NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.

Slides:



Advertisements
Similar presentations
NGAO Systems Engineering Status Team Meeting #3 (Video) R. Dekany 13 December 2006.
Advertisements

NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
W. M. Keck Observatory Keck Next Generation AO Next Generation Adaptive Optics Irvine Meeting September 14, 2006 P. Wizinowich for NGAO Executive Committee.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
LGS AO Operations Transition: Introduction to Meeting April 15, 2005.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
PALM-3000 PALM-3000 Management Update Antonin Bouchez, Jenny Roberts Team Meeting #7 27 February, 2008.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
Functional Requirements Status and Plans Christopher Neyman W. M. Keck Observatory Viswa Velur California Institute of Technology Keck NGAO Team Meeting.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
Don Gavel: Keck NGAO meeting April 25, Some Comments on NGAO System Design and Specification Donald Gavel NGAO Team Meeting 6 April 25, 2007.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting April 3, 2007.
Science Operations Update NGAO - Meeting 11 D. Le Mignant, E. McGrath & C. Max W. M. Keck Observatory 11/05/2007.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Laser Architecture Meeting Oct 1 st, 2007.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team (with input from Sean Adkins, Matthew Britton, Ralf.
Don Gavel: Keck NGAO meeting April 25, Keck NGAO Project Replan: AO and Laser Systems Donald Gavel NGAO Team Meeting 6 April 25, 2007.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO: Cost Comparison with First Light TMT AO Peter Wizinowich, Richard Dekany, Don Gavel with input & review by Brent Ellerbroek SSC Meeting November.
WBS 3.3 Laser Facility Jim Bell, Jason Chin, Erik Johansson, Chris Neyman, Viswa Velur Design Meeting (Team meeting #10) Sept 17 th, 2007.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
System Architecture WBS 3.1 Mid-Year Replan Richard Dekany NGAO Team Meeting #6 April 25-26, 2007 UCSC.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory Viswa Velur California Institute of Technology Keck.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting January 24, 2007.
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
NGAO Wavefront Error Performance Budgets R. Dekany 13 May 2010.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Project Management Life Cycle Katy Koenen 05/07/2013.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
Develop Project Charter
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Science Priorities and Implications of Potential Cost Savings Ideas
NGAO System Design Project Plans and Schedule
Ctclink executive leadership committee May 31, 2018
Project Overview.
Presentation transcript:

NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007

2 Welcome - Participants Telecon Attendees: –NGAO Executive Committee: Rich Dekany, Don Gavel, Claire Max, Peter Wizinowich –Sean Adkins, Brian Bauman, Antonin Bouchez, David Le Mignant, Mike Liu, Franck Marchis, Chris Neyman, Viswa Velur

3 Goals of Today’s Meeting Review Progress (management, science, performance budget & instrument updates) Review trade study reports

4 Meeting Agenda (PST times) 09:50 Welcome (& connections) 10:00 Management Report (Wizinowich) 10:30 Science Team Report (Max) 10:45 Systems Engineering Report (Dekany) 11:15 Performance Budget: Throughput & Emissivity (Bouchez) 11:45 TS Report: GLAO for non-NGAO instruments (Flicker) 12:15 TS Update: MOAO vs MCAO (Gavel) 12:45 Break 13:15 TS Report: Optical Relay (Bauman) 13:45 TS Report: NGAO vs Keck AO Upgrades (Wizinowich) 14:15 TS Report: Interferometry Support Options (Neyman) 14:45 TS Update: Rayleigh Rejection (Velur) 15:15 Upcoming tasks & milestones (Wizinowich) 15:30 Discussion: Issues pertaining to ongoing & upcoming work 16:00 Adjourn

NGAO System Design Phase Management Report NGAO Meeting #5 Peter Wizinowich March 7, 2007

6 Presentation Sequence SD Phase Tracking & Summary Work scope planning sheets status Milestones Status Meeting Tracking Posted documents Upcoming meetings Recommended March Priorities

7 System Design Phase Tracking Tracked (Excel) version of the plan posted at ePlanning/NGAO_SD_schedule_v20_tracked.xls ePlanning/NGAO_SD_schedule_v20_tracked.xls Excel version highlights what’s complete, what’s late, what’s due within next month & status of work scope planning sheets.

8 System Design Phase Tracking Summary 1 WBS 1. SD Phase Management –On-schedule –Still awaiting formal approval & proposal/fundraising deliverables from Directors –Mid-year replan 3/5-3/16 WBS 2.1. Science Requirements –1 work scope planning sheet approved. No others submitted. –5 science cases scheduled for completion by now. None completed. –3 scheduled for completion in March & 4 in April. –Versions 1 & 2 of the Science Case Requirements overdue Version 1 is 95% complete WBS System Requirements Document –1 planning sheet approved, 2 late. –Version 1 complete. Version 2 due in March. Need more feedback, especially on science operations requirements. –Version 1&2 of traceability matrix late.

9 System Design Phase Tracking Summary 2 WBS Performance Budgets –8 planning sheets approved, 1 submitted, 5 late. –Model assumptions. 1 on schedule & 3 late. –Model/tool validation. 2 complete & 2 late. –Performance budgets. 6 late & another 2 due in March. –Version 1 of summary late. WBS Trade Studies –12 planning sheets approved, 1 needs changes, 11 late. –2 complete & 18 late. Another 4 should have started, but haven’t. WBS System Architecture. –Version 1 should have started, but hasn’t. WBS 3.4. Science Operations –2 WBS elements should have been started pre-March, but haven’t & another 5 should start in Mar. WBS 3.5 Science Instruments –Only Interferometer started. 4 others should have been started & 1 is late. WBS 4 SEMP –Preliminary Design Phase Plan due by end of March.

10 NGAO SD Phase Milestones MILESTONEDATEDESCRIPTION SD SEMP Approved 10/9/06 Approval of this plan by the Directors. Initial SEMP version released to Directors for comment on 9/12 & final version on 9/29/06. SD phase contracts in place 10/27/06 Contracts issued to Caltech & UCSC for the system design phase. Science Requirements Summary v1.0 Release 10/27/06 Initial Release of the Science Requirements as input to trade studies and performance budgeting System Requirements Document (SRD) v1.0 Release 12/8/06 Initial release of System Requirements with emphasis on the science requirements Performance Budgets Summary v1.0 Release 2/27/07 First round of all performance budgets complete & documented SRD v2.0 Release 3/22/07 Second release of System Requirements Doc Trade Studies Complete 5/25/07 All trade studies complete & documented (as a series of Keck Adaptive Optics Notes) SRD v3.0 Release 7/12/07 Third release of System Requirements System Design Manual (SDM) v1.0 Release 8/31/07 First release of System Design Manual Technical Risk Analysis v1.0 Release 11/13/07 First round of project risk analysis complete & documented Cost Review Complete 11/30/07 Project cost estimates complete, documented & internally reviewed SDM v2.0 Release 1/8/07 Second release of System Design Manual System Design Review Package Distributed 3/4/08 SDR documents sent to reviewers System Design Review 3/31/08 SDR meeting SDR Report & Project Planning Presentation at SSC meeting 4/14/08 Final SD phase report including results of SDR & project plans

11 Meeting Tracking The tracked version of the action items from each meeting are posted near the top of the meeting page –Meeting –Meeting –Meeting –The bulk of the action items are incomplete –Remember to look at these action items for action items on your presentation (that should be incorporated in the final KAON). The minutes & action items from the EC meetings are posted at

12 Posted KAONs 415 TMT site monitoring data (restricted access) 416 Atmospheric sodium density from Keck LGS photometry 417 Sodium abundance data from MAUI Mesosphere 419 Simple models for the prediction of Na LGS brightness & comparison to measured returns from the Gemini & Keck lasers 420 Accessing the MK TMT seeing & weather data 427 Variable vs fixed LGS asterism 428 Implications & requirements for interferometry with NGAO 429 LGS asterism geometry & size 452 MOAO vs MCAO trade study report (draft) 455 Science Case Requirements Document (Nov draft) 456 System Requirements Document v Wavefront error budget predictions & measured performance for current & upgraded Keck AO 462 Keck AO upgrade trade study (draft) 463 Lessons learned on LGS operations: weather impact, efficiency & science operations model 465 NGAO LGS wavefront sensor: Type & number of subapertures trade study (draft)

13 Upcoming Meetings NGAO Science Case meeting at CfAO retreat Mar. 28 –Need to determine if this meeting can go ahead SSC meeting Apr. 3 –2 nd project report to SSC & Observatory management Will need a written report Need financial reports from COO & UCO –We need to complete the Science Case Requirements v1.0 & Performance Budget Summary v1.0 milestones, & if possible the System Requirements v2.0 milestone –We need to show a plan to get on-track (this will be our mid-year replan) NGAO Team Meeting #6 Apr. 18 at UCSC –Need to post agenda –Need to find a better way to prepare for meetings. Materials should be posted several days before the meeting to allow pre-reading & more effective discussion at the meeting.

14 Team Meeting Calendar

15 PW Recommended Priorities for March (needs discussion) Complete mid-year replan –Include solutions to accelerate progress in the following areas: Science Case Requirements Performance Budgets & Trade Studies Science Instruments –Include revision to meeting goals (& potentially schedule) Complete milestones –V1.0 of Science Case Requirements & Performance Budget Summary Support Science Case meeting at the CfAO (3/28) Complete WBS elements that have been started –This includes completion as a KAON –Should include review by an EC member or their delegate –Don’t start any new WBS elements until you have completed these Project Report #2 ( due before Apr. 3 SSC meeting ) & SSC presentation