Site Survey UCSC -Engineering 2 Linda Rosewood – Lynne Sheehan – Bob Vitale.

Slides:



Advertisements
Similar presentations
SECTOR 8D Study of Booths in sector 8D market We took 1 strip of the market place and studied its booths. More emphasis was given on how the spaces inside.
Advertisements

Classroom Safety. Fire & Life Requirements as per State Education Dept The following list relates to the classrooms and adjacent areas. They are provided.
BUILDING PATHOLOGY AND DIAGNOSTIC case study: HOTEL ALBERI via lungo lario Isonzo –LECCO- STUDENTS: Janaina Gerde Muniz Gerardo Diosdado Espinosa Marco.
Classroom 1. Mission San Luis Rey.

WHEELOCK COLLEGE CAMPUS CENTER AND STUDENT RESIDENCE schematic lighting design anne k cheney lighting | electrical option advisor : dr. kevin houser courtesy.
Yate health centre and locality hub development
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Space Planning Research & Precedents Vermont State Offices at National Life.
Buckman Heights Elementary School Fire Report Presented by: Mr. Donald Mellema Facilities Manager Greece Central School District.
Johanna Mikitka AE-390 October 13, 2004
Ref: ILTINTRO0204_01 Placement of Insect Light Traps.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
Olga Torstensson Halmstad University
Site Survey UCSC -Engineering 2 Linda Rosewood – Lynne Sheehan – Bob Vitale Equipment: WinXP Laptop with Netstumbler MacOSX Laptop with KisMAC Cisco 1200.
Engineering 2 Surveys Introduction. The UCSC Campus in Santa Cruz.
Elevations.
Blue Prints.
1 WiFi Network standards WiFi Network standards BASIC TELECOMMUNICATIONS.
NEW COMMUNITY FACILITY Adam Kroll - Lighting / Electrical - Consultant: Dr. Richard Mistrick - Tech 3: Schematic Design.
Hawthorne Hall – LEVEL 1 EXISTING. PROPOSED Hawthorne Hall – LEVEL 1.
1 ISE Differences between office and factory layout Product  Offices process information  Factories produce things Physical environment  Offices.
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
My Home!. Welcome to my home! This is the front entrance left of the garage.
UC Santa Cruz Engineering Building 2 69,000 ASF ~$47M.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
1 Levine Hall (Upenn) Photo Analysis. 2 Very nice stairwell.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Antenna Concepts © 2001, Cisco Aironet Systems, Inc. Chapter5-1.
Building Plans.
Sonora Clubhouse Ralene Cox IDE222 May 10, Inspiration Inspiration.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
1 SCS Building Committee. 2 The SCS Building Committee Members: Guy Blelloch Randy Bryant Sharon Burks Peter Lee Jim Skees Manuela Veloso.
DIFFERING VIEWS OF INTEGRATED PEST MANAGEMENT (IPM): FOOD PROCESSING INDUSTRY’S VIEW BY JERRY W. HEAPS, BCE & RS THE PILLSBURY COMPANY MINNEAPOLIS, MN.
Draft-linsner-geopriv- relativeloc-01 Marc Linsner Cisco.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
BRVFD & RS Training Facility Proposal 05/07/2009.
Abdulaziz al- zahrani. Difference Between Split AC and Window AC.
Elevations McMillan Villas May 30th 2015.
Welcome to Our Virtual Tour. Student Lounge Second Floor.
New Nation School, Site Nursery School Currently housing senior school Playing field Bus drop off point Site of Senior School Site of Junior School.
Visit on Friday 15 th March Still a building site – due to open in August.
Thesis Lighting Design Proposal Dan Rusnack 12/9/03 Lighting/Electrical option Senior Thesis project Hall Corporate Headquarters.
POV Renovations November 14,2014. Repairing the East Wall.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Discussing environment. INTRODUCTION ● Course Overview ● Course Objectives.
Dorrance H. Hamilton Building
Doc.: IEEE /1044r0 Submission September 2008 Alexander Maltsev, IntelSlide 1 60 GHz WLAN Experimental Investigations Date: Authors:
Doc.: IEEE c Submission May 2006 Su-Khiong Yong, Samsung-SAITSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Park Side Elementary West Side Elementary Marshall Middle School Marshall High School Proposed Security/Safety Improvements.
Symbols and Room Finishes
Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John.
Doc.: IEEE /0499r1 Submission May 2009 Eldad Perahia, Intel CorporationSlide 1 Simulation Scenario Floor Plans Date: Authors:
Innodesk is a start-up established in the year 2012 offering modular office furniture in Hyderabad and South India markets. Our solutions are modern,
Click here for the LIVE WEBCAM
Propagation of Sound and Vibration
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
Wireless Expansion Update and 3 year plan considerations
Sneed Property th Ave E, Puyallup Exterior of House
All Saints Church proposal
Indoor Propagation Modeling
EPHS - FIRST LEVEL ROOM MAP NOTE: INFORMATION/HELP DESK IS ON THE
KOMPLEX Investors Report – Q
Visit on Friday 15th March 2013
<month year> doc.: IEEE a May 2006
Minuteman Vocational Technical Regional High School Progress
Wates CBE Learning Operation defects: Snag sheet slide presentation
Presentation transcript:

Site Survey UCSC -Engineering 2 Linda Rosewood – Lynne Sheehan – Bob Vitale

1.Compare b/g coverage using 2.2dBi “duck” and 5.2dBi ceiling mount antennas. 2.Investigate interesting propagation effects -through walls, windows, between floors, down corridors. 3. Map a coverage area for the 2 nd floor using APs positioned in the corridor and positioned in a lab. Do the results help determine AP placement for building? Objective: Learn About & Understand Propagation in the Engineering 2 Building South Corridor Note “decorative” metal ceiling tiles

2 nd Floor Survey Areas Faculty offices Labs Academic Support Conference room Conference room Loc #2: Rear Corridor Ceiling, AP above 5.5dBi antennas hang below Loc #1: Inside Lab, survey done with 2.2dBi “ducks” and 5.5dBi ceiling mount omnis

Ducks vs. Ceiling Mount Omni 5.5dBi Suspended Ceiling Mount Omni- Directional Antennas Cisco AIR-ANT1728 Cost: $105 each 2.2dBi Rubber Duck Antennas Cisco AIR-ANT4941 Cost: $15 each

E2 2 nd Floor West Survey – Rubber Duck vs. Ceiling Mt Omni TestPoint Value (+= 5.5dBi omni better) 1

RubberDuck Ceiling Mount Omni Diff Location #NameAverageSTDEVAverageSTDEV + = om 1 Room feet from AP Outside Rm 208 Main Cooridor Bench 1 Outside Rm Bench 2 Outside Rm Room 216 cube close to AP Room 216 cube furtherest away Room 215 card towards AP Room 215 card away from AP Room206 Card pointed South A/C Unit between AP/Card Room 205 cube closest to windows Hall behind Room Room 237B Office w/Door closed Interactive Space Benches outside E Room 201 Last Cubicle on Windows Cowboy Chairs 2nd Chair in Room 308 Immediately above AP

Proposed Location 2 nd AP for E2 2 nd Floor – East E2 2 nd Floor – East Survey

Glass Corridor vs. Free Space Is there a difference at 173 feet?

802.11b Propagation FreeSpace vs. Through Coated Glass

Proposed 2 nd Floor Coverage Plan Faculty offices Labs Academic Support Conference room Conference room Channel 1 Channel 11 Channel 6 Channel 1