WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.

Slides:



Advertisements
Similar presentations
Flow-down of Strategic Priorities to Annual and 5-year WMKO Plan Taft Armandroff Hilton Lewis September 18, 2009 Taft Armandroff Hilton Lewis September.
Advertisements

NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
Science Group: Status, Plans, and Issues Claire Max Liz McGrath August 19, 2008.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
W. M. Keck Observatory Keck Next Generation AO Next Generation Adaptive Optics Irvine Meeting September 14, 2006 P. Wizinowich for NGAO Executive Committee.
Planets around Low-Mass Stars and Brown Dwarfs Michael Liu Bruce Macintosh NGAO Workshop, Sept 2006.
NGAO Companion Sensitivity Performance Budget (WBS ) Rich Dekany, Ralf Flicker, Mike Liu, Chris Neyman, Bruce Macintosh NGAO meeting #6, 4/25/2007.
W. M. Keck Observatory’s Next Generation Adaptive Optics Preliminary Design & Path Forward Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire.
Keck NGAO Science Requirements Claire Max UC Santa Cruz Caltech NGAO Meeting November 14, 2006.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
Impact of Cost Savings Ideas on NGAO Instrumentation December 19, 2008 Sean Adkins.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
Build to Cost Meeting: Goals, Agenda & New Directions Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
NGAO Control Systems Group Status, Plans & Issues NGAO Team Meeting August 19, 2008 Erik Johansson Jimmy Johnson, Doug Morrison, Ed Wetherell.
Observing Operations Concept Document Elizabeth McGrath NGAO PD Team Meeting #6 March 19, 2009.
NGAO Science Instrument Reuse Part 2: Update and required feedback NGAO IWG Anna Moore, Sean Adkins NGAO Team Meeting January 22, 2007.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
What should we propose to ATI? Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
1 Keck NGAO Proposal: Management Overview Presenter: P. Wizinowich SSC Meeting June 21, 2006.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting April 3, 2007.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
Build to Cost Directions & Guidelines Peter Wizinowich SSC Meeting November 3, 2008.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #3 Introduction NGAO Meeting #3 Peter Wizinowich December 13, 2006.
NGAO Science Instruments Build to Cost Status February 5, 2009 Sean Adkins.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
WMKO Next Generation Adaptive Optics Science Advisory Team: Introductions & NSAT Charge Taft Armandroff, Mike Bolte, Shri Kulkarni, Hilton Lewis June 11,
NGAO System Design Phase Management Report - Replan NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team (with input from Sean Adkins, Matthew Britton, Ralf.
Next Generation Adaptive Optics (NGAO) System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max Science Case Presenters: Brian Cameron,
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
1 Keck NGAO Project Replan: Science Cases and Requirements Claire Max NGAO Team Meeting 6 April 25, 2007.
WMKO Next Generation Adaptive Optics Build to Cost Concept Review: Introductions & Charge to the Review Committee Taft Armandroff, Hilton Lewis March 18,
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
NGAO Build to Cost Summary Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max & the NGAO Team SSC Meeting April 14, 2009.
NGAO High-Contrast Performance Budget (WBS aka Companion Sensitivity) Initial WFE budget and status report NGAO Team meeting #4, WMKO Kamuela.
NGAO Instrumentation WBS Replan By Sean Adkins April 25, 2007.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
WMKO Next Generation Adaptive Optics: AO System Design Impact of Cost Savings Ideas Don Gavel December 19, 2008.
Plan to develop system requirements through science cases Claire Max Sept 14, 2006 NGAO Team Meeting.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Build to Cost Meeting: Major NGAO system cost savings ideas Don Gavel NGAO Team Meeting September 11-12, 2008.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
GMT Instrument Development Gary Da Costa ANU Representative GMT Science Advisory Committee.
1 A. Boccaletti Pasadena, Sept th Imaging EGPs with JWST/MIRI and VLT/SPHERE valuable experiences for TPF-C A. Boccaletti, P. Baudoz D. Rouan + coronagraphic.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Science Priorities and Implications of Potential Cost Savings Ideas
NGAO System Design Project Plans and Schedule
Presentation transcript:

WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT

2 Presentation Sequence Build-to-Cost Guidelines Build to Cost Concept Review Success Criteria Conclusion

3 Build-to-Cost Guidelines Provided by the Directors & SSC co-chairs in Aug/08 $60M cost cap in then-year dollars –From start of system design through completion –Includes science instruments –Must include realistic contingency –Cap of $17.1M in Federal + Observatory funds ($4.7M committed) An internal review of the build to cost concept to be held and reported on no later than the Apr/09 SSC meeting

4 Review Success Criteria The revised science cases & requirements continue to provide a compelling case for building NGAO We have a credible technical approach to producing an NGAO facility within the cost cap and in a timely fashion We have reserved contingency consistent with the level of programmatic & technical risk These criteria, plus the deliverables & assumptions (next page), were approved at the Nov. 3, 2008 SSC meeting

5 Review Deliverables & Assumptions Deliverables include a summary of the: –Revisions to the science cases & requirements, & the scientific impact –Major design changes –Major cost changes (cost book updated for design changes) –Major schedule changes –Contingency changes Assumptions –Starting point will be the SD cost estimate with the addition of the science instruments & refined by the NFIRAOS cost comparison Better cost estimates will be produced for the PDR –No phased implementation options will be provided Some may be for the PDR to respond to the reviewer concerns –Major documents will only be updated for the PDR SCRD, SRD, FRD, SDM, SEMP –Will take into account the Keck Strategic Planning 2008 results

6 Starting Point ~$80M in then-year dollars: NGAO estimate at SDR, including system design (SD), ~ $53M (then- year $) –AO facility SD complete as of Apr/08 & preliminary design begun –SD phase actuals $1.234M in then-year $ –SDR estimate to complete AO facility = $42.227M in FY08 $, including contingency –Converted to then-year $ assuming 4% inflation/year & the development schedule proposed at SDR Science instrument estimate at proposal ~ $27M (then-year $) –Science instruments cost estimates, in FY06 $, made in Jun/06 proposal $14M for ~6 unit deployable near-IR integral field instrument $3M each for near-IR and visible imagers –Instrument designs were not part of the NGAO SDR deliverables Some modest work was performed on instrument conceptual designs during the NGAO system design

7 Science Priorities The following prioritized list of NGAO core science requirements was developed with the build-to-cost guidelines in mind & with input from our science community: 1.High sensitivity & sky coverage with 50% EE in < 70 mas (driven by high-z galaxies) 2.Strehl > 20% at 850 nm (driven by black holes in nearby galaxies – need kinematics) 3.Astrometric accuracy < 100 uas at K-band for SO-2 (driven by GC) 4.Backup NGS mode (no worse than K2 NGS) 5.IFU multiplicity is below a line This is not the correct list yet, but simply what CM/EM initially presented at our Sept/08 team meeting Missing items: high performance IR imaging case, J-band science, priority on high sensitivity for single NIR IFU, priority on sky coverage for all types of science, priority & performance for NGS backup mode, priority on high contrast. Priority 2 should be an EE requirement if for BH in AGNs. Need to look at science drivers also.

8 Science Requirement Descopes The following science requirement descopes were identified based on the science priorities in order to allow for cost savings: Provide a single on-axis near-IR IFU instead of the multi-unit deployable IFU Reduce the high contrast science requirements –Target set 1 (nearby, low mass brown dwarf case) remains a requirement, target set 2 becomes a goal Implications: 40 or 48 actuators across the pupil may be adequate for dealing with static telescope aberrations A coronagraph is not needed for the visible imager

9 Cost Drivers Evaluated