W a v e 2 0 0 1 Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice.

Slides:



Advertisements
Similar presentations
Pacific Team TEAM INTRODUCTION Pacific 2001 Crystal LangARCHITECT Robert WrightENGINEER Edgar LeenenCONSTRUCTION MANAGER Will Clift APPRENTICE Robert.
Advertisements

Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
BIMception Proposal Thomas Villacampa Alexander Stough Christopher Russell Stephen Pfund.
Express Team University of New Mexico February 24, 2006.
Architect: Greg Miller, Georgia Tech Engineer: Stratton Newbert, Stanford Construction: Lori Huneryager, Stanford Apprentice: Forest Flager, Stanford Owner:
MEMBERS Introduction Architect: Angela Ribas UC Berkeley Engineer: Matthias Niebling Bauhaus-University Weimar, Germany Construction Manager: Kevin Coyne.
Mountain Ridge Project - final presentation - AEC The making of Ridge University Engineering Building E ngineerMartha DelCampo, Stanford A rchitectKatrin.
Bay team’s Output Engineer Yang, Yao-Hung Construction Manager David Walthall Architect Cindy Chan.
Lake Team 2001 Winter Quarter Presentation March 16, 2001 Architect: Robert Williamson, U.C. Berkeley Engineers: Dominik Weiss, FHA, Switzerland Markus.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
University Health Building Thesis Final Presentation
CENTRAL UNIVERISTY ARCHITECTUREJoy Liu, Cal-Berkeley ENGINEERINGNorm Faris, Stanford CONSTRUCTIONTim Kolaya, Georgia Tech OWNERAlex Barron, Stanford Engineering.
High Rise Structural Systems
2001 Winter Presentation. Site Location Site View.
Mountain Ridge Project - winter presentation - AEC The making of Ridge University Engineering Building E ngineerMartha Del Campo, Stanford, CA A rchitectKatrin.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
construction manager Kit Fleming engineer Peng Li architect Xiang Liu owner Hans Verheij Collaboration in Cyberspace E X P R E S S T E A M C.
Reading Structural Drawings
RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
R I V E R A rchitect Elena Paparizou Berkeley E ngineer Paul Kulseth Kansas C onst. Manager Wendy Wang Stanford O wner Jonathan Wong W i n t e.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Pacific Team Winter Quarter Presentation AMaria Zapata, Georgia Tech, Atlanta EAmir Kavousian, Stanford U, Stanford Xin.Zheng Lu, Tsinghua U, Beijing CKarthik.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice – Stanford Brooke.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
RIVER UNIVERSITY. R I V E R A rchitect Elena Paparizou Berkeley E ngineer Paul Kulseth Kansas C onstructor Wendy Wang Stanford O wner Jonathan.
Winter Presentation Island Introducing ISLAND 2000.
Architect (K.U.) ADAM GUMOWSKI V p A c i e w Engineer (S.U.) JASON STONE C.M. (S.U.) BOB FARMAN Winter Quarter Presentation acific P niversity.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
The Mountain Ridge Team Mountain Ridge Team Final Presentation The Ridge University Engineering Building May 15, 1998 Architect: Humberto Cavallin Engineer:
Final Presentation of Bay Engineer Yang, Yao-Hung ConstructionManager David Walthall Architect Cindy Chan.
Structural Systems Design of the Lincoln Fire Department Headquarters Michelle Burback Structural Engineering Capstone and Senior Honors Project.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
TeamMembers Team members of the Team members of the Angela Ribas
CONDOMINIUM TOWER & PARKING
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
Team Introduction Collaboration in Cyberspace
Arch205 Material and building construction 1 floor & Roof systems
PACIFIC TEAM SPRING QUARTER PRESENTATION
The Mountain Ridge Team
Mountain Ridge Project
Arch205 building construction floor & Roof systems
Mississippi Riverbank Project (Final Presentation) May 14, 1999
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

W a v e Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice – Stanford Brooke BarrettOwner Winter Presentation Wave Team 2001

W a v e Architectural Requirements Winter Presentation Location:Atlantic coast, Canada Temperature: not warmer than 31C / 88F not colder than –10C / -14F Precipitation:rain: 59 inches / 1500 mm snow: 107 inches / 272 cm Soil: bedrock, better no basement

W a v e Structural Requirements Design wind speed, V 33 = 80mph Design snow load: Load case 1: 60psf Load case 2: 50psf Soil: bedrock Winter Presentation

W a v e A E C N E W D E S I G N 1 Winter Presentation

Vision School 2015 Modern technology Integration of laptop / mobiles / internet Flexible workplaces Central areas for interaction Share experience Ocean View W a v e Winter Presentation

W a v e Winter Presentation Functional Spaces Auditorium Large class rooms Small class rooms Largest circulation Amount of people Floor 1 LAB Seminars Computer Student offices Middle circulation Floor 1 / 2 Faculty offices Secretaries Chair office Less circulation Same people Floor 3 Lounge Storage Lounge = meeting place = student and teachers All spaces which should have ocean view…

W a v e Winter Presentation New Design 1: Concept

W a v e Winter Presentation New Design 1: Floor plan entrance = ocean side

W a v e Winter Presentation New Design 1: Section

W a v e Winter Presentation New Design 1: 3D model Entrance from sea side Entrance C- E:discussion about glass..

New Design 1: Structural Alternative 1: Concrete Floor 1 Floor 2 Moment resisting frame 6” Post tension slab in large classroom 8” reinforced flat slab 6m 18” square column 32”X32”Post tension beam 18” square beam 1’ Shear wall W a v e Winter Presentation

1 st Floor 2 nd Floor 3 rd Floor Provide column free auditorium Some interior columns minor space adjustments New Design 1: Architectural/structural floor plans W a v e Public Space intrusion

Winter Presentation New Design 1: Structural Alternative 1: foundation Strip footing for perimeter columns and shear walls Width=1m Spread footings for interior columns 1mX1m square W a v e

New Design 1: Structural Alternative 1: Load Paths Winter Presentation GLP LLP Slab rebarcolumnsfoundations Shear wall/ beam-column framefoundations Gravity Load Path: Lateral Load Path:

W a v e New Design 1: Structural Alternative 1 Connection Details Winter Presentation Fiber reinforced grout for connecting rebar Steel cables penetrate column and anchored

W a v e New Design 1: Structural Alternative 2 (Steel) Winter Presentation Moment resisting frame w/ bracing system 3” 20GA composite slab Braced frame Double Angel 6X4X3/8 or Tube Moment resisting connection W18X35 Beam W24X84 Girder

Winter Presentation New Design 1: Structural Alternative 2 Load paths L ess space intrusion Matching architectural/ structural grid Flexible space arrangement 3 rd Floor 2 nd Floor 1 st Floor W a v e

Winter Presentation LLP Gravity load path: BeamGirderColumns Lateral load path: BeamBraceColumns Foundation GirderConnectionColumnsFoundation New Design 1: Structural Alternative 2 Load paths

W a v e New Design 1: Structural Alternative 2 Connections Winter Presentation Typical Moment resisting connection Gusset Plate / bolt connection

W a v e New Design 1: Structural Alternative 2 Connections Winter Presentation W a v e New Design 1: Structural Alternative 2 Connections Winter Presentation Typical Moment resisting connection Gusset Plate / bolt connection

W a v e New Design 1: Special Connections Winter Presentation 14 Sloped reinforced slab to beam connection Alternative 1 Sloped composite slab to beam connection Alternative 2

W a v e Winter Presentation New Design 1: Roof Bolts with fiber reinforced grout for concrete beam connection Angle clip with weld and bolts for steel girder connection

Construction Issues Floor Elevation Winter Presentation W a v e

New Design 1: Alternative 1 Concrete Solution Estimate Winter Presentation W a v e $438,353 $3,613,5735,296,488

New Design 1: Alternative 1 Concrete Solution Schedules Winter Presentation W a v e Week 5 Milestone 1 Milestone 2 Milestone 3 Week 18 Week 24 Week 36Week 28 Week 44 Milestone 2Milestone 1 Milestone 3

New Design 1: Alternative 2 Steel Solution Estimate Winter Presentation W a v e $549,800 $3,942,427$5,625,341

New Design 1: Alternative 2 Steel Solution Schedules Winter Presentation W a v e Milestone 1 Week 5 Milestone 2 Milestone 3 Week 24 Week 18 Week 24 Milestone 1 Week weeks Milestone 2 Milestone 3

W a v e Winter Presentation Traditional from there… Using local materials More integration A and E Introduce corridor Grid 6 x 6m Corridor Horizontal – vertical circulation Division New Design 2: Concept

New Design 2: Floor plan entrance = ocean side W a v e Winter Presentation

New Design 2: Section W a v e Winter Presentation central area E structure

W a v e Winter Presentation entrance Floor 1 Floor 2 Floor 3 New Design 2: 3D Model

W a v e Winter Presentation New Design 2: Facade

W a v e Winter Presentation New Design 2: Materials

W a v e Winter Presentation Steel Moment resisting frame 3” 20GA Composite slab 12m girder, column/column span Moment resisting connection W18X35 Beam W24X84 12m W14X82 Column New Design 2: Structural Alternative 1

Winter Presentation Auditorium Offices 3 rd Floor1 ST Floor 2 nd Floor W a v e Provide column free auditorium Minimize # of columns maximize view, less visual intrusion Columns hidden in partition wall Auditorium New Design 2: Architectural/Structural floor plans Column!!

W a v e Winter Presentation GLP LLP GLP New Design 2: Structural Alternative 1 Load paths Gravity load path: BeamGirder Foundation Lateral load path: Girder/beamConnectionColumnFoundation Column

W a v e Winter Presentation New Design 2: Structural solution-- Foundation Strip footing for perimeter columns width=1m Spread footings for interior columns 2mX2m square

W a v e New Design 2: Alternative 2 Winter Presentation 18’’ square column Post tension beam or 36”X36” square reinforced beam Moment resisting frame 8” reinforced slab 36”X36” column 6m Slab beam ?

Winter Presentation W a v e Winter Presentation New Design 2:Architectural/Structural floor plan Few space intrusions Makes use of columns for architecture purpose 3 rd Floor 2 nd Floor 1 st Floor

W a v e Winter Presentation GLP LLP New Design 2: Structural Alternative 2 Load paths Gravity load path: RebarColumnsFoundations Lateral load path: BeamConnectionColumnFoundations

New Design 2: Structural solution—Connection detail Continuous rebar from beam to column W a v e

Winter Presentation Ultra span light weight steel truss 3’-4’ typical span between trusses Bolt connections to concrete girder Weld/bolt connection to steel beam New Design 2: Structural solution: Roof E C

New Design 2: Alternative 1 Concrete Solution Estimate Winter Presentation W a v e $387,200 $3,405,566$5,017,216

New Design 2: Alternative 1 Concrete Solution Schedules Winter Presentation W a v e Week 32 Week 20 Week 42 2 weeks Week 14 Week 22 Milestone 1

New Design 2: Alternative 2 Steel Solution Estimate Winter Presentation W a v e $50 $3,538,240$5,149,890 $3,538,240$5,149,890 $387,200

New Design 2: Alternative 2 Steel Solution Schedules Winter Presentation W a v e Week 2 Milestone 1 Milestone 2 Week 12 Milestone 3 Week 20 Milestone 3 Week 30 Milestone 2 Milestone 1 40 weeksWeek 20

W a v e A E C R E D E S I G N Winter Presentation

W a v e Winter Presentation Re Design: Concept Using same industrial construction materials Same look for the building Better the design No basement How to add? Gym1000 SF? Cafeteria800 SF? E: start with idea of cantilever…. A-E-C: what is a gym?

W a v e Winter Presentation Re Design: Floor plan Café open space in wide Gym floor 1: heavy loads Basement only large classrooms entrance

Structural Requirements W a v e Redesign: Structural Solution Winter Presentation Steel structure: Cantilever, extension and addition of beam No major resizing of structural members Extended area

Redesign: Structural Solution Winter Presentation W a v e Moment resisting connection at column Simple connection at girders

Redesign: Steel Solution Estimate Winter Presentation W a v e $5, $584,950 $3,720512

Redesign: Steel Solution Schedules Winter Presentation W a v e Week 12 Milestone 2 Milestone 3 Milestone 1 Week 2 Week 24 Week 20 Milestone 1 Week 40 Week 28

Summary of Alternatives Winter Presentation W a v e

Summary of Alternatives Winter Presentation W a v e

Equipment Requirements Mobile Crane (40 or 150 ton) Hydraulic Excavator Concrete Pump Truck Dump Truck Hydraulic Hammerhead Material Handler Winter Presentation

W a v e General Site Layout (L-shape) Winter Presentation

W a v e General Site Layout (square-shape) Winter Presentation

W a v e Matrix Winter Presentation ArchitectEngineerCM New Design 1 Undeveloped circulation High Tech Clear structural grid Possible difficulty casting slope slab Excavation required for Auditorium High cost of the exterior (glass) Possible savings by exposing slab New Design 2 Good organization, elegant, interesting for good detail Structure integrated with architecture No visual intrusion to architectural components High learning curve due to the symmetry of the structure No excavation required for auditorium

W a v e Team Process Winter Presentation Team Dynamics: Interaction with owner: Freedom of design Very busy Interaction with team: Initial communication difficulty due to language, technology barriers Improved AEC interaction Team Process – Iteration: Redesign: E > A> C> Alternative 1: A> E> C> A> E>A Alternative 2: A-E> C> A> E> A>

W a v e Winter Presentation Recommended: Alternative 2 Steel Solution

W a v e Winter Presentation Challenges Planing and measurement of progress Better organization of webspace Optimize interaction between disciplines