Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 1 ILC Test Beam *On behalf of the HEP group at UTA. Introduction What has been happening? Beam Test Timeline.

Slides:



Advertisements
Similar presentations
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
First analysis of DHCAL Data José Repond Argonne National Laboratory Linear Collider Workshop LCWS 2012 October 22 – 26, 2012 University of Texas at Arlington,
31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Worldwide testbeam session summary Felix Sefkow DESY ECFA workshop Durham September 4, 2004.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
July 2003American Linear Collider Workshop Cornell U. Development of GEM-based Digital Hadron Calorimetry Andy White U.Texas at Arlington (for J.Yu, J.Li,
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
Report from CALICE meeting CERN 9/23-23/2002 Andy White Web Site for meeting: agenda_CALICE_23090.html.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
08/04/05Erika Garutti1 Status of Detector R&D March 18-22: in LCWS05 Latest news on: - detector concept - detector R&D - dead lines and schedules - test.
Plans for Linear Collider Calorimetry Test Beam Work at Fermilab Andy White for U.S.+European-CALICE and other collaborators.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
1 Snowmass2005 report 2005/09/26 H. Matsunaga GLDCAL meeting.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
CALICE Digital Hadron Calorimeter: Calibration and Response to Pions and Positrons International Workshop on Future Linear Colliders LCWS 2013 November.
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Development of Digital Hadron Calorimeter Using GEM Shahnoor Habib For HEP Group, UT Arlington Oct. 12, 2002 TSAPS Fall ’02, UT Brownsville Simulation.
9/2/2004 TB Strategy J. Yu 1 LC Test Beam Funding and Strategy Large number of detector R&D groups made great progress Technology decision provides great.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Test Beam: Calorimetric Wishes… Steve Magill, Jose Repond, Andre Turcot, Jae Yu* Jan. 10, 2003 Goals for calorimeter test beam What’s needed for EFA? Requirements.
José Repond Argonne National Laboratory LCWS, Vancouver, Canada, July 19 – 22, 2006 American Test Beam Plans.
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
SiD Detector Concept R&D Perspective Andy White SiD R&D Coordinator University of Texas at Arlington.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE SiW Electromagnetic Calorimeter Testbeam performance and results Roman Pöschl LAL Orsay ACFA/GDE Wordshop – TILC '08 Sendai Japan - Mar
Beam test of Silicon-Tungsten Calorimeter Prototype
CALICE Silicon ECal Sensors Status and prospects
the CALICE test beam set-up and running experience
SiD Calorimeter R&D Collaboration
LC Test Beam Activities
Preparation for CERN test beam
Hadronic Shower Structure in WHCAL Prototype
Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN
ScECAL+AHCAL+TCMT Combined Beam FNAL
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Technical Board – DCAL Software
GEM-based Digital Hadron Calorimetry for SiD
GEM DHCAL Status and Plans
Michele Faucci Giannelli
Calice Tile-HCal and Tail-catcher/Muon Tracker
LC Calorimeter Testbeam Requirements
Presentation transcript:

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 1 ILC Test Beam *On behalf of the HEP group at UTA. Introduction What has been happening? Beam Test Timeline World-wide TB Organization Conclusions LCWS2005 at Stanford March 18 – 22, 2005 Jae Yu University of Texas at Arlington

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 2 Introduction There was so~~ much work done Can’t do justice in a 15 minute talk I am sure I have left out some important activities Please forgive me of this… Now the REAL introduction!!! Pre-

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 3 The Real Introduction ILC TDR timeline puts urgency on detector R&D –Det. CDRs by 2007, followed by LOIs in 2008 Detector R&D activities maturing rapidly –Many of them need beyond-the-prototype-and-cosmic- ray testing PFA development also picking up speed –Hadronic shower behaviors need better understanding G. Mavromanolakis et al. ~60%

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 4 What has been happening? Tremendous activities in the past year –Calorimeter related CALICE ECAL electronics run at DESY together with Asian drift chambers Korean SiW ECAL at CERN –Tracker TB’s –MDI and beam instrumentation experiments –Etc..

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 5 Structure 1.4 (1.4mm of W plates) Structure 2.8 (2×1.4mm of W plates) Structure 4.6 (3×1.4mm of W plates) ACTIVE ZONE (18×18 cm 2 ) Multi-layer (30) W-Si Prototype : 3 independent C-W alveolar structures according to the thickness of tungsten plates (1.4, 2.8 and 4.2 mm) 30 detector slabs which are slid into central and bottom cells of each structure Active zone : 3  3 wafers  30 layers 270 Wafers Si with 6×6 pads (10×10 mm 2 ) Design and Prod : LLR Integration : LLR Prod : 150 MSU (Russia) 150 IOP (Czech republic)  3 structures W-CFi ( 1,2,3 x1.4mm)  30 « detteur slabs »  Dimension 200x360x360 mm  9720 channels in the proto. CALICE ECAL TB at DESY G. Geycken

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 6 Cells in red : Signal > 20% of MipCells in red : Signal > 50% of Mip CALICE ECAL TB at DESY G. Geycken

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 7 50 GeV Electron 50 GeV pion 150 GeV Muon Total ADC of an event / 640 Beam Direction Layers of Si sensors and Tungstens Frontend readout boards Digital and Control Boards Korean SiW ECAL TB at CERN PEDs K. Kawagoe

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 8 MDI & BI Europe (EUROTeV) –EUROTeV Four beam diagnostics Three beam delivery systems –UK LC-ABD (Linear Collider – Accelerator Beam Delivery) Asian –Laserwire (beam spot size and emittance, energy spread) –Nano-BPMs (for FF optics test, energy spectrometer) –IP Beam stabilization (FONT/FEATHER + for FF optics test) –Compact Final Focus optics (proposed) North American –T-474: BPM Energy Spectrometer Development –T-475: Synchrotron Stripe Energy Spectrometer Development Many more activities are in preparation M. Woods

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 9 What has been happening? Tremendous activities –Calorimeter related CALICE ECAL electronics run at DESY together with Asian drift chambers Korean SiW ECAL at CERN –Tracker TB’s –MDI and beam instrumentation related activities –Etc.. A lot of groups are preparing for TB in the next couple of years

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 10 VME VFE Electronics Movable table BEAM Beam monitoring CALICE Combined TB G. Geycken

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 11 Tail Catcher ECAL HCAL Electronic Racks Beam CALICE Setup V-Trial at FNAL MTBF

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 12 What has been happening? Tremendous activities –Calorimeter related CALICE ECAL electronics run at DESY together with Asian drift chambers Korean SiW ECAL at CERN –Tracker TB’s –MDI and beam instrumentation related activities –Etc.. A lot of groups preparing for TB in the next couple of years Three US Calorimeter groups (SiW Ecal, GEM and RPC DHCAL) submitted a NSF MRI proposal ($960k) for development of TB modules An ILC planning document submitted to Fermilab (FNAL– TM–2291)FNAL– TM–2291 –FNAL directorate has asked all divisions for impact statements We are asked to make a presentation at FNAL PAC meeting Apr. 7 – 9

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 13 Planning Document to FNAL Initial draft written at the ANL workshop in Sept. –As agreed at ECFA meeting Result of the World-wide LC CAL/Muon TB Working Group –Many thanks…. Total of 25 pages w/ –Overview of TB plans and requirements –Will be followed by detailed MOUs Submitted to FNAL on Feb. 22, 2005 J. Repond

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 14 CalorimeterProjectLead institution ECAL Silicon-Tungsten (CALICE)LLR Silicon-Tungsten (US)SLAC, Oregon Scintillator-TungstenShinshu Scintillator-TungstenColorado Scintillator-Silicon-TungstenKansas Scintillator-Silicon-LeadPadova HCAL Scintillator-SteelDESY RPC-SteelITEP, ANL GEM-SteelUTA Muon-detectors/tail catcher Scintillator-SteelDESY/FNAL/NIU RPC-SteelFrascati 28 institutions from 3 regions Total of 11 Projects in the Document J. Repond

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 15 ParticleEnergy range Electrons 3 – 20 GeV → 1 – 20 GeV Pions 3 – 66 GeV → 1 – 66 GeV Protons 3 – 66 GeV, 120 GeV Muons 3 – 20 GeV, momentum selected Muons Not momentum selected Both polarities Rates in part not to exceed 100 Hz Beam Momentum Requirements J. Repond

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 16 MTBF has been receiving beam for about a year –Electrons of energies 4 – 16 GeV observed First large contact between CALICE and FNAL made this past Wednesday –Some concerns with MTBF pointed out to the lab Experimental Area related Duty factor: one 5 sec slow spill every 2 min starting April 05 Late arrival time of beam element triggers (200ns) Beam tune optimization –Will work with Fermilab on these concerns Fermilab beam will be shut down for DØ and CDF upgrades starting Oct. for 2 – 4 mos. Possibility of test beam availability at CERN being raised and will be investigated TB Facilities

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 17 Electrons at MBTF 16 GeV/c 8 GeV/c4 GeV/c Energy Measurements with BTeV EMCAL prototype w/o CC tags 2% electrons ~90/spill 25% electrons ~10-20/spill 10% electrons ~40/spill Significant material (air, counters) in beam line Needs vacuum (44 feet), helium bag Easily factor of 2 improvement J. Repond

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 18 VTX, Tracking and Muons VTX and Tracking group plans to put down requirements for beam tests –Less stringent beam requirement compared to CAL Broader facility options But still need to specify requirements –Massimo Caccia and Dave Bailey will collect the requirements and put together a draft by Snowmass Tail Catcher and Muon Detectors –One TC and two separate muon prototypes in preparation D. Bailey, H.E.Fisk

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 19 CALICE SiW ECAL CALICE TILE AHCAL+TCMT OTHER ECALs CALICE DHCALs Combined Calorimeters PFA and shower library Related Data Taking >2009 ILCD R&D, calibration Phase I: Detector R&D, PFA development, Tech. Choice Phase II Phase 0: Prep. Timeline of Beam Tests MDI, , tracking, etc

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 20 World-wide TB Organization Regional TB contacts –Europe: F. Sefkow & V. Vrba –Asia: K. Kawagoe –North America: G. Fisk & J. Yu Given the anticipated degree of TB efforts, the regional contacts agreed to –Teleconference every 6 weeks to keep each other posted on regional efforts and coordinate –An incremental update to the status document released last fall –Your help for informing us is greatly appreciated

Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 21 Conclusions Tremendous amount of activities –Anticipated to increase dramatically –Though US CALTB activities rely heavily on availability of funds Limited number of facilities for a combined calorimeter beam tests –CERN possibility to be investigated VTX and Tracking integration effort begun –Requirement document by Snowmass Fermilab is working closely with LC TB community WW coordination effort to pick up momentum