Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
VISION MACHINE AUTOMATED SIEVE CERTIFICATION SYSTEM.
Loctite PSX-D and PSX-P Thermal Interface Materials
Presented by : Poorya Ghafoorpoor Yazdi Eastern Mediterranean University Mechanical Engineering Department Master Thesis Presentation Eastern Mediterranean.
This presentation is intended as a detailed WebEx, to bring potential customers to an understanding of Dream Report capabilities. This presentation focuses.
FireClass FC501. What’s FC501 ? An entry level Triple Circuit Single Loop addressable system featuring Intelli-Zone mapping An “out of the box” panel.
THERMO-MECHANICAL TESTS ON TRACKER LADDERS (Low temperature problem on plane 1) Status Report: D.Rapin Sept 26,2012 (help from Giovanni, Franck, Mingming,...)
TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
AS Computing Software definitions.
VBA: A BRIEF INTRODUCTION SEAMUS STEGENGA MEEN FEBRUARY 11, 2015.
Overview Trackaparcel booking system is very easy to use which sends up to minute information directly to the logistic company whilst building the manifest.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
©2009 Excel Experts. All rights reservedJune Johannesburg, South Africa Introduction An.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
To enhance learning, service, and research through an advanced information technology environment. Our Mission:To enhance learning, service,and research.
Visit the ccScan Website Scan, Import, and Automatically File documents to the Cloud SCAN, IMPORT, AND AUTOMATICALLY FILE DOCUMENTS TO DROPBOX Introduction.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Capabilities of Software. Object Linking & Embedding (OLE) OLE allows information to be shared between different programs For example, a spreadsheet created.
FPIX pixel module assembly Kirk Arndt on behalf of US CMS Pixel Mechanics R&D at Purdue and Fermilab.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Mark Maizonnasse, Creaform IMPROVEMENT OF AIRCRAFT MECHANICAL DAMAGE INSPECTION WITH ADVANCED 3D IMAGING TECHNOLOGIES.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
The IPSO Factor Enriching portfolios with market data.
Machine Machine language is PL in which program instructions are written in strings of 0s and 1s.The computer circuitry is wired in a manner that it can.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Multi-Axis Tabular Loads in ANSYS Workbench
T. Bowcock University of Liverpool
Ladder Assembly All tools and jigs produced Glue dispensing works
BASIC INFORMATION ABOUT DATABASE MANAGEMENT SOFTWARE
Status Brussels GANTRY
Rod adaptors for module tests Module positioning studies
FEA Introduction.
Download Orders, Shipments, and Receipts
UCSB Hybrid Bonding & Testing
FNAL Production Experience
AUTOMATED LIQUID DELIVERY SYSTEM
US Module Production Status
UCSB Testing Status Anthony Affolder
Results from module testing
Hybrid & Module Electrical Testing
OGP Surveying & DB Entry
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Presentation transcript:

Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review January 20, 2004

Slide 2-OGP status & module reinforcementDOE review, January 20, 2004 Overview of OGP OGP is commercial high precision (< 1 μm) automated measuring machine with programmable pattern recognition software Higher precision than gantry Provides independent survey of modules Used to cross check gantry calibration

Slide 3-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP 2002 Beginning to write programs on OGP to automate after cure survey. à Programs not very repeatable Manually enter data from OGP into excel spreadsheets à Time consuming à Prone to data entry error

Slide 4-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP today Reliable and repeatable programs written for all assembly plates à User friendly, only minimal knowledge of measurement software needed. Much faster than surveying on the gantry à Can survey 3 plates, 9 modules, on OGP in 20 min, same 3 plates take 45 min on the gantry à Frees gantry for production

Slide 5-OGP status & module reinforcementDOE review, January 20, 2004 New software Bought SmartReport software to interface with exiting measurement software à Enables direct exportation of survey results into excel à Eliminates possibility of data entry error Excel macros written to analyze data à Automatically converts numbers from OGP coords to module coords à Compares measured values to nominal values à Creates text files that are uploaded to database

Slide 6-OGP status & module reinforcementDOE review, January 20, 2004 Broken Bonds in Transport Four shipments of modules from the USA to CERN by 3 different methods of transport: à All were damaged in similar manner à Many broken bonds – particularly between sensor and pitch adaptor à Very time consuming repair work At UCSB we performed extreme drop tests that also resulted in sensor to sensor bonds being broken as shown above

Slide 7-OGP status & module reinforcementDOE review, January 20, 2004 Reinforcement with Sylgard After many studies (drop, vibration, and thermal), TOB and TEC modules all found to be fragile UCSB developed a reinforcement technique using Sylgard. Sylgard is a silicon based encapsulant à Used to encapsulate ALL wire bonds on innermost layer of CDF à Working temperatures –50C to 200C à Radiation hard à Low thermal conductivity Apply this material to back sides of modules at sensor-PA joint and sensor-sensor joint

Slide 8-OGP status & module reinforcementDOE review, January 20, 2004 Drop Test Results With minimal packaging we dropped the reinforced modules 1 meter! à Almost all bonds broke on the control module (with no reinforcement) à No obvious deterioration of bond pull strengths for reinforced modules

Slide 9-OGP status & module reinforcementDOE review, January 20, 2004 Automating reinforcement Bought small gantry and glue dispensing robot to automate reinforcement à Faster and more uniform that applying by hand à Uses static mixer to dispense glue eliminating air bubbles in glue –saves time evacuating air bubbles à Both machines are easy to program and easily communicate with each other

Slide 10-OGP status & module reinforcementDOE review, January 20, 2004 Glue Gantry Designed bracket to mount glue dispenser to gantry and fixture for module carriers Program written to dispense glue beads à Have reinforced 17 modules Very fast, can reinforce 20 modules in 15 minutes à At peak production plan on 15 modules per day Glue beads are very uniform

Slide 11-OGP status & module reinforcementDOE review, January 20, 2004 Conclusion OGP automated and results are uploaded to database à Frees up gantry for production increasing our daily production capacity OGP provides more precise measurements than gantry à Also provides an independent measurement of gantry Problem found with wire bonds breaking during transportation à Studies found application of Sylgard beads to modules solves this problem Bought small gantry to automate reinforcement process à Can reinforce modules in a minimal amount of time