1 IR NEG heating M. Sullivan MAC Review Dec. 13-15, 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.

Slides:



Advertisements
Similar presentations
S. N. HOM Impedance in Vacuum … 1 of 40 Sasha Novokhatski SLAC, Stanford University Machine-Detector Interface Joint Session April 22, 2005 HOM Impedance.
Advertisements

June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004.
1 Vacuum Pressure Calculations. 2 Vaccalc The program vaccalc was used for all calculations. The program required three pieces of information for each.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
BPM Upgrade Presented by: Nadine Kurita Contributors: S. Smith, S. Ecklund, J. Sebek, D. Martin, R. Hettel, R. Johnson, N. Reeck, M. Kosovsky, D. Arnett.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
12/13/2004 SN PEP-II MAC REVIEW 1 of 49 RECENT HOM CALCULATIONS HOM Dampers: Last Measurements and New Computer Designs Sasha Novokhatski PEP-II MAC Review.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Topics from this weeks 2E34 meeting M. Weaver Jan 6, 2006.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
SLAC Accelerator Department PEP-II Future Plans and Parameters John T. Seeman PEP-II MAC Meeting December 13, 2004.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
SiD Forward Region Tom Markiewicz/SLAC KILC’12, Taegu, Korea 24 April 2012.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
SR Vacuum Systems and Front Ends
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
VACCALC: A Program to find Beam pipe Pressure Profiles M. Sullivan Nov. 3, 2011 JLAB, CASA, MEIC.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
IR Heating Issues Stan Ecklund 4 August PEP-II Run 4 Post Mortem IR Heating Issues2 Overview of IR Heating Issues Vertex Bellows –Cooling added.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan International Review Committee November 12-13, 2007
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
The Interaction Region
John T. Seeman DOE PEP-II Operations Review April 26, 2006
M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
PSB-PS instrumentation for LIU
The PEP-II Interaction e+e- Factories Workshop
Impedance working group update
Weekend Summary Squirted N2 at 3027 under various conditions
PEP-II Status and Plans e+e- Factories Workshop
Interaction Region Design Options e+e- Factories Workshop
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Accelerator R&D Results from the B-factory
To Do list, open items as of 10-Feb \ Study threshold dependence on bunch length (Just changed Vrf to 4.5.
Some of the Points Raised During my JLAB Visit
SR Background Update for JLEIC
Update on IR7 Layout for a Crystal Collimation System with 8 Crystals
Presentation transcript:

1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade

2 IR NEG heating M. Sullivan MAC Review Dec , 2004 Outline History from last run Summer work Vacuum model Conclusions

3 IR NEG heating M. Sullivan MAC Review Dec , 2004 The NEG story When we regenerated the NEGs in IR2 on March 24 we began to wonder if some of the NEGs were starting to heat up from HOM power. MAC Review in April We confirmed that some were getting hot shortly thereafter but we did not get a full picture until the next ROD on June 3 when we instrumented every NEG in the upstream LER beam line. Regeneration temperature is about 750 °F

4 IR NEG heating M. Sullivan MAC Review Dec , 2004 Upstream LER plan view 136F side 160F side 150F bot 130F bot 150F bot 150F bot Collimators Quad chambers Dipole chambers 268  F 425  F 453  F 724  F LER current 2.2 A

5 IR NEG heating M. Sullivan MAC Review Dec , 2004 Collimator 724  F 268  F 453  F

6 IR NEG heating M. Sullivan MAC Review Dec , 2004 Lab test data of NEG outgassing as a function of temperature LER NEG Pump Temperatures Upstream LER side 350 °F

7 IR NEG heating M. Sullivan MAC Review Dec , 2004 Data from the two hottest NEGs NEG temperatures Pump pressure of The ion pump is between the two NEGs

8 IR NEG heating M. Sullivan MAC Review Dec , 2004 LER NEG Test chamber

9 IR NEG heating M. Sullivan MAC Review Dec , 2004 Test NEG data over the summer We held the test NEG at our regen temperature for a month with a Turbo pump attached

10 IR NEG heating M. Sullivan MAC Review Dec , 2004 Pressure in the test NEG Pressure as a function of time in the test NEG. Holding the NEG at the regen temperature of 725  F (400  C). After the first 6 hrs After about 48 hrs

11 IR NEG heating M. Sullivan MAC Review Dec , 2004                     Hydrogen Concentration Torr l/g Hydrogen Equilibrium Pressure (Torr) 200° C 300° C 400° C 600° C 500° C St707 Embrittlement Limit (20 Torr l/g) NEG heaters on NEG heaters off Ion pumps off Ion pumps on Heat NEGs for 1 hr degC Time 11:45-12:45 Tubro cart pump: 220 L/s Pressure at pump about Torr Some regeneration details

12 IR NEG heating M. Sullivan MAC Review Dec , 2004 LER upstream NEG work This summer: –We took out the nine NEGs with “c type” screens and installed a small HOM absorber in each cavity –The total length of NEG pumping that was removed is 5.5 m out of a total of 40.4 m –We removed the two movable collimators –We removed the Q4 NEG and have replaced it with a HOM absorber (another 1.6 m of pumping) –We have added extra pumping at the port between the upstream LER Q4 and Q5 chambers –In addition, we have added extra screening to the ion pumps in this region

13 IR NEG heating M. Sullivan MAC Review Dec , 2004 Existing 3082 chamber BPM Chamber support Cooling bar NEG plenum NEG heater Quad extrusion

14 IR NEG heating M. Sullivan MAC Review Dec , 2004 Chamber shown inverted and plenum not shown for clarity SiC HOM absorber

15 IR NEG heating M. Sullivan MAC Review Dec , 2004 Part of one of the NEG pumps that was removed this last summer

16 IR NEG heating M. Sullivan MAC Review Dec , 2004 One of the collimators that was removed The NEG in this chamber was one of the hottest

17 IR NEG heating M. Sullivan MAC Review Dec , 2004 HOM absorber to replace NEG pump

18 IR NEG heating M. Sullivan MAC Review Dec , 2004 Drawing of installed extra pumping

19 IR NEG heating M. Sullivan MAC Review Dec , 2004 Vacuum model We have started building a vacuum model of straight 2 Had great help getting started by a summer student (Edward Young) We have a preliminary model of the LER upstream beam pipe Still need to check on screen conductances and on outgassing values from SR fans Nevertheless we can get some idea about what happens to the vacuum pressure profile with the above LER NEGs removed

20 IR NEG heating M. Sullivan MAC Review Dec , 2004 Chamber Model Layout HER downstream LER upstream LER downstream HER upstream Support chamber Q5 NEG m m ST plot plot

21 IR NEG heating M. Sullivan MAC Review Dec , 2004 Support tube Vacuum Design Model Vacuum pressure in the support tube. The model predicts a pressure peak at the IP of about 20 nTorr.

22 IR NEG heating M. Sullivan MAC Review Dec , 2004 No radial ion pumps We lost these pumps a couple of years ago. One developed an Argon instability before it died. Both pumps do not work right now. We intend to replace these pumps during the next downtime.

23 IR NEG heating M. Sullivan MAC Review Dec , 2004 Upstream LER Ideal LER beam line from Q2 septum to about 63 m upstream

24 IR NEG heating M. Sullivan MAC Review Dec , 2004 Upstream LER after summer down

25 IR NEG heating M. Sullivan MAC Review Dec , 2004 HER scrubbing

26 IR NEG heating M. Sullivan MAC Review Dec , 2004 HER Upstream Q5 chamber We plan to replace this chamber BaBar Deadtime Diamond BW (HER) NEG temp in Q5 chamber

27 IR NEG heating M. Sullivan MAC Review Dec , 2004 The upstream HER NEGs and heater instrumentation The upstream HER beam pipe is also blanketed with NEG pumps starting at 21 m and going out to about 45 m from the IP There are a total of 4 vacuum chambers in this region with NEG pumping (6 long NEGs). All of the pumps are below the beam chamber. The screen is very similar if not identical to the “c type” screen seen in the LER The collimator at 35 m has a TSP The only chamber in this area without pumping is the fast kicker chamber

28 IR NEG heating M. Sullivan MAC Review Dec , 2004 HER upstream NEG screen This is a post at the center of the chamber

29 IR NEG heating M. Sullivan MAC Review Dec , 2004 NEG heater temperature through heater resistance Stan Ecklund has installed a circuit that measures some of the heater rod resistances He has instrumented: –LER upstream Q4 + Q5 (same circuit) BV1 + next outboard (3042) (same circuit) –HER Q5 downstream Q5 upstream BLF upstream This particular NEG pump can not be instrumented any other way

30 IR NEG heating M. Sullivan MAC Review Dec , 2004 Temperature plot of first “c” chamber in LER (BV1) Temperature plot of first “c” chamber in LER (BV1) using resistance measurement Agreement is no better than about 20%. The signal is complicated by the resistance being the sum of the leads plus another NEG heater BV1 NEG

31 IR NEG heating M. Sullivan MAC Review Dec , 2004 Q5 NEGs Q5 downstream Q5 upstream The upstream Q5 NEG resistance matches the TC we have in that NEG Conclusion: Downstream HER Q5 NEG is hotter than the upstream HER Q5 NEG

32 IR NEG heating M. Sullivan MAC Review Dec , 2004 Upstream HER BLF NEG This NEG is located m from the IP So far, this NEG looks OK We think we will be OK for run 5 We have instrumented all of these upstream NEGs with TCs

33 IR NEG heating M. Sullivan MAC Review Dec , 2004 Conclusions We have fixed the NEG pumps in the upstream LER beam pipe that were getting the hottest by removing the pumps and installing a HOM absorber in the pump cavity We removed the NEG pump that was closest to the septum chamber because HOM power was also heating up that pump and installed a HOM absorber in its place We removed the two movable collimators The run 5 beam parameters will increase the HOM power we have so far experienced by increasing the beam currents and shortening the bunches HOM power in IR2 will go up We have instrumented the upstream HER NEGs and we will be watching them very carefully during this coming run