Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:

Slides:



Advertisements
Similar presentations
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Advertisements

WaitLess*: Presentation #5 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
Random Number Generator Dmitriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #5: “Transistor Level Schematics and Another Floor Plan” 2/21/2007 Team M3 Sasidhar Uppuluri Kalyan Kommineni Kartik Murthy.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #7 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 28 th, 2005 Functional.
Viterbi Decoder: Presentation #10 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 10: 5 th April Final Design Corrections.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #2 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Jan 24, 2005 Architecture.
Noise Canceling in 1-D Data: Presentation #12 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 11 th, 2005 Final.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 7 MAD MAC th March, 2006 Functional Block.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Parking Pal Presentation #8 Team M1: Anna Kochalko Chris Moody Hong Tuck Liew John Wu Team TA: Kartik Murthy October 22, 2007 Gate Level Layout Your digital.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
Camera Auto Focus Presentation 7, March 7 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon. Sept 29 System Hardware Component Diagram.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 4 MAD MAC th February, 2006 Gate Level Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon Oct 6 th Floorplan again Structural Verilog.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 3 MAD MAC th February, 2006 Size estimates/Floor.
Sprinkler Buddy “Low Cost Irrigation Management For Everyone !”
Camera Auto Focus Presentation 8, March 26 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Camera Auto Focus Presentation 10, April 11 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon, Nov 10 Functional Layout Blocks Floor.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
Noise Canceling in 1-D Data: Presentation #5 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 21 st, 2005 Component.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon, Nov 10 Analog Simulation for ExtractedRC.
Camera Auto Focus Presentation 3, February 7 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 8 MAD MAC nd March, 2006 Functional Block.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #3: “New and Improved Floor Plan and Structural Verilog” 2/14/2007 Team M3 Panchalam Ramanujan Kalyan Kommineni Kartik Murthy.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 20 Overall Project Objective : Dynamic Control.
Sprinkler Buddy Presentation #12: “Final Presentation Outline” 4/25/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Sasidhar Uppuluri Devesh.
Parking Pal Presentation #6 Team M1: Anna Kochalko Chris Moody Hong Tuck Liew John Wu Project Manager: Kartik Murthy October 10, 2007 Schematic Review!
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #6: “Optimized Schematics and Component Layout” 2/28/2007 Team M3 Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Camera Auto Focus Group W1 Tom Goff Dave Hwang Kate Killfoile Greg Look Design Manager: Bowei Gai Final Presentation, April 30 th, 2007 Project Objective:
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Camera Auto Focus Presentation 6, February 28 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Shiven Seth (W2-5) Presentation 1 MAD MAC st February,
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #9: “Layout and a New Feature” 4/4/2007 Team M3 Panchalam Ramanujan Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 15 Overall Project Objective : Dynamic Control.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Random Number Generator Dimtriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
Viterbi Decoder: Presentation #3 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Sprinkler Buddy Presentation #3: “System Level View and Floor Plan / Sizing” 2/07/2007 Team M3 Kartik Murthy Kalyan Kommineni Panchalam Ramanujan Sasidhar.
Alpha Blending and Smoothing
Presentation transcript:

Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager: Bowei Gai “Low Cost Irrigation Management For Everyone !”

Current Status Determine Project Develop Project Specifications Plan Architectural Design Determination of all components in design Detailed logical flowchart Design a Floor Plan Create Structural Verilog Make Transistor Level Schematic Layout Testing (Extraction, LVS, and Analog Sim.) Need to Exhaustively Test

Final Design Size Block (# used)Size (um) 40:20 Muxes (4)20 x 80 60:20 Muxes (2)20 x 120 Counter (2)12 x 17 KC ROM (1)181 x 8 P ROM (1)70 x 8 Metric Storage SRAMS (2) 181 x 60 Constant Storage ROM (1) 181 x 8 Floating Point Adder (4) 96x151 Floating Point Multiplier (2) 89 x Bit Registers (8)50 x um x 361 um ~ 1 : aspect ratio.129 mm^2 area.23 Density

Overview: FSMs ModeGatesFlopsOutputs Daily Update Hourly Update 5636 Comp. Mode 3036 Feed Back 3037 Power Gate 6767

Layout : FSMs Computation Mode

Layout : FSMs Feedback Mode

Layout : FSMs Daily Update

Layout : Entire Chip

Design Challenges and Implementation Decisions For The Past Week Design Challenge Translation to HW Low Power VDD Gating but had to forgo GND Gating

For Next Time Simulations.