 Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
The MICE target and the ISIS BPS system By Edward Overton 1.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
K. Long, 13 June, 2015  Target K. Long, Friday, 24 th April 2009.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Inspection of T2#2 documented in MICE Note 272 Some issue with Notes site … couldn’t.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
1 MICE Radiation Shutter Description Present status Plans, schedule and remaining work MICE CM26, 24-27th March, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.
Data Read Noise on AR1BL. AR1BL On Detector Noise Investigation Modified ARBL K0008 to reduce clock and data read pickup. Confirmed most conclusions from.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Top Secret Secret Internal use only Public Water Valves.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
© Tally Solutions Pvt. Ltd. All Rights Reserved Shoper 9 LiveUpdate March 2010.
ATLAS-CMS Batteries ATLAS - - 2x MSS battery banks + 2x Quench Heater banks - - MSS systems OK (6 hrs minimum) - - HEC batteries promised for week 25,
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Installation Plan. Requirement Assemble and test two complete target systems in time for August shutdown How do we do this? What do we need to.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Solar Decathlon Scheduling App By Christopher Cutlip.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Collaboration With DTTN 30 Aug Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure.
Solar Decathlon Scheduling App By Christopher Cutlip.
TIME MANAGEMENT Study Skills. What can time management do for you? Get your work done Do it well Turn it in on time.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
Target Installation Plan
Animation of a planning
Preliminary Review of LERF as Cryomodule Testing Facility for LCLS-II
MICE Target Report Video Conference 29/11/07
1. Open any Office 2016 app, such as Word, and create a new document.
Direction water flow Notes: Occupancy type is PUBLIC The WCs (toilets) are public flush valve.
Quicken Installation Related Problems More info :
The Define Phase Templates and Worksheets
Modified at -

Presentation transcript:

 Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test

Status of build: Target 1: – Complete, 50 k actuations done OK Target 2: – Complete

Critical path: Issue: – Modified power supply: Charge/discharge time-constant differs between +ve and –ve capacitor banks S.Griffiths will investigate – Testing continues with power supply brought to RAL form Sheffield Installation planned ‘on schedule’: – Tuesday/Wednesday 25/26Aug09