract documents. 4 Activities during construction. 5 Operation. A typical complete planning and implementation process involves a five-stage sequence of reports, documents, and actions for the project

preliminary report a feasibility report preparation of contract document s activities during construction Operation Sequence of Studies for a Single Major – Infrastructure Projects

First Sage: Preliminary (Or Reconnaissance) Report This stage consists of office studies, field studies, and the preparation of a report. This report should answer the following questions: This stage consists of office studies, field studies, and the preparation of a report. This report should answer the following questions: Is a feasible project likely?What are approximate estimates of capacity and cost?What additional studies are needed to confirm feasibility?

First Sage: Preliminary (Or Reconnaissance) Report Office studies Using available information contained in previous reports, maps, and data. Much of this information may be available from state, and local governmental agencies. Utilities, private firms and other sources. Basic materials include soils data; water quality information on environmental conditions, and population and socio-economic data. Field reconnaissance and surveys studies It is needed to confirm the office studies, to suggest changes in the layouts and estimates, and to obtain detailed information concerning additional matters

Second Stage: Feasibility Report This report is authorized in case of the available data in the preliminary report is not enough and needs more clarification and details.

Feasibility Report Contents 1 Descriptions and analyses of the data 2 Confirmation of construction feasibility based on field and laboratory investigations, studies of project arrangements and individual project features, and analysis of construction methods (sources of construction materials, access to the project site, management of traffic patterns, diversion of water during construction, etc). 3 Recommendations for arrangement of project works, preliminary plans and other analyses to determine the principal quantities of construction, a reliable cost estimate, and discussions of the design criteria

Feasibility Report Contents 4 Construction schedule showing the timing and costs of project features 5 Financial analyses projecting the year-by-year costs, revenues, and subsidies. 6 Economic analyses of the project, if appropriate (e.g., if the sponsor is a federal agency or a regional authority).

Feasibility Report Contents 7 Plans for financing construction, and for managing the construction and operation.. 8 Institutional and legal requirements 9 Assessments of the environmental and social impacts of construction and operation, and other impact studies if required.

Third Stage: Final Design and Preparation of Contract Documents Contract documents include plans and specifications that are sufficiently detailed to obtain tenders (bids) from qualified construction and equipment contractors. The plans (drawings) and specifications are based on additional studies of the details of project works, the logistics of construction, other aspects related to temporary and permanent facilities, and the performance of contractors. The sponsor and its engineers and financial specialists review the tenders made by contractors. Contract documents include plans and specifications that are sufficiently detailed to obtain tenders (bids) from qualified construction and equipment contractors. The plans (drawings) and specifications are based on additional studies of the details of project works, the logistics of construction, other aspects related to temporary and permanent facilities, and the performance of contractors. The sponsor and its engineers and financial specialists review the tenders made by contractors.

Fourth Stage: Construction When traditional contracts are employed for the purchase of construction and equipment, additional detailed drawings needed during construction are prepared by the sponsor's engineers and by the contractors subject to the sponsor's approval. Payments to the contractors are usually made based on measurements of work in progress or completed, in accordance with the terms of the contract documents. Usually, a percentage of each payment is withheld by the sponsor and released only when the work is entirely completed and accepted.

The sponsor may employ outside engineers and other consultants to assist in operation for a limited period, train operators, prepare manuals for operation and maintenance, and monitor the performance of the various facilities. The operating rules may be changed on the basis of experience during the operation of the project. Fifth Stage: Operation

Formulation of a Major Engineering Project The engineers (or the interdisciplinary team of specialists) who participate in project formulation define the location and arrangement of project components, with sufficient details concerning their sizes and functions, so that realistic cost estimates and other studies determining feasibility can be prepared. During project formulation, the planner starts with an understanding of the needs to be satisfied and/or the problems to be solved; evaluates the available data and other pertinent information; carries out other investigations; and conceives a plan to utilize land, water, and other resources to meet the project needs and problems. The engineers (or the interdisciplinary team of specialists) who participate in project formulation define the location and arrangement of project components, with sufficient details concerning their sizes and functions, so that realistic cost estimates and other studies determining feasibility can be prepared. During project formulation, the planner starts with an understanding of the needs to be satisfied and/or the problems to be solved; evaluates the available data and other pertinent information; carries out other investigations; and conceives a plan to utilize land, water, and other resources to meet the project needs and problems.

Factor affecting on Selection among Alternatives 1 Ability to respond to purposes and needs 2 Engineering/design feasibility or restrictions 3 Severity of environmental impacts 4 Uncertainty in impact prediction 5 Irreversibility of impacts 6 Degree of beneficial impacts

Factor affecting on Selection among Alternatives 7 Costs 8 Funding availability and commitment 9 Public opinion 10 Political support 11 Ability to meet statutory requirements 12 Permitting agencies concurrence

Uncertainties must be Assessed Primarily by Engineering Judgment 1 Alternative solutions that are apparently equivalent may not produce the same results. 2 Some solutions may offer greater flexibility than others for potential future modifications of the project purposes to suit future needs. 3 Some solutions may include components that are more or less susceptible to unforeseen construction or operation and maintenance problems and consequent increases in costs. 4 In the comparison of alternatives, the planner must also recognize that alternatives may be favored or not favored, or even ruled out, depending upon other practical considerations.

Project Costs

Capital cost Capital recovery costs ( or ownership costs) are incurred by purchasing assets to be used in production and service. Usually Capital costs are nonrecurring (one time costs), where as operating costs recur as long as an asset is owned. Annual cost It is include the maintenance and operation item applies to labor, supplies, and replacement of short-lived equipments and materials.