W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team:

Slides:



Advertisements
Similar presentations
1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
Advertisements

Page 1 Lecture 12 Part 1: Laser Guide Stars, continued Part 2: Control Systems Intro Claire Max Astro 289, UC Santa Cruz February 14, 2013.
NGAO Systems Engineering Status Team Meeting #3 (Video) R. Dekany 13 December 2006.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
Trade Study Report: Fixed vs. Variable LGS Asterism V. Velur Caltech Optical Observatories Pasadena, CA V. Velur Caltech Optical Observatories Pasadena,
W. M. Keck Observatory Keck Next Generation AO Next Generation Adaptive Optics Irvine Meeting September 14, 2006 P. Wizinowich for NGAO Executive Committee.
Planets around Low-Mass Stars and Brown Dwarfs Michael Liu Bruce Macintosh NGAO Workshop, Sept 2006.
PILOT: Pathfinder for an International Large Optical Telescope -performance specifications JACARA Science Meeting PILOT Friday March 26 Anglo Australian.
NGAO Companion Sensitivity Performance Budget (WBS ) Rich Dekany, Ralf Flicker, Mike Liu, Chris Neyman, Bruce Macintosh NGAO meeting #6, 4/25/2007.
W. M. Keck Observatory’s Next Generation Adaptive Optics Preliminary Design & Path Forward Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
Impact of Cost Savings Ideas on NGAO Instrumentation December 19, 2008 Sean Adkins.
Aug-Nov, 2008 IAG/USP (Keith Taylor) ‏ Instrumentation Concepts Ground-based Optical Telescopes Keith Taylor (IAG/USP) Aug-Nov, 2008 Aug-Sep, 2008 IAG-USP.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
Low order wavefront sensor trade study Richard Clare NGAO meeting #4 January
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. ~ March 20, 2009 February 5, 2009 DRAFT.
NGAO Report February 18, 2009 Waimea NGAO Report February 18, 2009 Waimea P. Wizinowich for the NGAO Team.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting April 3, 2007.
California Association for Research in Astronomy W. M. Keck Observatory KPAO Keck Precision Adaptive Optics Keck Precision AO (KPAO) SSC Presentation January.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Photometric Accuracy Budget Strategy Richard Dekany.
NGAO Science Instruments Build to Cost Status February 5, 2009 Sean Adkins.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
The Future of AO at Keck Sept 2004 Mike Brown, for the AOWG and Keck AO team.
1 Keck NGAO Project Replan: Science Cases and Requirements Claire Max NGAO Team Meeting 6 April 25, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
NGAO Build to Cost Summary Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max & the NGAO Team SSC Meeting April 14, 2009.
High Redshift Galaxies: Encircled energy performance budget and IFU spectroscopy Claire Max Sept 14, 2006 NGAO Team Meeting.
NGAO Meeting #5 Introduction NGAO Meeting #5 Peter Wizinowich March 7, 2007.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting November 6, 2007.
What Requirements Drive NGAO Cost? Richard Dekany NGAO Team Meeting September 11-12, 2008.
NGAO Wavefront Error Performance Budgets R. Dekany 13 May 2010.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
W. M. Keck Observatory Subaru Users’ Meeting
LGS AO Readiness for 05B AOWG meeting February 4, 2004 Keck LGS AO team.
A visible-light AO system for the 4.2 m SOAR telescope A. Tokovinin, B. Gregory, H. E. Schwarz, V. Terebizh, S. Thomas.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
Adaptive Optics Nicholas Devaney GTC project, Instituto de Astrofisica de Canarias 1. Principles 2. Multi-conjugate 3. Performance & challenges.
AO for ELT – Paris, June 2009 MAORY Multi conjugate Adaptive Optics RelaY for the E-ELT Emiliano Diolaiti (INAF–Osservatorio Astronomico di Bologna)
Viewing the Universe through distorted lenses: Adaptive optics in astronomy Steven Beckwith Space Telescope Science Institute & JHU.
Early scientific goals for the MMT’s multi-laser-guided adaptive optics Michael Lloyd-Hart, Thomas Stalcup, Christoph Baranec, N. Mark Milton, Matt Rademacher,
March 31, 2000SPIE CONFERENCE 4007, MUNICH1 Principles, Performance and Limitations of Multi-conjugate Adaptive Optics F.Rigaut 1, B.Ellerbroek 1 and R.Flicker.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Keck Precision Adaptive Optics Authors: Christopher Neyman 1, Richard Dekany 2, Mitchell Troy 3 and Peter Wizinowich 1. 1 W.M. Keck Observatory, 2 California.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
NGAO System Design Project Plans and Schedule
Theme 2 AO for Extremely Large Telescopes
Trade Study Report: Fixed vs. Variable LGS Asterism
Theme 2 AO for Extremely Large Telescopes
Calibration Plan Chris Neyman W. M. Keck Observatory April 20, 2010.
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

W. M. Keck Observatory’s Next Generation Adaptive Optics (NGAO) Facility Peter Wizinowich, Sean Adkins, Rich Dekany, Don Gavel, Claire Max for NGAO Team: R. Bartos, J. Chin, A. Conrad, A. Delacroix, R. Kupke, C. Lockwood, J. Lyke, E. McGrath, D. Medeiros, D. Morrison, C. Neyman, S. Panteleev, C. Pollard, M. Reinig, T. Stalcup, S. Thomas, M. Troy, K. Tsubota, V. Velur, K. Wallace, E. Wetherell SPIE, San Diego June 28, 2010

2 Context for NGAO – growing demand for LGS-AO on large telescopes 2 Credit: M. Liu ~270 Keck AO science papers ~50% of Keck II science nights

3 NGAO - Next Generation AO Key New Science Capabilities Near Diffraction-Limited in Near-IR (K-Strehl ~80%) AO correction at Red Wavelengths (  m) Increased Sky Coverage Improved Angular Resolution, Sensitivity and Contrast Improved Photometric and Astrometric Accuracy Imaging and Integral Field Spectroscopy Key Science Goals Understanding the Formation and Evolution of Today’s Galaxies since z=3 Measuring Dark Matter in our Galaxy and Beyond Testing the Theory of General Relativity in the Galactic Center Understanding the Formation of Planetary Systems around Nearby Stars Exploring the Origins of Our Solar System

4 Flowed-Down Key Architectural Features

5 NGAO System Architecture Key Features: 1.Fixed narrow field laser tomography 2.AO corrected NIR TT sensors 3.Cooled AO enclosure 4.Cascaded relay 5.Combined imager/IFU instrument

66 NGAO: AO Layout

77 NGAO: AO Bench

88 LGS Wavefront Sensor Assembly

9 Low Order Wavefront Sensor Assembly

10 DAVINCI – Imager & IFS Entrance window Coronagrap h mask wheel Imager detector head Imager/IFS selector mirror Pupil imager wheel Filter and pupil mask wheels IFS detector head Grating selector wheel On axis imager 28.7" x 28.7" FOV –7 mas pixel scale On axis selectable IFS –50 mas pixel scale FOV 5.6" x 3" –35 mas, FOV 3.92" x 2.1" –10 mas, FOV 1.12" x 0.6" Adkins et al

11 AO Enclosure DAVINCI Instrument Overhead HEPAs LGSWFS Gowning Room Area AO Bench Secondary Instrument Interferometer DSM Thermal Management DM Electronics

12 LGS Facility TOPTICA/MPBC RC Optical

13 Control Loops – LGS AO Example

14 Control Loops – LGS AO Example

15 Control Loops – LGS AO Example

16 Control Loops – LGS AO Example

17 Control Loops – LGS AO Example

18 Control Loops – LGS AO Example

19 The RTC System Architecture is Mapped to the Critical Signal Paths 19 At the heart of the science wavefront control is the Tomography Engine Tomography Tip/Tilt TT Star Sharpenning Reinig & Gavel

20 Science Case Performance Summary Galaxy assembly: 30º zenith angle, 60º galactic latitude, 30 min integ.

21 NGAO Performance vs. Sky Coverage (Galaxy Assembly Science Case) 21 Strehl EE 35 mas EE 50 mas EE 70 mas Resid. TT error Nominal Ensquared Energy (EE) requirement = 30% sky coverage But very little degradation in EE even for 70% sky coverage Nominal Ensquared Energy (EE) requirement = 30% sky coverage But very little degradation in EE even for 70% sky coverage

22 NGAO is robust against conditions and design assumptions

23 NGAO changes the AO observing experience Monte Carlo performance estimate simulating 44 nights observing (Galaxy Assembly science case), drawing random values for r 0, wind speed, sodium abundance, and zenith angle Includes comparison with M. Liu’s measured K2 LGS data ( = 17%), the model prediction for K2 LGS ( = 20%), and NGAO predict ( = 70%)

24 Early Science Benefits from NGAO - 1 NGAO laser launch telescope –NSF-MRI (Aug/09) funding to procure & implement a K2 center launch telescope NGAO laser –Preliminary designs completed (Dec/09) from 2 vendors. Collaboration with ESO, AURA, GMT & TMT. TOPTICA/MPBC selected to begin final design. –MRI proposal submitted to procure & implement 1 st NGAO laser on K2. Collaboration with TMT & ESO

25 Keck II Center Launch + New Laser Predicted Performance for T Dwarf Binary Case Factor of 2x improvement  6x in dynamical mass determination R = 16.2 NGS 31” off-axis 50  zenith angle 1% photometry

26 Early Science Benefits from NGAO - 2 PSF reconstruction –Collaboration with Gemini & U. Groningen to demonstrate on-axis NGS AO PSF reconstruction on Gemini & Keck Jolissaint et al., –Plan to implement off-axis LGS AO PSF reconstruction with Keck –MASS/DIMM implemented (Sept/09) as a Mauna Kea facility Focal anisoplanatism reduction –Risk reduction to demonstrate 20% reduction using Cn2 data Tip-tilt vibration reduction –Risk reduction plan to prototype parametric oscillator on K2 AO NIR tip-tilt sensing (no object selection or AO correction) –ATI (Jun/10) funding to implement a near-IR tip-tilt sensor

27 NIR Tip-Tilt Sensor Predicted Performance for High Redshift Galaxies Case

28 Major Keck AO Science Capability Milestones Future Chin ; LMCT -69

In Closing Keck AO has been delivering great science NGAO will ensure cutting edge high angular resolution science for the US community NGAO PD funding from NSF/AURA TSIP Keck AO NGAO