Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Lorentz force detuning measurements on the CEA cavity
Power Requirements for High beta Elliptical Cavities Rihua Zeng Accelerator Division Lunds Kommun, Lund
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Various LLRF projects FNPL Fermilab/DESY May 4 th, 2005.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
RF controls for MICE Andrew Moss Sept 06. What we need A flexible easy to use solution to control the amplitude, phase and timing of the MICE RF amplifiers.
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
Q09/2001 The GEO 600 Laser System LIGO-G Z V. Quetschke°, M. Kirchner°, I.Zawischa*, M. Brendel*, C. Fallnich*, S. Nagano +, B. Willke° +, K.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy RF Field Control for 12 GeV Upgrade Tom Powers K. Davis,
Precision regulation of radio frequency fields at FLASH Christian Schmidt for the LLRF & LbSyn team LLRF workshop
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
1 LLRF Pre-readiness review (26th May, 2009) 27/10/2015 LLRF performance and its limitation based on KEK's experiments Shin Michizono (KEK) KEK’s LLRF.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
January 19, 2006PEP TFB R.Akre PEP II Transverse Feedback System Ron Akre William Colocho Anatoly Krasnykh Vojtech Pacak Dmitry Teytelman Uli Wienands.
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
Wojciech CICHALEWSKI, DMCS_TUL, Seminarium KMiTI LLRF in FEL System sterowania parametrami fali stojącej z zakresu częstotliwości mikrofalowych.
A preliminary approach to the needs of open loop control of the Lorentz Force Detuning is to generate a custom piezo control signal with proper and tunable.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
Cold Tuner test overview S1-Global at KEK 5-9 July 2010.
1 Global Design Effort Beijing GDE Meeting, February 2007 Global Controls: RDR to EDR John Carwardine For Controls Global Group.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Other Utilities of ALBA LLRF
John Carwardine January 16, 2009 Some results and data from January studies.
Digital LLRF: ALBA and Max-IV cases RF&Linac Section - ALBA Accelerators Division Angela Salom.
Performance of the cERL LLRF System Takako Miura (KEK) LLRF'15, Shanghai, Nov 4, 2015 (T. Miura) 1 Compact ERL (Energy Recovery LINAC)
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Superconducting RF: Resonance Control Warren Schappert PIP-II Machine Advisory Committee 10 March 2015.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
LFB, LLRF, TFB Alessandro Drago Annecy, March 2010.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
Project X ICD-2 Low Level RF Brian Chase Project X Collaboration Meeting September 11-12, 2009.
RF control and beam acceleration under XFEL conditions Studies of XFEL-type Beam Acceleration at FLASH Julien Branlard, Valeri Ayvazyan, Wojciech Cichalewski,
Low Level RF and Controls Brian Chase - LLRF Margaret Votava - Controls.
FNAL ILC LLRF Controls and Fast Tuner R&D Status Ruben Carcagno, Brian Chase, Gustavo Cancelo, Yuriy Pischalnikov (on behalf of the FNAL LLRF Working Group)
Director’s Review of the Project X Cost Range Estimate: Low Level RF Brian Chase Project X Director’s Review March 16, 2009.
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,
LLRF for PXIE Brian Chase For the Project X LLRF Collaboration 1 PX Collaboration Meeting, April 2012 Berkeley - B. Chase.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Microphonics Discussion For LLRF Design Review Tom Powers 13 June 2016 Not for release outside of JLAB There are several MSWord documents located at: M:\asd\asddata\C100Microphonics2016.
Bunch-by-bunch feedbacks and Low Level RF
LLRF Research and Development at STF-KEK
Overview and System Design for ESS LLRF Systems
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
ILC LLRF Status Ruben Carcagno, Brian Chase
Mechanical setups Lorentz Force Detuning System Setup
WP02 PRR: Master Oscillator and RF Reference Distribution
Jefferson Lab Low Level RF Controls
CW Operation of XFEL Modules
CW accelerating module test progress at DESY
High gradients in TESLA nine-cell cavities
LLRF Control System Outline Scope Requirements Design Considerations
Resonance Control for Narrow-Bandwidth, SRF Applications
Presentation transcript:

Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed loop with gain of 40  RMS amplitude noise ≈ 0.4%  RMS phase Noise ≈ 0.4°  run with beam  closed loop with gain of 40  RMS amplitude noise ≈ 0.4%  RMS phase Noise ≈ 0.4°  run with beam SIMCON3.1 with DOOCS  closed loop with maximum gain  RMS amplitude noise ≈ 0.02%  RMS phase Noise ≈ 0.2°  closed loop with maximum gain  RMS amplitude noise ≈ 0.02%  RMS phase Noise ≈ 0.2° SNS-LLRF with EPICS

 SIMCON2.1 Closed loop with maximum gain Achieved amplitude peak to peak noise of 0.07% Achieved phase peak to peak noise of 0.2° MATLAB interface  for development only  SIMCON3.1 Closed loop with gain of 50 MAX Developed DOOCS control interface Achieved amplitude peak to peak noise of 0.4% Achieved phase peak to peak noise of 0.4° Run with beam  SNS Closed loop with maximum gain Used EPICS control interface Amplitude peak to peak noise of 0.02% Phase peak to peak noise of 0.2° Capture Cavity 1at A0

Capture Cavity II at Meson no beam) Running closed loop with FB gain of 12 Running open loop and modifying the cavity resonance frequency using the piezo actuators 37% 1.04 ms (153 Hz) Measurement of the cavity half bandwidth ~153 Hz

Capture Cavity II at Meson no beam)  What we’ve achieved so far: Run closed loop, but with a feedback gain of 12 only (issue under investigation) LLRF support for some cryo tests (impact of RF power on cryo bath temperature) LLRF support for piezo tuner measurements  What our near term goals are: Achieve a higher feedback gain  upgrade SIMCON3.1 firmware  run at 1.8K  revise SIMCON3.1 hardware to reduce noise (ADCs, I/O, Power supply, external clocks…) Run CCII using SNS-LLRF system  What our long term goals are: Collaboration with DESY for the next generation SIMCON board R&D for an FNAL-LLRF system suited for ILC specs